1.0 PURPOSE
To check the instrument Performance or internal calibration using CRM periodically.
2.0 SCOPE
Testing equipment’s checked using CRM
3.0 RESPONSIBILITY
Technical Manager/Laboratory Supervisor
4.0 PROCEDURE:
1) Check plan of instruments using CRM
2) Equipment performance records using CRM as per scheduled plan
5.0 FREQUENCY: Schedule for each and every instrument is maintained as per plan