Table 1. Quantitative numerical and Descriptive summary of site selection criteria

SITE A (Barangay Talisayan, Sito San SITE B(Barangay Sangali) SITE C (Barangay Ayala )
CRITERIA Ramon)
Rank Remarks Ran Remarks Ran Remarks
k k
1. Land Configuration
The site is excellent for classified The site is classified under medium The site is classified under heavy
a) Conformit under heavy industrial zone and industrial town and suitable for the industrial zone and suitable for the
y to land 5 suitable for the development 5 development 5 development of the proposed port in
use the area

b) Land area 4 4 Has a total land area of (..) hectares 4 Has a total land area of (..) hectares
Covers more than 9.2 hectares
c) Land
flexibility 3 Good potential in construction of 3 Good potential in construction of 3 Good potential in construction of
seaport due to soil composition seaport due to soil composition seaport due to soil composition

d) Land
Ownershi 5 The site is owned by Zamboanga 3 The site is owned by private 3 The site is owned by private
p Ecozone and freeport
Very good for future expansion Good for future expansion but not as
e) Expansion 4 The site is excellent for future 4 because the site is bigger. 4 very good because the site is owned
Developm expansion because there is no by private
ent existing establishment found in the
area.
It has Fairly impact on the adjacent
It has Fairly impact on the adjacent It has very good impact on the infrastructure because the site is
f) Adjacent infrastructure because of the 4 adjacent infrastructure because the 3 fronting the National High school
Land use 2 unrelated function of the development is related on the other and other unrelated functions in the
establishment in the site. establishment in the site area but mostly exhibit industrial
uses.
Page 1|6
2. Socio-Economic factors
The site rated very well because of
a) Related Western Mindanao state San Ramon Has for residential area and vacant establishment related function in the
area 3 campus is adjacent to the site and 4 lot adjacent to the site and may not 4 area and also may not affect the
developm may not affect the other existing affect the other existing facilities other existing facilities due like
ent facilities due to unrelated functions. due to unrelated functions. residential and recreational.

The peace and order is very good Peace and order is very good
because police and barangay tanods Peace and order is very good because police and barangay tanods
b) Peace and patrol 24/7 for any trouble. Military because there are police and patrol 24/7 in the site. National
order 4 outputs also designated within the 4 barangay tanods patrol 24/7 in the 4 police Authority is adjacent to site
area for strict surveillance. site.
It has the total population of 20,766 It has the total population of 22,547
3 It has the total population of 8,220 as 5 as of year 2015 that can be a source 5 as of year 2015 that can be a source
c) Populatio of year 2015 that can be a source for for employment in the for employment in the development.
n employment in the development. development.

3. Physical
a) Geographical Site Selection
Very good soil characteristics and Very good soil characteristics and Very good soil characteristics and
a.1) Soil 4 condition because the soil is capable for 4 condition because the soil is capable 4 condition because the soil is capable
Characteristics any construction in the area. for any construction in the area. for any construction in the area.
and condition
a.2) Size and The irregularity of the site is very good The irregularity of the site is very
shape 4 and it’s not a hindrance for the 4 The irregularity of the site is very 4 good
development good
a.3) Topography Has a warm low lands, 5% slope and Relatively flat to moderate terrain Relatively flat and sloping towards the
4 100 meters elevation and moderate to 4 which makes it very good for the 4 sea, gentle to rugged terrain.
erosion makes it very good for the proposal
proposal
b) Accessibility
The site is along the road of national The site is along the road of The site is along the road of national
connected to highway and accessible national connected to highway and connected to highway and accessible
a.1) Mode of 4 by any automobiles, gives a multi-way 4 accessible by any automobiles, 4 by any automobiles, gives a multi-way
Page 2|6
transportation means to arrive at the project location gives a multi-way means to arrive means to arrive at the project location
and makes it very good at the project location and makes it and makes it very good
very good
26 kilometers away from the city 25.34 kilometers away from the 16.50 kilometers away from the city
a.2) Distance proper because the project requires to city proper because to avoid proper. Same situation in the main
from city Proper 4 be away so to avoid congestion in the 4 congestion in the main port due to 3 port because it surrounded by more
main port due to heavy cargo that heavy cargo that enters in the main establishment causes congestion.
enters in the main city. city.

The site possesses of excellent major The site has very good road The site has good road condition and
a.3)Road 5 road by Zamboanga Special economic 5 condition and capable for any 3 capable for any heavy traffic
Condition Zone and adjacent to National Highway heavy traffic condition because it condition but congestion is still
adjacent to the Major Road. present due to adjacent
establishment operate in the area
4. Environmental
a) Meteorological factors
The Selected site can adapt to any The site can adapt to any season The site is present of any trees that
a.1) Climate 4 season because of the present trees in 4 because of the present trees in the 4 can be used for shading/cooling
the area for shading. area for shading when it hot in the area.
Moderate warm due to shades of tress Moderate warm dues to shades of Moderately warm due to shades of
a.2) Temperature 4 and breezy during noontime. 4 tress 4 trees
The site is vulnerable to natural The site is vulnerable to natural The site is also vulnerable to natural
a.3) 2 hazard especially tsunami. The 2 hazard especially tsunami. The 3 hazard especially tsunami. The
Vulnerabilities to tsunami wave height can be increase tsunami wave height can be tsunami wave height can be increase
Natural Hazard to 9m increase to 9.88m to 5m but not as to 9m.
Low density of any residential waste medium density of any residential High density of residential waste
a.5) pollution 5 and convenient for the proposal 4 waste and convenient for the 3 may cause bigger problem for
proposal operations in the area especially the
site located near the river.
b) Environmental Condition
Has excellent orientation because the Has good orientation because the Has very good orientation because
b.1) Orientation 5 site is center in trade industry by 3 site is near the fish port complex 4 the site is near the canning and
ASEAN region but the adjacent site is categorized fishing facilities
for agriculture
Very good wind direction because

Page 3|6
b.2) Wind Local air currents from the months of Has good orientation of wind due Has good orientation of wind due to
Direction 4 Nov. to Apr. is Northeastern Moon 3 to industrial productivity in the site 3 highly industrial zone it affects the
soon, while form the month of May it affects the quality of air in the quality of air in the area.
to Oct. the air currents are variable. area.
Negative 5 meters means low level of Negative 5 meters means low level Negative 5 meters means low level
b.3) Sea level 4 water in specific place good for 4 of water in specific place good for 4 of water in specific place good for
docking docking docking

The site is generally an open space Before the site is being used as
b.4) Flora and planted with coconut trees and some coconut farm area and its shoreline There is no existing habitat in the
Fauna 4 crops of Department of Agriculture. 2 is bounded with mangroves that 4 area since the site has present
The area has no existing Habitat of could be a habitat of some species coconut trees and other vegetation
certain species

There is no available breakwater The site has available breakwater There is no available breakwater
b.5) Availability 3 present in the area that can be a cause 4 but not all but a portion of it only 3 present in the area that can be a
of Break water of calamity issues in the development that can be great help for the cause of calamity issues in the
development development
5. Utilities and Community Services
a) Community service facility
There is the present of ARMY 4th
special force battalion detachment There is existing police station in There is the present of police station
a.1) Police 5 that manage the peace and order in 5 the area and other security facilities 5 in the area and also barangay tanods
the area. And also the police station 9 that maintain the peace and order of roaming around for the safety of the
station is located nearby that can easily the site. residents in the area.
monitor the site.
The site has no existing fire station. The site has no existing fire station.
a.2) Fire station 3 Since the nearby fire station in the 3 Since the fire station is from the 4 There is the present of fire station
area is from the other neighbor other barangay. nearby the area
barangay
The site has no existing health service There is no present of health
a.3)Health 3 facility. Since the nearby health 3 facility nearby the area. Since the 4 There is the present of health service
service facility facility is from other barangay. nearby health facility is from other facility nearby the area
barangay.
There is the present of coastguard in
the area since the ecozone is There is no present coast guard in There is no present coast guard in
Page 4|6
recreational park that must have a the area although the site is the area since the area is used for
a.4) Coast 3 coast guard for the safety of the 2 surrounded by other existing port 2 farming
Guard visitors. that has their own coastguard.

b) Availability of Utilities
The source of water supply in the
barangay came from the Talisayan Most of the source of water in the There is present of water supply
Water supply 4 Rural Water Works & Sanitation and 3 barangay comes from open well. 3 systems in the area but mostly the
also its exhibit a deepwell that can be residents used deep well for their
systems a source for alternative water supply. water.
The site has present power supply The site has present power supply The site has present power supply
systems and can be a source for and also the site is located in front systems in the area that can be used
Power supply 4 electricity in the future development. 4 of the fronting Western Mindanao 4 for the electricity in the development
Since the site is under by the Power Corporation. in the area.
systems ecozone, it has its own power supply
for backup.
Drainage There is existing drainage system in
systems 4 the area, this drainage system is 3 There is existing drainage system 3 There is no availability of drainage
owned by the ECOZONE in the area systems near the area

The sewage & drainage facility in the


area is within the premises of the
Sewage Disposal 4 ECOZONE compound. Since the site 3 There is no availability of drainage 3 There is no availability of drainage
is under the jurisdiction of systems & sewage Dispossal in the systems & sewage Dispossal in the
Zamboanga City Special economic area area
Zone therefore the site has the
availability of utilities
There is available existing
Telecommunicat Telecommunications lines in the area There is available existing There is available existing
ion Services 4 since the site is adjacent to the 4 telecommunication lines in the 4 telecommunication lines in the area.
Ecozone. area.

Page 5|6
100.00%

90.00%

80.00%

70.00%

60.00%

50.00%
Site A
40.00%
Site B
30.00% Site C
20.00%

10.00%

0.00%
Land Configuration Socio Econimic Factors Physical Environmental

Conclusion
Therefore the proponent conclude that, on the above rated criteria, site A is capable for the development of
the proposed project. Base on the chart above, the wining site A which is situated in Barangay Talisayan, Sitio San
Ramon as the more capable and suitable for setting the proposed “Complejo Purtuaro Maritimo de Zamboanga
(Zamboanga Integrated Seaport Complex)” the chosen is most suitable in terms of accessibility in the area
especially has potential for the “one stop shop for all”.

Page 6|6