DAILY MONITORING AND REPORT

WASTEWATER TREATMENT PLANT (WWTP) 03, BETUNG


PT MITRABARA ADIPERDANA Tbk. - PERIODE JANUARI 2021
Dosis Bahan Kimia
Air Pengotor 5.4.1 Air Pengotor 5.4.2 Air Pengotor 5.4.4 Total Suspended Solid/TSS (ppm) Frekuensi TSS 30 mnt Keterangan
Waktu Debit Rata- (ppm)
No Hari / Tanggal Volume (m3) Running Rata Tanah Polimer
(jam) (m3/jam) Durasi (jam) Volume (m3) Durasi Volume Durasi Inlet WWTP Box Pintu Inlet Rata2 5
Volume (m3) Elektrolit Titik 3 Titik 4 Titik 5 Formula >200 ppm Pengotor
(jam) (m3) (jam) 03 Treatment Air WWTP 02 Titik

1 1-Jan-21 30,990 24 1,291.27


2 2-Jan-21 29,684 24 1,236.83
3 3-Jan-21 31,249 24 1,302.03

4 4-Jan-21 31,090 24 1,295.40

5 5-Jan-21 43,476 24 1,811.48

6 6-Jan-21 41,284 24 1,720.16


7 7-Jan-21 40,761 24 1,698.38
8 8-Jan-21 39,223 24 1,634.29
9 9-Jan-21 34,724 24 1,446.82
10 10-Jan-21
11 11-Jan-21
12 12-Jan-21
13 13-Jan-21
14 14-Jan-21
15 15-Jan-21
16 16-Jan-21
17 17-Jan-21
18 18-Jan-21
19 19-Jan-21
20 20-Jan-21
21 21-Jan-21
22 22-Jan-21
23 23-Jan-21
24 24-Jan-21
25 25-Jan-21
26 26-Jan-21
27 27-Jan-21
28 28-Jan-21
29 29-Jan-21
30 30-Jan-21
31 31-Jan-21
TOTAL 322,479.67 216.00 1,492.96 0.00 0.00 0.00 0.00 0.00 0.00 568 18 27,372 5.00 0.00 0.00

Loreh, 19 Oktober 2020


Dibuat Oleh, Diperiksa Oleh, Di Setujui Oleh,

Admin Penanggung Jawab Site SPV Superintendent Operation Manager


Enviro PT MA Tbk, WWTP 3 PT WNC Enviro PT MA Tbk, Enviro PT MA Tbk, PT MA Tbk,