Professional Documents
Culture Documents
Page 1 of 7
AMIGOS Co. Ltd., Quality Management Ref: ASP-031 -1
Dong Xuyen Industrial Park. System Procedure Rev: A
Ward 10, Issue: 1
Packing and Dispatch
Vung Tau City. Date: 09th November 2004
Procedure
S.R. Vietnam Page 2 of 7
Page 2 of 7
AMIGOS Co. Ltd., Quality Management Ref: ASP-031 -1
Dong Xuyen Industrial Park. System Procedure Rev: A
Ward 10, Issue: 1
Packing and Dispatch
Vung Tau City. Date: 09th November 2004
Procedure
S.R. Vietnam Page 3 of 7
CONTENTS
SECTION TITLE
1.1 PURPOSE
1.2 SCOPE
1.3 DEFINITION
2.0 GENERAL
2.1 REQUIREMENTS
2.2 RULES
3.0 Responsibility
4.0 Documentation
Page 3 of 7
AMIGOS Co. Ltd., Quality Management Ref: ASP-031 -1
Dong Xuyen Industrial Park. System Procedure Rev: A
Ward 10, Issue: 1
Packing and Dispatch
Vung Tau City. Date: 09th November 2004
Procedure
S.R. Vietnam Page 4 of 7
1.1. Purpose:
This procedure defines the requirements for the packaging and dispatch of all
1.2. Scope:
This procedure shall apply to all materials for shipment and complies with all
1.3. Definitions:
1.3.1. Packaging:
1.3.2. Dispatch:
applicable guidelines.
2. GENERAL:
2.1 Requirements:
Page 4 of 7
AMIGOS Co. Ltd., Quality Management Ref: ASP-031 -1
Dong Xuyen Industrial Park. System Procedure Rev: A
Ward 10, Issue: 1
Packing and Dispatch
Vung Tau City. Date: 09th November 2004
Procedure
S.R. Vietnam Page 5 of 7
o All finished items which ready for packing shall be protected with suitable
packed items are meeting all project’s requirements and ready for dispatch.
o The exterior of the containers, boxes and crates shall be clearly marked to
2.2 Rules:
o Containers, boxes or crates shall not be sealed until a Q.C final inspection
o Containers, boxes and crates shall be stored in accordance with the clients
Page 5 of 7
AMIGOS Co. Ltd., Quality Management Ref: ASP-031 -1
Dong Xuyen Industrial Park. System Procedure Rev: A
Ward 10, Issue: 1
Packing and Dispatch
Vung Tau City. Date: 09th November 2004
Procedure
S.R. Vietnam Page 6 of 7
o Removal of containers, boxes or crates of finished items from the lay down
area shall require the approval of the Project Manager or his nominated
deputy.
3.0 Responsibility:
o QA/QC is response to make sure all released items for packing are
o Any damaged items found during packing shall be “Hold” and these
items can be released for packing only when it was re-inspected and
accepted by QC inspector
4.0 Documentation:
dispatching traceability.
Page 6 of 7
AMIGOS Co. Ltd., Quality Management Ref: ASP-031 -1
Dong Xuyen Industrial Park. System Procedure Rev: A
Ward 10, Issue: 1
Packing and Dispatch
Vung Tau City. Date: 09th November 2004
Procedure
S.R. Vietnam Page 7 of 7
5.0 Appendix :
Page 7 of 7