1. Introduction: PUF (Poly Urethane Foam) insulated chambers of size ~20’ x 8’ x 8’ have to be
fabricated. The chambers are designed to maintain a few experimental setups at ~0°C. Each chamber
consists of a steel structure to transfer weight of all loaded components to ground. The same steel
structure will be used to support and guide PUF insulated panels to be fitted in to the chamber. This
chamber will have four doors, two on each 8’ x 8’ face for loading and unloading of components in
and out of chamber. The chamber will also have ISO mounts at the top and bottom corners in order
to have provision for fixing to any trailer and lifting with the help of twist locks.
2. Quantity: 02 Numbers
3. Scope of Work:
a. Fabrication of steel structure fitted with PUF panels along with ISO mounts on chamber bottom
and top corners will be in the scope of the supplier. The fabrication & fitting of PUF insulated
doors maintaining air tightness, is also in the scope of the supplier. (See attached drawings for
reference. Indicative dimensions are provided in drawings which are suggested for tender
purpose only. Exact external dimensions of the chamber are specified in table below.)
b. Supplier shall prepare the fabrication drawings of the chamber and shall submit them for
approval to RRCAT. Only after approval, fabrication of the structure shall be carried out.
Supplier shall also submit thermal conductivity test report of PUF panels for approval to
RRCAT. Only after approval, these panels shall be fitted to the structure.
c. Scope of work also includes preparation of manufacturing documents, procurement of all the
materials required for the job etc. as per the specifications, manufacture, assembly, inspection,
testing, packing, transportation, supply, safe delivery, unloading at purchaser’s site in RRCAT,
Indore and guarantee of thermal insulation and air leak tightness.
d. Design and manufacture (with manufacturer's material) of jigs, fixtures and tooling required for
manufacture, handling, assembly, inspection and testing of thermal insulation is in the scope of
manufacturer.
e. Assembly of the system at RRCAT (if required) will be in the scope of the supplier.
4. Bidders Qualification:
a. The manufacturer shall have fabricated and supplied at least one PUF insulated chambers of at
least half the size in last five years. Performance certificate or PO details in the same effect shall
be provided.
1
5. General Specifications: The insulated chamber has to be fabricated such that it meets following
specifications:
2
Doors Chamber will have two doors on each 8’x8’ face, each of which
will be PUF panels insulated.
The Doors shall be made such that they are leak tight for any
major leakage of air through the seals.
Doors and corresponding section of structure protruding inside
chamber storage space shall have G-10 heat bridge (refer attached
drawings)
Doors shall be sealed through two seals namely O type on inside
and J type on outside (refer drawings for more details) made of
EPDM material
The supplier shall provide sufficient provision for locking of the
doors and shall guarantee trouble free operation of these locks
for 3 years.
One small door 3’x3’ shall be provided on one side face on
partition side of chamber with J type seal only. (refer drawings)
Small door on middle partition (~500mm x 700mm) shall be
provided with sealing arrangement of O and J type seals. (refer
drawings)
Structure Material of Structure: Mild Steel (See attached drawings for
dimensions)
Structure shall be fitted with ISO mounts on bottom and top
corner fittings so that it can be fixed on a twist lock trailer and
can be lifted from the top.
ISO corner mount dimensions and positions shall be as per
relevant standards mentioned in Section 6 of this document.
Container external dimensions shall conform to relevant standard
mentioned in Section 6 of this document.
Forklift pockets to lift containers shall be provided.
Partition The chamber will have one partition across its length located at
~1m from one end/one door
The ~1m side of chamber will be further partitioned into four
different chambers, as per attached drawings
Partition will be made of PUF insulation only.
There will be a few openings on the partition and supplier shall
ensure proper sealing of open PUF surfaces for any
water/moisture ingress.
One of the four partitions will also have separate door (~500mm
x 700mm) sealed through O and J type seals.
The bottom horizontal partition will also have a 3’x3’ door
through one side wall sealed through J type seal only. (refer
drawings)
Stickers on side walls Side faces of chamber shall be pasted with high quality vinyl
3
printed stickers as per theme provided by PURCHASER in soft
copy.
Four vinyl printed logos of 2’x2’ size shall also be pasted on all
four doors of container.
Quantity 03 Numbers
7. Pre-dispatch Inspection:
RRCAT representatives reserve the right to monitor fabrication of PUF panels fabrication at
manufacturer’s or its associate’s site. RRCAT also reserves right to witness fabrication processes
during fabrication and assembly of this chamber. The fabricated chamber will be inspected for all
major dimensions, Insulation panels’ thicknesses, Insulation panels’ edge sealing for seepage of
water at supplier’s site. Only after approval from RRCAT representatives, dispatch shall be
initiated.
9. Acceptance Criteria
a. The fabricated insulated chamber will be checked for all major dimensions after delivery at
RRCAT.
b. PUF panel thermal conductivity test report shall be submitted.
10. Guarantee/Warranty
The chamber supplied shall be guaranteed for any manufacturing defects for minimum period of
12 months after acceptance of the insulated chamber at RRCAT. The leak tightness of insulation
panels to water seepage shall also be guaranteed for a period of 12 Months after acceptance at
RRCAT. Any guarantee clause mentioned elsewhere in the specification document is also
applicable.