1.0 PURPOSE
2.0 SCOPE
All laboratory technical personnel as well as those working in related areas.
3.0 RESPONSIBILITY
a) Quality Manager & Technical Manager is responsible to identify the training need for
the laboratory personnel
b) Quality Manager is responsible for maintaining the Personnel and Training Records.
Issue No. 01 Issue Date: 01.04.2021 Prepared By: Copy No. Page 1 of 7
QM
Rev. No.: 00 Rev. Date: Nil Approved By:
Issued By:
TM QM
KEJRIWAL CASTINGS LIMITED
(TESTING LAB,DGP)
Document No.: MANAGEMENT SYSTEM PROCEDURE FOR Section No.:
KCL/LAB/DGP/MSP/02 PERSONAL AND TRAINING RECORDS QMS 6.2
A) PERSONNEL COMPETENCE:
The laboratory has made adequate provision for suitable manpower with requisite qualification
and experience for executing various jobs like operation of test equipment/machine/instrument
to perform tests, to evaluate results and sign test reports in their respective areas and to ensure
that technical expertise is constantly updated. This is ensured through in-house/external training
program. The laboratory has specified qualification and/or experience appropriate to the job
requirement and maintains up-to date record of the employees’ qualification and training.
In case of specified assignment/jobs, the laboratory has a policy to define qualification and/or
experience for the relevant job and the Chief Executive of the Laboratory ensures that only staff
members, who have acquired adequate knowledge and competency to perform the tests, are
allowed to handle the work independently. Laboratory maintains the relevant authorization.
B) Selection of personnel:
a) HR Department is responsible for recruitment of all Officers in the organization. The
Responsibility of sourcing candidates generally lies with Corporate HR.
b) First Recruitment need is identified whether extra manpower is required or not based on recent
volume of job.
c) Then Search for Competent Candidates begins; CEO or authorized by CEO any lab person first
try to search within organization for availability of competent company employees for required
position.
d) If unable to get employee within the organization, CEO or authorized lab person will inform
corporate HR about the manpower crisis & detailed reason for that
e) It is the policy of the Company to recruit appropriate candidates matching the required
Specifications that will facilitate the fulfillment of role / responsibility. The Company,
However, shall remain competitive and maintain a lean organization structure by recruiting
In a planned manner.
Issue No. 01 Issue Date: 01.04.2021 Prepared By: Copy No. Page 2 of 7
QM
Rev. No.: 00 Rev. Date: Nil Approved By:
Issued By:
TM QM
KEJRIWAL CASTINGS LIMITED
(TESTING LAB,DGP)
Document No.: MANAGEMENT SYSTEM PROCEDURE FOR Section No.:
KCL/LAB/DGP/MSP/02 PERSONAL AND TRAINING RECORDS QMS 6.2
f) All manpower sanction will be against approved requisitions. The requisition approval
will be maintained at the corporate level.
g) HR Department will source suitable candidates for the vacancies through Newspaper
Advertisement, Job Portals, Manpower consultants, Forced Applications and Word of
Mouth. Corporate HR is the only department which is permitted to directly interact with
Recruitment consultants. HR Department will source profiles as per the skills and qualification
requirement for the role.
h) To ensure robustness of the selection process, more than four candidates are to be
Interviewed before filling up a vacancy. All candidates being interviewed will go through
minimum two-levels of interviews before the Candidate is selected.
i) Appointment letter is issued for the selected Candidate.
j) Persons appointed in the organization are given introduction training in the particular field for
which he is appointed.
k) The persons are selected for an assigned task on the basis of their qualification and experience.
C) Training of personnel:
The training requirements are initially identified by the Lab manager of the Laboratory in Form No.
[KCL/LAB/DGP/FM/25] and on the basis of the requirement, a training plan in Form No.
[KCL/LAB/DGP/FM/26] is prepared by the QM with the approval of CEO of the Laboratory. Training
need is identified on the basis of following factors.
Past performance on Test.
Findings from the internal audit and external audit by NABL or Customer or inspection
body.
Findings from the Test or system non-conformity.
After identifying the training need, training is given accordingly. Laboratory Management
organizes training in the following manner.
Issue No. 01 Issue Date: 01.04.2021 Prepared By: Copy No. Page 3 of 7
QM
Rev. No.: 00 Rev. Date: Nil Approved By:
Issued By:
TM QM
KEJRIWAL CASTINGS LIMITED
(TESTING LAB,DGP)
Document No.: MANAGEMENT SYSTEM PROCEDURE FOR Section No.:
KCL/LAB/DGP/MSP/02 PERSONAL AND TRAINING RECORDS QMS 6.2
Issue No. 01 Issue Date: 01.04.2021 Prepared By: Copy No. Page 4 of 7
QM
Rev. No.: 00 Rev. Date: Nil Approved By:
Issued By:
TM QM
KEJRIWAL CASTINGS LIMITED
(TESTING LAB,DGP)
Document No.: MANAGEMENT SYSTEM PROCEDURE FOR Section No.:
KCL/LAB/DGP/MSP/02 PERSONAL AND TRAINING RECORDS QMS 6.2
D) Supervision of personnel:
The persons are selected for an assigned task on the basis of their qualification and
experience. All the laboratory Technical persons are employed and where contracted
personnel are appointed as support to a technical person, they are also given training in
accordance to management system and have appropriate supervision
Person appointed in the organization is given introduction training in the particular field
for which he is appointed.
Issue No. 01 Issue Date: 01.04.2021 Prepared By: Copy No. Page 5 of 7
QM
Rev. No.: 00 Rev. Date: Nil Approved By:
Issued By:
TM QM
KEJRIWAL CASTINGS LIMITED
(TESTING LAB,DGP)
Document No.: MANAGEMENT SYSTEM PROCEDURE FOR Section No.:
KCL/LAB/DGP/MSP/02 PERSONAL AND TRAINING RECORDS QMS 6.2
Issue No. 01 Issue Date: 01.04.2021 Prepared By: Copy No. Page 6 of 7
QM
Rev. No.: 00 Rev. Date: Nil Approved By:
Issued By:
TM QM
KEJRIWAL CASTINGS LIMITED
(TESTING LAB,DGP)
Document No.: MANAGEMENT SYSTEM PROCEDURE FOR Section No.:
KCL/LAB/DGP/MSP/02 PERSONAL AND TRAINING RECORDS QMS 6.2
Authorized personnel of the laboratory look after the development, modification, verification and
validation of the test method as per applicable. Those fellow personnel are responsible for analyzing,
reviewing and authorizing the report and result.
5. ASSOCIATED DOCUMENTS:
Bio-data & training summary - KCL/LAB/DGP/FM/21
List of authorization - KCL/LAB/DGP/FM/22
List of authorization for handling of Equipment and test - KCL/LAB/DGP/FM/22A
Minimum requirement of Laboratory personnel - KCL/LAB/DGP/FM/23
Job description - KCL/LAB/DGP/FM /24
Training Needs - KCL/LAB/DGP/FM /25
Training Plan - KCL/LAB/DGP/FM/26
Training Records - KCL/LAB/DGP/FM/27
Training Effectiveness Evaluation - KCL/LAB/DGP/FM/28
Personnel competency evaluation record - KCL/LAB/DGP/FM /29
Issue No. 01 Issue Date: 01.04.2021 Prepared By: Copy No. Page 7 of 7