Professional Documents
Culture Documents
Manifacturing Line
Manifacturing Line
Control
Project:
RAW MATERIALSTORAGE
3599.9
49.00
Drawing name:
Drawing NO.:
MANUFACTURING LINE
Date: Scale:
B:04 (workers building)
Revision
No Date Approval
AL WASEAD AL AQARIYA
ALNAJMA BUILDING - AIRPORT ST. 1215/LIBYA
Mob: +218 91 640 64 64 EMAIL: Info @alwasead.com
Project No: NO.BN.FC02
Notes :
STEEL :
Design according ( EC 3 (EN 1993-1-1:2005)) Code.
Before starting execution drawings should be compared
and any different should be checked direct with
consulting engineer.
All dimensions are in milimeters.
Materials list :
S.3
1
Basic Steel material: S235
Steel material for pipe RHS S235JR, for plate
S235JRG2.
10
Welding electrodes for connections two pipe
10
7
3
8
2
4
Inside wall cover =2.5 cm
elements.
All welding seams are of "C" quality and are to be
5beam
1
80.00 490.00 80.00 490.00 80.00 490.00 80.00 490.00 80.00 490.00 80.00 490.00 80.00 490.00 80.00 REINFORCMENT:
310.00
Foundation was designed to carry basement, ground and first floor.
80.00
A
A
Bearing capacity 250KN/m3
Materials list :
Steel strength should not be less than 3500 kg/cm²
for diameters 12-14 mm.
Steel strength should not be less than 2500 kg/cm²
for diameters 10 - 8 mm.
Steel strength should not be less than 1800 kg/cm²
550.00
550.00
477.57
for diameters 6 mm.
320.00
320.00
Compressive strength for concrete should not be
less than 250 kg/cm² at 28 days .
60.00 3990.95 60.00 Plain concrete strength should not be less than 200
kg/cm² at 28 days .
65.00 Concrete cover to main reinforcement :
Foundation Concrete cover = 5 cm.
Columns & beams concrete cover = 2.5 cm.
Slabs cover = 2.5 cm.
150.00
150.00
64.93
Outside wall cover = 4 cm. next beam span.
B
B
For continuous beam steel should be bent at
span and continuo to
Upper reinforcement in cantilever rib or beam should
be extend one and half its length inside next span .
190.00
Distance between steel bars should not be less than 2.5
cm and in other cases steel bars should be in two layers.
550.00
400.00
485.00
400.00
190.00
Owner:
Alwasead CO.
2200.00
2200.00
150.00
150.00
65.00
C
C
Project:
WOOD FACTORY
MANIFACTURING LINE
550.00
550.00
400.00
485.07
400.00
Project No:
Site:
NO.BN.FC.02
BENGHAZI
150.00
150.00
64.93
D
D
Drawing name:
Foundation
320.00
320.00
Drawing NO.:
477.50
550.00
550.00
WD-018-00-00-AR-002-00
Drawing Type: Revision No:
Structuralctural Drawing 00
310.00
310.00
80.00
E
E
9
9
Date: Scale:
08/02/2021 1:100
80.00 490.00 80.00 490.00 80.00 490.00 80.00 490.00 80.00 490.00 80.00 490.00 80.00 490.00 80.00
250.00 320.00 250.00 320.00 250.00 320.00 250.00 320.00 250.00 320.00 250.00 320.00 250.00 320.00 250.00
570.00 570.00 570.00 570.00 570.00 570.00 570.00 Revision
No Date Approval
4240.00
10
10
7
3
8
6
2
10
10
Welding electrodes for connections two pipe
7
5
8
2
4
elements. Inside wall cover =2.5 cm
5beam
40.00
Foundation was designed to carry basement, ground
HE340A
A
A
HE340A
HE340A
HE340A
HE340A
HE340A
HE340A
HE340A
and first floor.
Bearing capacity 250KN/m3
Materials list :
Steel strength should not be less than 3500 kg/cm²
for diameters 12-14 mm.
Steel strength should not be less than 2500 kg/cm²
for diameters 10 - 8 mm.
550.00
550.00
Steel strength should not be less than 1800 kg/cm²
for diameters 6 mm.
Compressive strength for concrete should not be
less than 250 kg/cm² at 28 days .
Plain concrete strength should not be less than 200
kg/cm² at 28 days .
Concrete cover to main reinforcement :
Foundation Concrete cover = 5 cm.
Columns & beams concrete cover = 2.5 cm.
Slabs cover = 2.5 cm.
B
B
Outside wall cover = 4 cm. next beam span.
IPE 200
IPE 200
550.00
Connection between two bars should not be less
SOLID than 50 Ø.
SOLID
SLAB
0.00 SLAB
Owner:
15+5
15+5
Alwasead CO.
2280.00
2200.00
2200.00
2280.00
C
IPE 200
C
Project:
IPE 200
WOOD FACTORY
MANIFACTURING LINE
550.00
550.00
Site: Project No:
NO.BN.FC.02
BENGHAZI
D
D
IPE 200
Drawing name:
IPE 200
Drawing NO.:
550.00
550.00
WD-018-00-00-AR-003-00
HE340A
HE340A
HE340A
HE340A
HE340A
HE340A
HE340A
HE340A
Drawing Type: Revision No:
Structuralctural Drawing 00
E
E
9
9
40.00
40.00
40.00 Date: Scale:
40.00
570.00 570.00 570.00 570.00 570.00 570.00 570.00 08/02/2021 1:100
3990.00
4070.00
Revision
No Date Approval
10
10
7
3
8
2
AL WASEAD AL AQARIYA
ALNAJMA BUILDING - AIRPORT ST. BENGHAZI/LIBYA
PROJECT NO: NO.BN.FC.02 Mob: +218 91 640 64 64 EMAIL: Info @alwasead.com
Notes :
STEEL :
Design according ( EC 3 (EN 1993-1-1:2005)) Code.
Before starting execution drawings should be compared
and any different should be checked direct with
consulting engineer.
All dimensions are in milimeters.
Materials list :
10
Basic Steel material: S235
10
7
3
8
2
4
Steel material for pipe RHS S235JR, for plate
S235JRG2.
Welding electrodes for connections two pipe
elements. Inside wall cover =2.5 cm
S.3
1
Unmarked corner seam thickness is 0.7 on the
thickness of the thinnest points related, excluding
hollow profiles, when the seam thickness is equal to
the profile wall thickness.
Protect the steel structure with a corrosion coating.
3990.00
570.00 570.00 570.00 570.00 570.00 570.00 570.00 REINFORCMENT:
Design according ( EC2 -EN 1991) Code.
Before starting execution drawings should be compared
UPN140 UPN140 UPN140 UPN140 UPN140 UPN140
UPN140 and any different should be checked direct with
A
A
IPE160 IPE160 IPE160 IPE160 consulting engineer.
All dimensions are in meters.
CA IPE160 IPE160
C CAE CAE IPE160 Foundation was designed to carry basement, ground
E5 AE5 50x5 50x5
0x 0x5 CAE CAE CA and first floor.
5 50x5 50x5 E5 Bearing capacity 250KN/m3
0x
5
IPE160 IPE160 IPE160 IPE160 IPE160 IPE160 IPE160 Materials list :
Steel strength should not be less than 3500 kg/cm²
UPN140
CA CA for diameters 12-14 mm.
550.00
550.00
E5 E5 Steel strength should not be less than 2500 kg/cm²
550.00
x5 0 0x
5 for diameters 10 - 8 mm.
Steel strength should not be less than 1800 kg/cm²
IPE160 IPE160 IPE160 IPE160 IPE160 IPE160 IPE160 for diameters 6 mm.
Compressive strength for concrete should not be
HE340A
HE340A
HE340A
HE340A
HE340A
HE340A
HE340A
HE340A
IPE160 IPE160 IPE160 IPE160 IPE160 IPE160 IPE160 Foundation Concrete cover = 5 cm.
B
B
CA Columns & beams concrete cover = 2.5 cm.
CA E5 Slabs cover = 2.5 cm.
E5 0x CA
Outside wall cover = 4 cm. next beam span.
0x 5 E5
5 0x
5 For continuous beam steel should be bent at
span and continuo to
IPE160 IPE160 IPE160 IPE160 IPE160 IPE160 IPE160
Upper reinforcement in cantilever rib or beam should
be extend one and half its length inside next span .
Distance between steel bars should not be less than 2.5
UPN140
550.00
550.00
CA CA cm and in other cases steel bars should be in
550.00
E5 E5
0x 0x two layers.
5 5
Connection between two bars should not be less
IPE160 IPE160 IPE160 IPE160 IPE160 IPE160 IPE160
than 50 Ø.
CA CA
E5
5
0x
E5 0x
5 Owner:
Alwasead CO.
UPN200
IPE160 IPE160 IPE160
2200.00
2200.00
IPE160
IPE160 IPE160 IPE160
C
C
2200.00
2200.00
IPE160 IPE160 IPE160 IPE160 IPE160 IPE160
IPE160
CA CA
E5
E 50
x5
0x
5 Project:
IPE160 IPE160 IPE160 IPE160 IPE160 IPE160 IPE160
UPN140
CA CA
WOOD FACTORY
550.00
550.00
E5 E5
550.00
0x 0x
MANIFACTURING LINE
5 5
HE340A
CA Site: Project No:
CA
HE340A
E5 E5
0x 0x
5 5 NO.BN.FC.02
HE340A
HE340A
HE340A
HE340A
HE340A
IPE160 IPE160 IPE160 IPE160 IPE160 IPE160 IPE160 BENGHAZI
D
D
CA
HE340A
CA
E5 E5
0x 0x
Drawing name:
5 5
UPN140
UPN140
550.00
550.00
CA CA
550.00
E5 E5
0x 0x
5
IPE160 IPE160 IPE160 IPE160 IPE160 IPE160
5
IPE160 Drawing NO.:
WD-018-00-00-AR-004-00
CA CA
E CAE CAE CAE CAE E5
x5
50
50x5
CAE 50x5 50x5 50x5 50x5 0x
5
IPE160 IPE160 Revision No:
IPE160 IPE160 IPE160 IPE160 IPE160 Drawing Type:
E
E
9
9
IPE100 IPE100 IPE100 IPE100
UPN140 IPE100 IPE100 IPE100
UPN140 UPN140 UPN140 UPN140 UPN140 UPN140 UPN140 Structuralctural Drawing 00
570.00 570.00 570.00 570.00 570.00 570.00 570.00
Date: Scale:
3990.00
08/02/2021 1:100
Revision
No Date Approval
10
10
7
3
8
6
2
AL WASEAD AL AQARIYA
ALNAJMA BUILDING - AIRPORT ST. BENGHAZI/LIBYA
Mob: +218 91 640 64 64 EMAIL: Info @alwasead.com
PROJECT NO: NO.BN.FC.02
Notes :
STEEL :
Section 1-1 Design according ( EC 3 (EN 1993-1-1:2005)) Code.
Before starting execution drawings should be compared
and any different should be checked direct with
consulting engineer.
All dimensions are in milimeters.
Materials list :
Basic Steel material: S235
Steel material for pipe RHS S235JR, for plate
S235JRG2.
Welding electrodes for connections two pipe
elements. Inside wall cover =2.5 cm
36.69
600.00 600.00 consulting engineer.
36.69
UPN140 UPN140 UPN140 UPN140
102.16
Foundation was designed to carry basement, ground
and first floor.
180.00
UPN200
180.00
Bearing capacity 250KN/m3
71.84
IPE 200
UPN140
UPN140 UPN140 UPN140 IPE 200 UPN140 UPN140
Materials list :
Steel strength should not be less than 3500 kg/cm²
HE340A
for diameters 12-14 mm.
560.00
HE340A
Steel strength should not be less than 2500 kg/cm²
180.00
180.00
180.00
IPE 200 for diameters 10 - 8 mm.
Steel strength should not be less than 1800 kg/cm²
UPN140 UPN140 UPN140 UPN140 UPN140 for diameters 6 mm.
Compressive strength for concrete should not be
less than 250 kg/cm² at 28 days .
150.00
150.00
Plain concrete strength should not be less than 200
150.00
Ground kg/cm² at 28 days .
0.00 UPN140 UPN140 UPN140 UPN140 UPN140 Concrete cover to main reinforcement :
B.O.J B.O.J
Foundation Concrete cover = 5 cm.
49.24
41.24
38.24
40.00
B.O.G 40.00
B.O.G
Ground Columns & beams concrete cover = 2.5 cm.
5.00 5.00
0.00 Slabs cover = 2.5 cm.
60.00 80.00
B.O.H B.O.H
60.00 80.00
80.00
Outside wall cover = 4 cm. next beam span.
108.00
-40.00 -40.00
143.00
For continuous beam steel should be bent at
60.00
B.O.F B.O.F span and continuo to
-140.00 -140.00
Upper reinforcement in cantilever rib or beam should
be extend one and half its length inside next span .
Distance between steel bars should not be less than 2.5
310.00 320.00 150.00 400.00 150.00 400.00 150.00 320.00 310.00
cm and in other cases steel bars should be in
two layers.
550.00 550.00 550.00 550.00 Connection between two bars should not be less
than 50 Ø.
A B C D 9
Owner:
Alwasead CO.
Project:
WOOD FACTORY
Section 2-2 MANIFACTURING LINE
183.00
183.09
183.09
183.00
183.00
Drawing name:
183.00
163.00
02 Second 163.00 02 Second
01 First 01 First
620.00
600.00
620.00
600.00 Section 1-1 & 2-2
36.69
36.69
Drawing NO.:
180.00
180.00
WD-018-00-00-AR-005-00
600.00
600.00
180.00
180.00
Drawing Type: Revision No:
Structuralctural Drawing 00
B.O.G
150.00
150.00
5.00 Date: Scale:
B.O.J B.O.J
08/02/2021 1:100
43.24
43.24
40.00
Ground 3 40.00
B.O.G
Ground
3.00
3.00
S.5 5.00
0.00 B.O.H 0.00
B.O.H
80.00
80.00
80.00
110.00
140.00
-40.00 -40.00
140.00
140.00
Revision
No Date Approval
60.00
60.00
60.00
40.00
B.O.F B.O.F
-140.00 60.00 60.00 -140.00
2200.00
A B C D 9
AL WASEAD AL AQARIYA
ALNAJMA BUILDING - AIRPORT ST. BENGHAZI/LIBYA
PROJECT NO: NO.BN.FC.02 Mob: +218 91 640 64 64 EMAIL: Info @alwasead.com
Notes :
STEEL :
Design according ( EC 3 (EN 1993-1-1:2005)) Code.
Before starting execution drawings should be compared
and any different should be checked direct with
consulting engineer.
All dimensions are in milimeters.
Materials list :
Basic Steel material: S235
Steel material for pipe RHS S235JR, for plate
S235JRG2.
Welding electrodes for connections two pipe
REINFORCMENT:
Design according ( EC2 -EN 1991) Code.
Before starting execution drawings should be compared
and any different should be checked direct with
consulting engineer.
All dimensions are in meters.
Foundation was designed to carry basement, ground
01 2 3 4 5 6 7 10
8 and first floor.
Bearing capacity 250KN/m3
03 Roof Materials list :
800.00 Steel strength should not be less than 3500 kg/cm²
for diameters 12-14 mm.
Steel strength should not be less than 2500 kg/cm²
for diameters 10 - 8 mm.
HE340A
HE340A
HE340A
HE340A
HE340A
HE340A
HE340A
HE340A
Steel strength should not be less than 1800 kg/cm²
CAE50x5
IPE160
CAE50x5 CAE50x5
IPE160
CAE50x5
IPE160
CAE50x5
IPE160
CAE50x5
IPE160
CAE50x5
IPE160
CAE50x5
IPE160
CAE50x5 02 Second for diameters 6 mm.
180.00 46.76
180.00 46.76
UPN140 UPN140 UPN140 UPN140 UPN140 UPN140 UPN140
UPN140
IPE100 IPE100 IPE100 IPE100 IPE100 IPE100 IPE100 620.00 Compressive strength for concrete should not be
UPN140 UPN140 UPN140 UPN140 UPN140 UPN140 UPN140 UPN140 UPN140
less than 250 kg/cm² at 28 days .
01 First Plain concrete strength should not be less than 200
L51X
CAE50x5
51X
3.2
L51X
51X
3.2
600.00 kg/cm² at 28 days .
Concrete cover to main reinforcement :
3.2 51X
3.2 Foundation Concrete cover = 5 cm.
51X L51X
L51X Columns & beams concrete cover = 2.5 cm.
UPN140 UPN140 UPN140 UPN140 UPN140 UPN140 UPN140 UPN140 UPN140
Slabs cover = 2.5 cm.
Outside wall cover = 4 cm. next beam span.
600.00
600.00
180.00
180.00
L5
For continuous beam steel should be bent at
1X
51
X3
.2
span and continuo to
Upper reinforcement in cantilever rib or beam should
UPN140 UPN140 UPN140 UPN140 UPN140 UPN140 UPN140 UPN140 be extend one and half its length inside next span .
UPN140
Distance between steel bars should not be less than 2.5
L5 cm and in other cases steel bars should be in
46.24150.00
43.24150.00
1X
51
X3 3.2
.2 X5
1X B.O.G two layers.
3.2 1
5 1X L5
L5
1X 5.00 Connection between two bars should not be less
UPN140 UPN140 UPN140 UPN140 UPN140 UPN140 UPN140 UPN140 UPN140 than 50 Ø.
B.O.J B.O.J
3.00
20.00
40.00 40.00
Ground
Owner:
60.0080.00
60.0080.00
60.97
0.00
140.00
140.00
140.97
3
B.O.H
S.9
Alwasead CO.
60.00
-40.00
2.50 3.20 2.50 3.20 2.50 3.20 2.50 3.20 2.50 3.20 2.50 3.20 2.50 3.20 2.50
5.70 5.70 5.70 5.70 5.70 5.70 5.70 B.O.F
-140.00 Project:
1 2 3 4 5 6 7 10
WOOD FACTORY
MANIFACTURING LINE
NO.BN.FC.02
BENGHAZI
Drawing name:
Section 3-3
Drawing NO.:
WD-018-00-00-AR-006-00
Drawing Type: Revision No:
Structuralctural Drawing 00
Date: Scale:
08/02/2021 1:100
Revision
No Date Approval
AL WASEAD AL AQARIYA
ALNAJMA BUILDING - AIRPORT ST. BENGHAZI/LIBYA
PROJECT NO: NO.BN.FC.02 Mob: +218 91 640 64 64 EMAIL: Info @alwasead.com
Notes :
STEEL :
Design according ( EC 3 (EN 1993-1-1:2005)) Code.
Before starting execution drawings should be compared
and any different should be checked direct with
consulting engineer.
All dimensions are in milimeters.
10
1
7
0
8
6
2
4
Materials list :
Basic Steel material: S235
Steel material for pipe RHS S235JR, for plate
S235JRG2.
Welding electrodes for connections two pipe
elements. Inside wall cover =2.5 cm
310.00
80.00
Before starting execution drawings should be compared
A
A
and any different should be checked direct with
F02
F02
F02
F02
F02
F02
F02
consulting engineer.
All dimensions are in meters.
F02
Foundation was designed to carry basement, ground
and first floor.
Bearing capacity 250KN/m3
Materials list :
F03
F03
550.00
550.00
477.50
Steel strength should not be less than 3500 kg/cm²
for diameters 12-14 mm.
320.00
320.00
Steel strength should not be less than 2500 kg/cm²
for diameters 10 - 8 mm.
Steel strength should not be less than 1800 kg/cm²
for diameters 6 mm.
65.00 Compressive strength for concrete should not be
less than 250 kg/cm² at 28 days .
Plain concrete strength should not be less than 200
150.00
150.00
kg/cm² at 28 days .
65.00
B
B
Concrete cover to main reinforcement :
Foundation Concrete cover = 5 cm.
F01
Columns & beams concrete cover = 2.5 cm.
Slabs cover = 2.5 cm.
Outside wall cover = 4 cm. next beam span.
190.00
For continuous beam steel should be bent at
span and continuo to
F03
F03
Upper reinforcement in cantilever rib or beam should
400.00
485.00
400.00
550.00
550.00
be extend one and half its length inside next span .
Distance between steel bars should not be less than 2.5
cm and in other cases steel bars should be in
two layers.
190.00 Connection between two bars should not be less
than 50 Ø.
Owner:
2200.00
150.00
150.00
65.00
C
C
Alwasead CO.
F01
Project:
F03
F03
400.00
485.00
400.00
550.00
550.00
WOOD FACTORY
MANIFACTURING LINE
150.00
65.00
D
D
NO.BN.FC.02
BENGHAZI
F01
Drawing name:
F03
F03
320.00
320.00
477.50
POSITION
550.00
550.00
F02
Drawing NO.:
F02
F02
F02
F02
F02
F02
F02
WD-018-00-00-AR-007-00
310.00
310.00
80.00
E
E
9
9
Drawing Type: Revision No:
Structuralctural Drawing 00
F03
80.00 490.00 80.00 490.00 80.00 490.00 80.00 490.00 80.00 490.00 80.00 490.00 80.00 490.00 80.00 Date: Scale:
250.00 320.00 250.00 320.00 250.00 320.00 250.00 320.00 250.00 320.00 250.00 320.00 250.00 320.00 250.00 08/02/2021 1:100
570.00 570.00 570.00 570.00 570.00 570.00 570.00
10
Revision
No Date Approval
1
7
0
8
2
AL WASEAD AL AQARIYA
ALNAJMA BUILDING - AIRPORT ST. BENGHAZI/LIBYA
PROJECT NO: NO.BN.FC.02 Mob: +218 91 640 64 64 EMAIL: Info @alwasead.com
Notes :
STEEL :
Design according ( EC 3 (EN 1993-1-1:2005)) Code.
Before starting execution drawings should be compared
and any different should be checked direct with
consulting engineer.
F03 All dimensions are in milimeters.
Materials list :
Basic Steel material: S235
A B C D E Steel material for pipe RHS S235JR, for plate
S235JRG2.
Welding electrodes for connections two pipe
elements. Inside wall cover =2.5 cm
REINFORCMENT:
2 2
Design according ( EC2 -EN 1991) Code.
Before starting execution drawings should be compared
and any different should be checked direct with
consulting engineer.
All dimensions are in meters.
F03 Ø10 @250 mm
4 -Ø12 - 16
F03 4 -Ø12 - 16
4 -Ø12 - 16
Ø10 @250 mm
F03 Foundation was designed to carry basement, ground
and first floor.
Bearing capacity 250KN/m3
4 -Ø12 - 16
SOLID SLAB Materials list :
Steel strength should not be less than 3500 kg/cm²
15+5 for diameters 12-14 mm.
Steel strength should not be less than 2500 kg/cm²
Ø8 @250 mm for diameters 10 - 8 mm.
Ø14 @150 mm Ø14 @150 mm
2 -Ø12 Steel strength should not be less than 1800 kg/cm²
for diameters 6 mm.
Ø12 @150 mm Ø12 @150 mm Ø12 @150 mm Compressive strength for concrete should not be
Ø14 @150 mm Ø14 @150 mm
less than 250 kg/cm² at 28 days .
Ø12 @150 mm Ø12 @150 mm Ø12 @150 mm
Plain concrete strength should not be less than 200
kg/cm² at 28 days .
2.50
2.50
2 -Ø12
1 1 Concrete cover to main reinforcement :
1.60
1.60
1.60
Foundation Concrete cover = 5 cm.
Columns & beams concrete cover = 2.5 cm.
4 -Ø12
Owner:
Alwasead CO.
F03 Project:
A B C D E WOOD FACTORY
MANIFACTURING LINE
NO.BN.FC.02
BENGHAZI
Drawing name:
SOLID SLAB
F02
15+5
40.0
0.00 0.00
Ø8 @300 mm Ø8 @300 mm
4Ø12
5 xØ8 Drawing NO.:
0.8
320.0
Ø12 @150 mm 10xØ12 Ø12 @150 mm WD-018-00-00-AR-008-00
1.2
21 xØ14 21 xØ14
20x0.15
10xØ12 9x0.15
9x0.15
Ø12 @150 mm 20x0.15
F01
T.O.F
T.O.F Revision No:
0.6
Drawing Type:
0.6
-0.20
-0.20 00
9x0.15
Revision
No Date Approval
AL WASEAD AL AQARIYA
ALNAJMA BUILDING - AIRPORT ST. BENGHAZI/LIBYA
PROJECT NO: NO.BN.FC.02 Mob: +218 91 640 64 64 EMAIL: Info @alwasead.com
WOOD FAKTORY
AL WASEAD AL AQARIYA
ALNAJMA BUILDING - AIRPORT ST. BENGHAZI/LIBYA
Mob: +218 91 640 64 64 EMAIL: Info @alwasead.com
Project No: NO.BN.FC02
Index
Drawing Name Drawing No. Revision No.
01 Layout 00 00
02 Index 00 00
03 Master Plan 01 00
04 Foundation 02 00
05 Ground Floor -Dimensions 03 00
06 Roof structure -Dimensions 04 00
07 Cross section 1-1 & 2-2 05 00
08 Section 3-3 06 00
09 POSITION Foundation 07 00
10 Rebar Plan 08 00
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30