VCS PROJECT CONSULTANTS PVT. LTD.

WORK DEMARCATION MATRIX


FOR
PIPELINE AND PIPING ENGINEERING DEPARTMENT

VPC – QD – PP – 006

00 27.10.2017 ISSUED AS STANDARD RK MC AD SK

Rev. No Date Purpose Prepared By Checked By Approved By Approved By

FORMAT: VPC-QD-002-R0 Copyright VCS Project – All rights reserved Page 1


Work demarcation between Pipeline & Piping Engg. and Other Department
S No ACTIVITY NAME / ITEM NAME
PE PC PP EL ME IN CE QA IT VR BD
1 Pipeline length, Ground Profile along the Pipeline
Route, wall thickness, location of SV stations &
Intermediate facilities

1.1 Scope of Concerned Discipline X


1.2 Scope of Other discipline X

2 Location of SV Stations with operation mode &


pipeline and intermediate facilities

2.1 Scope of Concerned Discipline X


2.2 Scope of Other discipline X X X X

3 Location and load data for piping supports/anchor


supports/equipment foundations for P/L facilities.
3.1 Scope of Concerned Discipline X
3.2 Scope of Other discipline X

4 Location and details of pump/ compressor house


4.1 Scope of Concerned Discipline X
4.2 Scope of Other discipline X X

5 Material Summary
5.1 Scope of Concerned Discipline X
5.2 Scope of Other discipline X
Work demarcation between Pipeline & Piping Engg. and Other Department
S No ACTIVITY NAME / ITEM NAME
PE PC PP EL ME IN CE QA IT VR BD

6 Pipeline Details (Length, profile, intermediate


facilities location, pipe dia, thickness and burial
depth)
FORMAT: VPC-QD-002-R0 Copyright VCS Project – All rights reserved Page 2 of 5
6.1 Scope of Concerned Discipline X
6.2 Scope of Other discipline X

7 Pipeline Details (Length, intermediate facilities


location, pipe dia, thickness, design and operating
parameters), route maps, soil data
7.1 Scope of Concerned Discipline X
7.2 Scope of Other discipline X

8 Nozzle orientation for equipments


8.1 Scope of Concerned Discipline X
8.2 Scope of Other discipline X

9 Piping Material Specification


9.1 Scope of Concerned Discipline X
9.2 Scope of Other discipline X X

10 Major crossing details


10.1 Scope of Concerned Discipline X
10.2 Scope of Other discipline X X

11 Pipeline details (dia, grade, thickness etc.)


Work demarcation between Pipeline & Piping Engg. and Other Department
S No ACTIVITY NAME / ITEM NAME
PE PC PP EL ME IN CE QA IT VR BD
11.1 Scope of Concerned Discipline X
11.2 Scope of Other discipline X X
12 Plot plan comments-pipeline corridor, area
requirement for pipeline facilities
12.1 Scope of Concerned Discipline X
12.2 Scope of Other discipline X

13 Structure drawing comments-pipeline supports,


operating platforms, crossover etc.
FORMAT: VPC-QD-002-R0 Copyright VCS Project – All rights reserved Page 3 of 5
13.1 Scope of Concerned Discipline X
13.2 Scope of Other discipline X

14 List of MOVs
14.1 Scope of Concerned Discipline X
14.2 Scope of Other discipline X

15 Inputs for MRs for skids (Surge Relief Valve,


Filteration, Metering, Let down skids)
15.1 Scope of Concerned Discipline X
15.2 Scope of Other discipline X

16 Inputs for MRs for Fuel Gas Conditioning skid,


Pumps (for strainers)
16.1 Scope of Concerned Discipline X
16.2 Scope of Other discipline X
Code- Is the Assigned Process Code for the Particular Discipline (Exp PP-01)

LEGEND
PE : PROJECT ENGINEERING
PC : PROCESS CONTROL
PP : PIPELINE AND PIPING
EL : ELECTRICAL
ME : MECHANICAL
IN : INSTRUMENTATION
CE : CIVIL ENGINEERING
QA : QUALITY ASSURANCE
IT : INFORATION TECHNOLOGY
VR : VENDOR
BD : BUISNESS DEVLOPMENT

FORMAT: VPC-QD-002-R0 Copyright VCS Project – All rights reserved Page 4 of 5


FORMAT: VPC-QD-002-R0 Copyright VCS Project – All rights reserved Page 5 of 5