Professional Documents
Culture Documents
Shore Pile Pressure Calculation: 1.7m 12m 13.5m 20 kN/m2
Shore Pile Pressure Calculation: 1.7m 12m 13.5m 20 kN/m2
gh gh g'h
LAYER (cum)
of the Layer at Top of the Layer of the Layer
APPARENT PRESSURE
SUBGRADE Cu
LAYER BOT. LVL SPT VALUE N MODULUS ηh
2.20 7 47.00
3.20 0
4.70 1
8.20 4 7.00
9.70 22
10.70 32
11.70 100
14.20 100
14.90 100
gh at
g'h Water Table LVL gh or g'h gh or g'h
(cum) (cum)
at Top of the Layer (b/w or Bot of the for the Layer at Top of the Layer
Layer)
0 27.2 30.2 0
13.2 2 30.2
15.2 5.25 32.2
20.45 12.25 37.45
32.7 12.75 49.7
45.45 9.5 62.45
54.95 11 71.95
65.95 27.5 82.95
93.45 -7 110.45
86.45 103.45
Total Surchage Total Water Pressure
Pressure a' Water Pressure of at Top of Layer/at
(m) the Layer
at Dredge Line Water Table LVL
5 0
10 5
15 15
35 30
15 65
10 80
10 90
16.3875 0.29 3.00000000000001 100
BULK/
f DRY DENSITY g ' Ka
SAT. DENSITY g
19.61 16 6 0.50
19.61 12 2 0.50
20.22 13.5 3.5 0.49
20.22 13.5 3.5 0.49
33.60 18.5 8.5 0.29
36.55 19.5 9.5 0.25
42.50 21 11 0.19
42.50 21 11 0.19
-10 1.00
27.2 15.10
1.00
2.57
6.00
3.70
2.38
2.09
3.30000000000001 86.25 5.23
-7.00
Total Water Pressure
at Bot of Layer/ Surcharge Soil Load
Pressure of the Layer
Dredge line
5 10 18.74
15 10 15.60
30 9.8 25.60
65 9.8 74.73
80 5.8 24.39
90 5 16.80
100 3.8 14.72
103 3.8 4.82
27.21 kN/m2
Kp
2.00
2.00
2.04
2.04 g
3.45
4.00
5.26
5.26
1.00
Soil Surcharge
for the Layer
0.00
15.10
15.78
18.35
14.41
15.61
13.67
15.76
110.45