Professional Documents
Culture Documents
3 Enter ZR, and zoom in to the top right corner of the model.
If the floor lines do not create a closed sketch, the sketch is invalid and
you need to clean the lines up. To be valid, the sketch must be a closed
loop with no disconnected or crossing lines.
6 In the alert dialog, click Yes. The walls that finish on the lower level
would be trimmed to the underside of the floor.
In this exercise, you add walls on the ground floor and the first floor, and then modify the walls to create
rooms in the building.