You are on page 1of 6

Petro-Canada Engineering Standard Page - Page

Petro-Canada
Norme d’ingénierie 1 of 6
de

Standard - Norme
B-40-2.0

Approved by - Approuvé par Subject - Objet Date - Date


S. GIANNANGELO CIVIL 1990-09-25
FENCING
Primary User - Usager Principal
REFINING

TABLE OF CONTENTS

1.0 SCOPE ...................................................................................................................... 2


1.1.2 GATES............................................................................................................ 2

2.0 CODES & STANDARDS............................................................................................ 2


2.2.2 AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM).................. 2

3.0 MATERIALS............................................................................................................... 3
3.1 Fabric ............................................................................................................. 3
3.2 Wire................................................................................................................ 3
3.3 Pipe ................................................................................................................ 3
3.4 Extension Arms .............................................................................................. 3
3.5 Top Rails ........................................................................................................ 3
3.6 Braces ............................................................................................................ 3
3.7 Hardware........................................................................................................ 4
3.8 Concrete......................................................................................................... 4
3.9 Miscellaneous................................................................................................. 4

4.0 INSTALLATION.......................................................................................................... 4
4.1 General .......................................................................................................... 4
4.2 Electrical......................................................................................................... 5

5.0 APPENDIX................................................................................................................. 6
TABLE A1 - SIZE OF TUBULAR MEMBERS ................................................. 6
TABLE A2 - FOUNDATION SIZES................................................................. 6
Petro-Canada Engineering Standard Page - Page
Petro-Canada
Norme d’ingénierie 2 of 6
de

Standard - Norme
B-40-2.0

Approved by - Approuvé par Subject - Objet Date - Date


S. GIANNANGELO CIVIL 1990-09-25
FENCING
Primary User - Usager Principal
REFINING

1.0 SCOPE

1.1 This standard consists of the supply and installation of fencing as specified and
shown on drawings and includes the following:

1.1.1 Concrete footings for posts.

1.1.2 GATES

1.2 Fencing shall be galvanized chain link type for fence heights up to 8' 0", topped with
3 strands of galvanized barbed wire.

2.0 CODES & STANDARDS

2.1 The latest edition of the following PCP Standards are to be used in conjunction with
this standard:

B-40-7 - Concrete Construction


B-40-8 - Concrete Materials

2.2 The following standards form part of this standard to the extent as specified:

2.2.1 Canadian Standards Association (CSA) Latest Edition

2.2.1.1 CSA G164-M Hot Dip Galvanizing of Irregularly Shaped Articles.

2.2.1.2 CSA C22.1 Canadian Electrical Code, Part I Safety Standards for Electrical
Installations.

2.2.2 AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)

2.2.2.1 ASTM A116 Specification for Zinc Coated (Galvanized) Steel Woven Wire Fence
Fabric)

2.2.2.2 ASTM A120 Specification for Pipe, Steel, Black and Hot-dipped Zinc-coated
(Galvanized) Welded and Seamless, for Ordinary Uses.

2.2.2.3 ASTM A121 Specification for Zinc Coated (Galvanized) Steel Barbed Wire.

2.2.2.4 ASTM A392 Specification for Zinc Coated Steel Chain-Link Fence Fabric
Petro-Canada Engineering Standard Page - Page
Petro-Canada
Norme d’ingénierie 3 of 6
de

Standard - Norme
B-40-2.0

Approved by - Approuvé par Subject - Objet Date - Date


S. GIANNANGELO CIVIL 1990-09-25
FENCING
Primary User - Usager Principal
REFINING

3.0 MATERIALS

3.1 Fabric

3.1.1 Supply chain-link pattern with 2" diamond mesh of 9 gauge (U.S. steel wire gauge)
woven steel fabric in accordance with ASTM A392 with Class 2 galvanizing. Twist
and barb top and bottom selvages.

3.2 Wire

3.2.1 Supply tension wire 7 gauge spring coil wire galvanized in accordance with ASTM
A116 Class 3; and locate at the top and bottom of the fabric.

3.2.2 Supply barbed wire strand consisting of two 12-1/2 gauge galvanized wires with 14
gauge galvanized barbs in a 4-point pattern at 6" centers, in accordance with ASTM
A121 and have Class 3 galvanizing.

3.3 Pipe

3.3.1 Supply tubular members in accordance with ASTM A120, Schedule 40, for weight
and coating with nominal diameters of the various members as shown in Table A-1
of the Appendix A, unless noted otherwise on Drawings.

3.3.2 Make gate frames from 2" nominal diameter pipe and braces from 1-1/2" nominal
diameter with heavy malleable iron or pressed steel corner fittings.

3.4 Extension Arms

3.4.1 Provide heavy pressed steel extension arms to posts, except terminal posts, to
support 3 rows of barbed wire. Vertical extension arms shall be used where the
fence is placed on the property line.

3.5 Top Rails

3.5.1 Provide top rails of 1 1/4" Schedule 40 pipe only on transformer yard fencing with
suitable expansion joints where necessary.

3.6 Braces

3.6.1 Install 1 1/4" Schedule 40 pipe, midway between the fence top and grade, to extend
horizontally from terminal posts to first adjacent line post. Securely fasten braces to
posts using heavy pressed steel connections and truss from line posts to terminal
post with 3/8" diameter adjustable truss rods. Brace corner posts each way.
Petro-Canada Engineering Standard Page - Page
Petro-Canada
Norme d’ingénierie 4 of 6
de

Standard - Norme
B-40-2.0

Approved by - Approuvé par Subject - Objet Date - Date


S. GIANNANGELO CIVIL 1990-09-25
FENCING
Primary User - Usager Principal
REFINING

3.7 Hardware

3.7.1 Provide Manufacturer's standard hardware, with the following qualifications:

3.7.1.1 Hinges: Offset for 90° open stand

3.7.1.2 Latches: Gravity engagement with provision for padlocking.

3.7.1.3 Keepers: Automatic "hold-open" type, installed at bottom rails

3.7.1.4 Stops: Center stops are required for all double gates.

3.8 Concrete

3.8.1 Use concrete for footings having a minimum compressive strength of 2900 psi (20
Mpa) at 28 days and conforming with PCP Standard B-40-8.

3.9 Miscellaneous

3.9.1 Securely fasten the fabric to terminal, pull and corner posts by means of 1/4" X 3/4"
steel tension bars, secure them to the posts with 11 gauge pressed steel bands at
18" centers.
3.9.2 Fasten the fabric to line posts and top rails with 6 gauge wire clips at 18" centers
and to the bottom tension wire with 9 gauge tie wires at 2' 0" centers.

3.9.3 Provide posts with tops to exclude moisture from the post interior.

3.9.4 Supply fittings, unless otherwise specified, galvanized in accordance with CSA
G164.

4.0 INSTALLATION

4.1 General

4.1.1 Install posts at 10'-0" centers maximum and plumb both ways. Firmly support posts
while concrete is hardening.

4.1.2 Do concrete work in accordance with PCP Standard B-40-7. Do not pour concrete
against frozen ground.

4.1.3 Set the top of foundation, 1/2" below bottom of fabric and slope to shed water. For
foundation sizes, see Table A2 of the Appendix A.
Petro-Canada Engineering Standard Page - Page
Petro-Canada
Norme d’ingénierie 5 of 6
de

Standard - Norme
B-40-2.0

Approved by - Approuvé par Subject - Objet Date - Date


S. GIANNANGELO CIVIL 1990-09-25
FENCING
Primary User - Usager Principal
REFINING

4.1.4 Provide pull posts for each 500' length of straight fence and where a change of 15
degrees or more in either grade or direction occurs.

4.1.5 Install the fabric so that the top is a minimum 6'-0" above the adjacent grade and the
bottom follows the contours of finished grade with no more than 2" clearance below
the bottom of fence.

4.2 Electrical

4.2.1 Install fences around electrical installations in accordance with CSA C-22.1.
Grounding of fence will be performed by others.

4.2.2 Provide terminal, corner and pull posts for electrical installation fencing using 3"
minimum nominal diameter pipe.
Petro-Canada Engineering Standard Page - Page
Petro-Canada
Norme d’ingénierie 6 of 6
de

Standard - Norme
B-40-2.0

Approved by - Approuvé par Subject - Objet Date - Date


S. GIANNANGELO CIVIL 1990-09-25
FENCING
Primary User - Usager Principal
REFINING

5.0 APPENDIX

TABLE A1 - SIZE OF TUBULAR MEMBERS

Nominal Pipe
Diameter
Line Posts 2"
Terminal Posts 2½"*
End, Corner and Pull Posts 2½"*
Swing Gate Posts:
Openings up to 6'-0" 2½"
Over 6'-0" up to 13'-0" 4"
Over 13'-0" up to 18'-0" 6"
Over 18'-0" up to 30'-0" 8"

*For electrical installation fencing, see Paragraph 4.2.2.

TABLE A2 - FOUNDATION SIZES

Post Type Post Diameter of Footing


Embedment Footing Depth
Line Post 3'-0" 10" 3'-4"
Terminal Post 3'-6" 12" 3'-10"
Gate Posts:
2½" 3'-6" 12" 3'-10"
3" 3'-6" 12" 3'-10"
3½" 3'-6" 12" 3'-10"
6" 4'-6" 18" 4'-10"
8" 5'-0" 2'-0" 5'-4"