Citi Housing (Pvt) Ltd – Sialkot

Building Control Check Stages


Plot # _________ Block _____ Phase ___ Owner’s Name___________________________, CNIC ___________________

Signatures: Owner _____________, Surveyor _____________, Building Inspector _____________, Date _____________

Check Stages:

1. When the layout is complete before starting the excavation:

Date Remarks Building Inspector Owner

       
2. After completing excavation and before starting brick work:

Date Remarks Building Inspector Owner

       
3. On completion of boundary wall at DPC level

Date Remarks Building Inspector Owner

       
4. On construction of main building at DPC level

Date Remarks Building Inspector Owner

       
5. Before pouring roof slab of porch and ground floor

Date Remarks Building Inspector Owner

       
6. On raising of first floor structure 3 feet above roof of ground floor

Date Remarks Building Inspector Owner

       
7. Before pouring roof slab of 1st floor

Date Remarks Building Inspector Owner

       
8. On making UGWT, Septic Tank, OHWT and Ramp

Date Remarks Building Inspector Owner

       
9. On final completion before occupation at the time of getting sewer / water connection

Date Remarks Building Inspector Owner

       