Professional Documents
Culture Documents
Control Cable - Stage-1
Control Cable - Stage-1
Annexure
1.1KV PVC ARMOURED COPPER CABLE
TERMINATION DETAILS
From TO
NO. OF CABLE
Sl. NO Equipment FROM TO TB NO FERRULE NO FERRULE NO TB NO SIZE OF CABLE PURPOSE ROUTE Dia Length
RUN USED
7 ISO (Motor Control CRP 1 12CX2.5 mm² 1 CONTROL/ALARM/INDICATIONS Conduit, SS07, SS06, SS05, SS02, 22 100
Panel) Conduit, SS01, SR4, SR5, SR6
ISO-2
9 ISO (Motor Control CRP 4CX2.5 mm² 1 Remote Operation Conduit, SS07, SS06, SS05, SS02, 16 100
Panel) Conduit, SS01, SR4, SR5, SR6
17 CT-JB CRP 1 4CX2.5 mm² 1 (CT1 CORE-1) PROTECTION Conduit, SS07, SS06, SS05, SS02, 16 100
Conduit, SS01, SR4, SR5, SR6
18 CT-JB CRP 1 4CX2.5 mm² 1 (CT1 CORE-2) METERING 16 100
Annexure-3
Cable Schedule for Control Cables
TERMINATION DETAILS
From TO
NO. OF CABLE
Sl. NO Equipment FROM TO TB NO FERRULE NO FERRULE NO TB NO SIZE OF CABLE RUN USED PURPOSE ROUTE Dia Length
19 CB-52 (Line) CRP 1 10CX2.5 mm² 1 CONTROL/ALARM/INDICATIONS Conduit, SS08, SS07, SS06, SS05, 22 120
20 CB-1 CB-52 (Line) CRP 1 19CX2.5 mm² 1 TC-1 SS02, Conduit, SS01, SR4, SR5, 26 120
21 CB-52 (Line) CRP 1 19CX2.5 mm² 1 TC-2 SR6 26 120
1 1a
(BPT CORE-1) Protection
2 1n
22 PT BPT-JB (R-PH) 4CX2.5 mm² 1 16 10
3 2a
(BPT CORE-2) METERING
4 2n
1 1a
(BPT CORE-1) Protection
2 1n
23 PT BPT-JB (Y-PH) 4CX2.5 mm² 1 16 10
3 2a
Line PT (BPT CORE-2) METERING
4 2n
1 1a
(BPT CORE-1) Protection
1n
24 PT BPT-JB (B-PH) 4CX2.5 mm² 1 16 10
1 2a
(BPT CORE-2) METERING
2n
25 PT-JB CRP 1 4CX2.5 mm² 1 (BPT CORE-1) METERING Conduit, SS08, SS07, SS06, SS05, 16 115
SS02, Conduit, SS01, SR4, SR5,
26 PT-JB CRP 1 4CX2.5 mm² 1 (BPT CORE-2) Protection SR6 16 115
1 1a
(BPT CORE-1) Protection
2 1n
27 PT BPT-JB (R-PH) 4CX2.5 mm² 1 16 10
3 2a
(BPT CORE-2) METERING
4 2n
1 1a
(BPT CORE-1) Protection
2 1n
28 PT BPT-JB (Y-PH) 4CX2.5 mm² 1 16 10
3 2a
Bus PT (BPT CORE-2) METERING
4 2n
1 1a
(BPT CORE-1) Protection
1n
29 PT BPT-JB (B-PH) 4CX2.5 mm² 1 16 10
1 2a
(BPT CORE-2) METERING
2n
30 PT-JB CRP 1 4CX2.5 mm² 1 (BPT CORE-1) METERING Conduit, SS08, SS07, SS06, SS05, 16 115
SS02, Conduit, SS01, SR4, SR5,
31 PT-JB CRP 1 4CX2.5 mm² 1 (BPT CORE-2) Protection SR6 16 115
Conduit, SS08, SS07, SS06, SS05,
32 ISO (Motor Operating CRP 1 19CX2.5 mm² 2 CONTROL/ALARM/INDICATIONS SS02, Conduit, SS01, SR4, SR5, 26 116
Mechanism) SR6
TERMINATION DETAILS
From TO
NO. OF CABLE
Sl. NO Equipment FROM TO TB NO FERRULE NO FERRULE NO TB NO SIZE OF CABLE RUN USED PURPOSE ROUTE Dia Length
TERMINATION DETAILS
From TO
NO. OF CABLE
Sl. NO Equipment FROM TO TB NO FERRULE NO FERRULE NO TB NO SIZE OF CABLE RUN USED PURPOSE ROUTE Dia Length
1 1S1
(CT CORE-1) METERING
2 1S2
55 4CX2.5 mm² 1 16 10
3 2S1
CT (200/1-1-1A) CT-JB (R-PH) (CT CORE-2) PROTECTION
4 2S2
5 3S1
56 4CX2.5 mm² 1 (CT CORE-3) 87 16 10
6 3S2
1 1S1
(CT CORE-1) METERING
2 1S2
57 4CX2.5 mm² 1 16 10
3 2S1
CT (200/1-1-1A) CT-JB (Y-PH) (CT CORE-2) PROTECTION
4 2S2
CT-3 5 3S1
58 4CX2.5 mm² 1 (CT CORE-3) 87 16 10
6 3S2
1 1S1
(CT CORE-1) METERING
2 1S2
59 4CX2.5 mm² 1 16 10
3 2S1
CT (200/1-1-1A) CT-JB (B-PH) (CT CORE-2) PROTECTION
4 2S2
5 3S1
60 4CX2.5 mm² 1 (CT CORE-3) 87 16 10
6 3S2
61 CT-JB CRP 4CX2.5 mm² 1 (CT CORE-1) METERING 16 100
62 CT-JB CRP 4CX2.5 mm² 1 (CT CORE-2) PROTECTION Conduit, SS07, SS06, SS05, SS02, 16 100
Conduit, SS01, SR4, SR5, SR6
63 CT-JB CRP 4CX2.5 mm² 1 (CT CORE-3) 87 16 100
1
2
3
4
5
6
7
64 8 19CX2.5 mm² 1 26 72
9
10
OLTC Terminal (18MVA 11 SS04, SS02, Conduit, SS01, SR4,
Trafo.-1 RTCC-1
Trafo.-1) 12 SR5, SR6
13
14
15
16
17
18
65 19 10CX2.5 mm² 1 22 72
20
21
22
Annexure-3
Cable Schedule for Control Cables
TERMINATION DETAILS
From TO
NO. OF CABLE
Sl. NO Equipment FROM TO TB NO FERRULE NO FERRULE NO TB NO SIZE OF CABLE RUN USED PURPOSE ROUTE Dia Length
1
2
3
4
5
6
7
66 8 19CX2.5 mm² 1 26 62
9
10
OLTC Terminal (18MVA 11 SS03, SS02, Conduit, SS01, SR4,
Trafo.-2 RTCC-2
Trafo.-2) 12 SR5, SR6
13
14
15
16
17
18
67 19 10CX2.5 mm² 1 22 62
20
21
22
1
WTI (Alarm)
2
3
WTI (Trip)
4
68 10CX2.5 mm² 1 22 70
7
OTI (Alarm)
8
9
OTI (Trip)
10
11
BR (Alarm)
12
Marshaling Box (18MVA 13 SS04, SS02, Conduit, SS01, SR4,
Trafo.-1 CRP BR (Trip)
Trafo.-1) 14 SR5, SR6
15
69 12CX2.5 mm² 1 MOG (Alarm) 22 70
16
17
PRV (Trip)
18
19
OSR (Trip)
20
21
NCT
22
70 4CX2.5 mm² 1 16 70
23
NCT
24
Annexure-3
Cable Schedule for Control Cables
TERMINATION DETAILS
From TO
NO. OF CABLE
Sl. NO Equipment FROM TO TB NO FERRULE NO FERRULE NO TB NO SIZE OF CABLE RUN USED PURPOSE ROUTE Dia Length
1
WTI (Alarm)
2
3
WTI (Trip)
4
71 10CX2.5 mm² 1 22 60
7
OTI (Alarm)
8
9
OTI (Trip)
10
11
BR (Alarm)
12
Marshaling Box (18MVA 13 SS03, SS02, Conduit, SS01, SR4,
Trafo.-2 CRP BR (Trip)
Trafo.-2) 14 SR5, SR6
15
72 12CX2.5 mm² 1 MOG (Alarm) 22 60
16
17
PRV (Trip)
18
19
OSR (Trip)
20
21
NCT
22
73 4CX2.5 mm² 1 16 60
23
NCT
24
1
WTI (Alarm)
2
3
WTI (Trip)
4
74 10CX2.5 mm² 1 22 58
7
OTI (Alarm)
8
Marshaling Box (500 11kV HT 9 SS14, SS13, SS02, Conduit, SS01,
500 kVA Trafo. kVA Trafo.-1) Switchgear OTI (Trip) SR3
10
11
BR (Alarm)
12
13
75 10CX2.5 mm² 1 BR (Trip) 22 58
14
15
MOG (Alarm)
16
Annexure-3
Cable Schedule for Control Cables
TERMINATION DETAILS
From TO
NO. OF CABLE
Sl. NO Equipment FROM TO TB NO FERRULE NO FERRULE NO TB NO SIZE OF CABLE RUN USED PURPOSE ROUTE Dia Length
1
WTI (Alarm)
2
3
WTI (Trip)
4
76 10CX2.5 mm² 1 22 52
7
OTI (Alarm)
8
Marshaling Box (500 11kV HT 9
500 kVA Trafo. OTI (Trip) SS13, SS02, Conduit, SS01, SR3
kVA Trafo.-2) Switchgear 10
11
BR (Alarm)
12
13
77 10CX2.5 mm² 1 BR (Trip) 22 52
14
15
MOG (Alarm)
16
3
Feedback
4
11kV HT 5
78 VFD-1 10CX2.5 mm² 1 Start PermiSS0ive SR2, SR3 22 40
Switchgear 6
7
Shunt Trip Ckt.
8
3
Feedback
4
11kV HT 5
79 VFD-2 Switchgear 10CX2.5 mm² 1 Start PermiSS0ive SR1, SR2, SR3 22 45
6
7
Shunt Trip Ckt.
8
3
Feedback
4
11kV HT 5
80 VFD-3 Switchgear 10CX2.5 mm² 1 Start PermiSS0ive SR10, SR4, SR3 22 40
6
7
Shunt Trip Ckt.
8
3
Feedback
4
11kV HT 5
81 VFD-4 10CX2.5 mm² 1 Start PermiSS0ive SR10, SR4, SR3 22 50
Switchgear 6
7
Shunt Trip Ckt.
8
3
Feedback
4
11kV HT 5
82 VFD-5 10CX2.5 mm² 1 Start PermiSS0ive SR10, SR4, SR3 22 56
Switchgear 6
7
Shunt Trip Ckt.
8
3
Start PermiSS0ive
4
150kVAr Capacitor 11kV HT 5
83 Bank-1 Switchgear 10CX2.5 mm² 1 Shunt Trip Ckt. SR5, SR4, SR3 22 40
6
7
Feedback
8
Annexure-3
Cable Schedule for Control Cables
TERMINATION DETAILS
From TO
NO. OF CABLE
Sl. NO Equipment FROM TO TB NO FERRULE NO FERRULE NO TB NO SIZE OF CABLE RUN USED PURPOSE ROUTE Dia Length
3
Start PermiSS0ive
4
150kVAr Capacitor 11kV HT 5
84 Bank-2 Switchgear 10CX2.5 mm² 1 Shunt Trip Ckt. SR5, SR4, SR3 22 40
6
7
Feedback
8
3 XCT-33
O/C & E/F PROT. RELAY
4 XCT-34
11kV HT Switchgear 1 XCT-25
85 CRP Panel 10CX2.5 mm² 1 TAFO. DIFFERENTIAL RELAY SR3, SR4, SR5, SR6 22 50
(Trafo-1 Feeder) 2 XCT-26
3 XCT-27
Feedback
4 XCT-28
3 XCT-33
O/C & E/F PROT. RELAY
4 XCT-34
11kV HT Switchgear 1 XCT-25
86 CRP Panel 10CX2.5 mm² 1 TAFO. DIFFERENTIAL RELAY SR3, SR4, SR5, SR6 22 50
(Trafo-2 Feeder) 2 XCT-26
3 XCT-27
Feedback
4 XCT-28
1
NO
11kV HT 2 PH01, OD04, OD03, OD02,
87 LPBS-1 4CX2.5 mm² 1 16 106
Switchgear 3 OD01, SR1A, SR1, SR2, SR3
NC
4
1
NO
11kV HT 2 PH02, PH01, OD04, OD03, OD02,
88 LPBS-2 4CX2.5 mm² 1 16 111
Switchgear 3 OD01, SR1A, SR1, SR2, SR3
NC
4
1
NO PH03, PH02, PH01, OD04, OD03,
11kV HT 2
89 LPBS-3 4CX2.5 mm² 1 OD02, OD01, SR1A, SR1, SR2, 16 116
Switchgear 3 SR3
NC
4
1
NO PH04, PH03, PH02, PH01, OD04,
11kV HT 2
90 LPBS-4 4CX2.5 mm² 1 OD03, OD02, OD01, SR1A, SR1, 16 121
Switchgear 3 SR2, SR3
NC
4
1
NO PH05, PH04, PH03, PH02, PH01,
11kV HT 2
91 LPBS-5 Switchgear 4CX2.5 mm² 1 OD04, OD03, OD02, OD01, SR1A, 16 126
3 SR1, SR2, SR3
NC
4
5 CRP- Wall
4 FFL FGL
4 Riser to panel
25 Outside Wall - Bend
4 Riser to JB
42
Equipment Structure Total
Weight Weight Weight
Net Weight of the Isolator without E.S.
Metalics 345 500 845
Net Weight of the Isolator with one E.S.
Metalics 405 500 905