You are on page 1of 1

TPM PRODUCTION CHECKLIST

TPM No : TIS No : Doc. No : Form 05.85-01(0/A)

Station Name REPAIR EQUIPMENT TWO POST LIFTER Month


Station Number Equipment Number Year
Team Member Team Leader O Circle for OK X Cross for problem ⊗ Circle the cross mark after repaired

Check Method
No Item Check Standard Control 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Visual Touch Operate

1 Safety Push botton & Emergency switch berfungsi dengan baik ✔ ✔ ✔


2 Hydrualic system Check kebocoran oli di tangki dan selang ✔ ✔ ✔
3 Ruber Tidak pecah dan tidak habis ✔ ✔
4 Gear lock Berfungsi dengan baik dan kondisi baik ✔ ✔ ✔
5 Cleaning Area Lakukan pembersihan pada area sekitar mesin ✔ ✔
6

10

ETM Team Member


ETM Team Leader
Remarks :

1 2 3 4 5

You might also like