DEPARTEMEN PERTAMBANGAN DAN MINISTRY OF MINES AND ENERGY OF THE

ENERGI REPUBLIK INDONESIA REPUBLIC OF INDONESIA


DIREKTORAT JENDERAL MINYAK DAN GAS DIRECTORATE GENERAL OF
BUMI OIL AND GAS

KEPUTUSAN DIREKTUR JENDERAL MINYAK DECREE OF THE DIRECTOR GENERAL OF


DAN GAS BUMI OIL AND GAS
Nomor 84.K/38/DJM/1998 Number 84.K/38/DJM/1998

TENTANG REGARDING

PEDOMAN DAN TATACARA PEMERIKSAAN INSPECTION GUIDELINES AND


KESELAMATAN KERJA ATAS INSTALASI, PROCEDURES FOR OCCUPATIONAL SAFETY
PERALATAN DAN TEKNIK YANG OF THE PLANT, EQUIPMENT AND
DIPERGUNAKAN DALAM USAHA ENGINEERING EMPLOYED IN THE MINING
PERTAMBANGAN MINYAK DAN GAS BUMI OPERATIONS OF OIL AND GAS AS WELL AS
DAN PENGUSAHAAN SUMBERDAYA EXPLOITATION OF GEOTHERMAL
PANASBUMI RESOURCES

DIREKTUR JENDERAL THE DIRECTOR GENERAL OF


MINYAK DAN GAS BUMI OIL AND GAS

Memimbang : Considering :

bahwa dalam rangka kelancaran pelaksanaan that in the framework of smooth implementation of the
pemeriksaaan keselamatan kerja atas instalasi, inspection for occupational safety of the plant,
peralatan dan teknik yang dipergunakan dalam usaha equipment and engineering employed in the mining
pertambangan minyak dan gas bumi dan pengusahaan operations of Oil and Gas as well as exploitation of
sumberdaya panasbumi dan sebagai pelaksanaan lebih geothermal resources and as further implementation of
lanjut Peraturan Menteri Pertambangan dan Energi the Regulation of the Minister of Mines and Energy
Nomor 06 P/ 0746/ M.PE/1991 tanggal 19 Nopember Number 06 P/ 0746/ M.PE/1991 dated 19th November
1991, dianggap perlu menerapkan Pedoman dan 1991, it is deemed necessary to stipulate Inspection
Tatacara Pemeriksaan Keselamatan Kerja atas Guidelines and Procedures for Occupational Safety of
Instalasi, Peralatan dan Teknik Yang Dipergunakan the Plant, Equipment and Engineering employed in the
Dalam Usaha Pertambangan Minyak dan Gas Bumi Mining Operations of Oil and Gas as well as
Dan Pengusahaan Sumberdaya Panasbumi dalam suatu Exploitation of Geothermal Resources in a Decree of
Keputusan Direktur Jenderal Minyak dan Gas Bumi ; the Director General of Oil and Gas;

Mengingat : Taking into Account :

1. Undang-undang Nomor 44 Prp Tahun 1960 1. Law Number 44 Prp of 1960 (Official Gazette of
(L.N. Tahun 1960 Nomor 33, TLN Nomor 2070) ; 1960 Number 33, Supplement to the Official
Gazette Number 2070);

2. Undang-undang Nomor 8 Tahun 1971 2. Law Number 8 of 1971 (Official Gazette of 1971
(L.N. Tahun 1971 Nomor 76, TLN Nomor 2971) ; Number 76, Supplement to the Official Gazette
Number 2971);

3. Mijn Politie Reglement 1930 Sb. 1930 Nomor 341) 3. Mijn Politie Reglement of 1930 (Sb. Of 1930
; Number 341);

4. Peraturan Pemerintah Nomor 11 Tahun 1979 4. Government Regulation Number 11 of 1979;


WTCJ-02116 1
Decicion of the Director General of Petroleum and Gas No.84.K/38/DJM/1998
5. Keputusan Presiden Nomor 22 Tahun 1981 tanggal 5. Presidential Decree Number 22 of 1981 dated 1 st
1 Juni 1981 Jo. Keputusan Presiden Nomor 45 June 1981 Jo. Presidential Decree Number 45 of
Tahun 1991 tanggal 1 Oktober 1991 ; 1991 dated 1st October 1991;

6. Keputusan Presiden Nomor 374/M Tahun 1995 6. Presidential Decree Number 374/M of 1995 dated
tanggal 23 Nopember 1995 ; 23rd November 1995;

7. Peraturan Menteri Pertambangan dan Energi 7. Regulation of the Minister of Mines and Energy
Nomor 02/P/M/Pertamb/1975 tanggal 10 Maret Number 02/P/M/Pertamb/1975 dated 10th March
1975 ; 1975;

8. Keputusan Menteri Pertambangan dan Energi 8. Decree of the Minister of Mines and Energy
Nomor 02/P/M/Pertamb/1979 tanggal 30 Juni 1979 Number 02/P/M/Pertamb/1979 dated 30th June
1979;

9. Keputusan Menteri Pertambangan dan Energi 9. Decree of the Minister of Mines and Energy
Nomor 521/Kpts/1979 tanggal 20 Juni 1979 ; Number 521/Kpts/1979 dated 20th June 1979;

10. Peraturan Menteri Pertambangan dan Energi 10. Regulation of the Minister of Mines and Energy
Nomor 06 P/0746/M.PE/1991 tanggal 19 Number 06 P/0746/M.PE/1991 dated 19th
Nopember 1991 ; November 1991;

11. Keputusan Menteri Pertambangan dan Energi 11. Decree of the Minister of Mines and Energy
Nomor 300.K/38/M.PE/1997 tanggal 28 April Number 300.K/38/M.PE/1997 dated 28th April
1997 ; 1997;

12. Peraturan Direktur Jenderal Minyak dan Gas Bumi 12. Regulation of the Director General of Petroleum
Nomor 43P/382/DDJM/1992 tanggal 19 and Gas Number 43P/382/DDJM/1992 dated 19th
September 1992 ; September 1992;

MEMUTUSKAN : DECIDED :

Menetapkan : To draw up :

KEPUTUSAN DIREKTUR JENDERAL MINYAK DECREE OF THE DIRECTOR GENERAL OF OIL


DAN GAS BUMI TENTANG PEDOMAN DAN AND GAS REGARDING INSPECTION
TATACARA PEMERIKSAAN KESELAMATAN GUIDELINES AND PROCEDURES FOR
KERJA ATAS INSTALASI, PERALATAN DAN OCCUPATIONAL SAFETY OF THE PLANT,
TEKNIK YANG DIPERGUNAKAN DALAM EQUIPMENT AND ENGINEERING EMPLOYED
USAHA PERTAMBANGAN MINYAK DAN GAS IN THE MINING OPERATIONS OF OIL AND GAS
BUMI DAN PENGUSAHAAN SUMBERDAYA AS WELL AS EXPLOITATION OF GEOTHERMAL
PANASBUMI. RESOURCES.

Pasal 1 Article 1

(1) Segala definisi atau pengertian yang dipergunakan (1) Any definitions or terminologies used in this
dalam Keputusan ini adalah definisi atau Decree shall be definitions or terminologies as
pengertian sebagaimana dimaksud dalam Pasal 1 referred to in Article 1 of the Decree of the
Keputusan Menteri Pertambangan dan Energi Minister of Mines and Energy Number
Nomor 06P/0746/M.PE/1991 tanggal 19 6P/0746/M.PE/1991 dated 19th November 1991.
Nopembner 1991
(2) In addition to those as already provided in
(2) Selain sebagaimana telah ditetapkan pada ayat (1), paragraph (1), in this Decree, meant by :
WTCJ-02116 2
Decicion of the Director General of Petroleum and Gas No.84.K/38/DJM/1998
dalam Keputusan ini yang dimaksud dengan : a. Worthiness Operation Certificate shall be
a. Sertifikat Kelayakan approval given by the Director General of the
Penggunaan, adalah persetujuan yang diberikan operation or use of the Plant and Equipment
Direktur Jenderal atas operasi atau penggunaan after being carried out an Inspection for
Instalasi dan Peralatan setelah dilakukan Occupational Safety in the form of a
pemeriksaan Keselamatan Kerja, yang berupa Worthiness of Plant Installation Certificate
Sertifikat Kelayakan Penggunaan Instalasi (SKPI) and Worthiness of Equipment
(SKPI) dan Sertifikat Kelayakan Penggunaan Operation Certificate (SKPP);
Peralatan (SKPP);
b. Directorate General shall be the Directorate
b. Direktorat Jenderal, adalah General of Oil and Gas;
Direktorat Jenderal Minyak dan Gas Bumi;
c. Director shall be the Director of Oil and Gas
c. Direktur, adalah Direktur Mining Engineering;
Teknik Pertambangan Minyak dan Gas Bumi;
d. Engineering Directorate shall be the
d. Direktorat Teknik, adalah Directorate of Oil and Gas Mining
Direktorat Teknik Pertambangan Minyak dan Engineering;
Gas Bumi;
e. Mine Head Inspector shall be the Oil and Gas
Mine Inspection Head;
e. Kepala Pelaksana Inspeksi
Tambang, adalah Kepala Inspeksi Tambang
Minyak dan Gas Bumi; f. Mine Inspector shall be an officer of the
Directorate General appointed by the Director
f. Pelaksana Inspeksi Tambang, General;
adalah pejabat Direktorat Jenderal yang
diangkat oleh Direktur Jenderal g. Company shall be Pertamina, Production
Sharing Contractor. Technical Assistance,
g. Perusahaan, adalah Pertamina, Joint Operating Body and another work
Kontraktor Kontrak Production Sharing, partner of Pertamina in the Oil and Gas
Technical Assistance, Joint Operating Body, operations and Joint Operation Contract
dan mitra kerja Pertamina lainnya dalam operasi Contractor in the Exploitation of Geothermal
Minyak dan Gas Bumi dan Kontraktor Kontrak Resources;
Operasi Bersama Pengusahaan Sumberdaya
Panasbumi; h. Service Company shall be an Technical
Inspection Service Company in the fields of
Oil and Gas mining and exploitation of
h. Perusahaan Jasa adalah geothermal resources already having an
Perusahaan Jasa Inspeksi Teknik dalam bidang appointment from the Director General.
pertambangan minyak dan gas bumi dan
pengusahaan sumberdaya panasbumi yang telah
mendapatkan penunjukan Direktur Jenderal.
Article 2

(1) Of the Plant and Equipment in the mining


Pasal 2 operations of Oil and Gas, shall be carried out an
inspection for Occupational Safety.
(1) Terhadap Instalasi dan Peralatan
dalam operasi pertambangan minyak dan gas bumi (2) The Inspection for Occupational Safety as referred
wajib dilaksanakan pemeriksaan Keselamatan to in paragraph (1) shall be carried out of the Plant
Kerja. and Equipment which :
a. will be installed or erected;
(2) Pemeriksaan Keselamatan Kerja b. is being installed or erected;
sebagaimana dimaksud pada ayat (1) dilakukan c. has been installed or erected.
WTCJ-02116 3
Decicion of the Director General of Petroleum and Gas No.84.K/38/DJM/1998
terhadap Instalasi dan Peralatan yang :
a. akan dipasang atau didirikan; (3) Of the equipment manufactured based on an order
b. sedang dipasang atau and not mass production, the inspection for
didirikan; Occupational Safety can be carried out in the place
c. telah dipasang atau didirikan. where the equipment is manufactured.

(3) Terhadap peralatan yang dibuat


berdasarkan pesanan dan bukan merupakan Article 3
produksi masal, pemeriksaan Keselamatan Kerja
dapat dilakukan ditempat pembuatan peralatan. The Plant and Equipment of which the inspection for
Occupational Safety shall be carried out shall be as
referred to in Attachment 1 to this Decree.
Pasal 3
Article 4
Instalasi dan Peralatan yang wajib dilaksanakan
pemeriksaan Keselamatan Kerja adalah sebagaimana (1) The Inspection for Occupational Safety of the
termaksud dalam Lampiran I Keputusan ini. Plant and Equipment as referred to in Article 2
shall be carried out by the Mine Inspector and / or
Pasal 4 by the Service Company.

(1) Pemeriksaan Keselamatan Kerja (2) The Inspection procedures for Occupational Safety
atas Instalasi dan Peralatan sebagaiman dimaksud of the Plant and Equipment shall be as referred to
dalam Pasal 2 dilaksanakan oleh Pelaksana in Attachment II to this Decree.
Inspeksi Tambang dan atau oleh Perusahaan Jasa.

(2) Tatacara Pemeriksaan Article 5


Keselamatan Kerja atas Instalasi dan Peralatan
adalah sebagaimana termaksud dalam Lampiran II (1) For the Plant and Equipment of which the
Keputusan ini. inspection for Occupational Safety has been
carried out shall be issued a Worthiness of Plant
Installation Certificate (SKPI) and Worthiness of
Pasal 5 Equipment Operation Certificate (SKPP) by the
Director General.
(1) Terhadap Instalasi dan Peralatan
yang telah dilaksanakan pemeriksaan Keselamatan (2) The Worthiness of Plant Installation Certificate
Kerja diberikan Sertifikat Kelayakan Penggunaan (SKPI) and Worthiness of Equipment Operation
Instalasi (SKPI) dan Sertifikat Kelayakan Certificate (SKPP) as referred to in paragraph (1)
Penggunaan Peralatan (SKPP) oleh Direktur shall be valid for a period of 5 (five) years for
Jenderal SKPI and 3 (three) years for SKPP, or less than the
periods as mentioned above if the Plant and
(2) Sertifikat Kelayakan Penggunaan Equipment has a modification or its ability is
Instalasi (SKPI) dan Sertifikat Kelayakan doubted.
Penggunaan Peralatan (SKPP) sebagaimana
dimaksud pada ayat (1) berlaku selama jangka (3) After the periods as referred to in paragraph (2)
waktu 5 (lima) tahun untuk SKPI dan 3 (tiga) tahun have ended, of the Plant and Equipment shall be
untuk SKPP, atau kurang dari jangka waktu carried out an inspection for Occupational Safety
tersebut di atas apabila Instalasi dan Peralatan as referred to in Article 2.
tersebut mengalami perubahan atau diragukan
kemampuannya.
Article 6
(3) Setelah selesainya jangka waktu
sebagaimana dimaksud pada ayat (2), terhadap After a technical evaluation which will be employed as
Instalasi dan Peralatan wajib dilakukan referred to in Attachment I letter C has been carried
pemeriksaan Keselamatan Kerja sebagaimana out, the Director General Cq. Director shall issue
dimaksud dalam Pasal 2. ratification.
WTCJ-02116 4
Decicion of the Director General of Petroleum and Gas No.84.K/38/DJM/1998
Pasal 6 Article 7

Setelah dilaksanakan evaluasi terhadap teknik yang The amount of the inspection cost for Occupational
akan dipergunakan sebagaimana termaksud dalam Safety of the Plant and Equipment carried out by the
Lampiran I huruf C, Direktur Jenderal Cq. Direktur Service Company shall be fixed based on the
memberikan pengesahan. mechanism of the labour (manpower) market in the
fields of petroleum and Gas.
Pasal 7

Besarnya biaya pemeriksaan Keselamatan Kerja atas Article 8


Instalasi dan Peralatan yang dilaksanakan oleh
Perusahaan Jasa ditetapkan berdasarkan mekanisme In a period of 6 (six) months since the effectiveness of
pasar tenaga kerja bidang minyak dan gas bumi. this Decree, the Company which has been operating or
employing the Plant and Equipment and has not yet
implemented the provisions of this Decree shall be
under an obligation to submit an application for an
Pasal 8 inspection for Occupational Safety of the Plant,
Equipment and Engineering employed to the
Dalam jangka waktu 6 (enam) bulan sejak berlakunya Directorate General cq. Engineering Directorate.
Keputusan ini, Perusahaan yang telah beroperasi atau
telah menggunakan Instalasi dan Peralatan dan belum
melakukan ketentuan dan Keputusan ini wajib Article 9
mengajukan permohonan pemeriksaan Keselamatan
Kerja atas Instalasi, Peralatan dan Teknik yang In case of shortcomings in the Plant or Equipment after
dipergunakan kepada Direktorat Jenderal cq. being carried out an inspection for Occupational
Direktorat Teknik. Safety, then in a period as stipulated by the Director,
the Company shall be under an obligation to make
repairs or modifications so that the Plant and
Pasal 9 Equipment will satisfy the matters required by the
prevailing legislative regulations.
Apabila terdapat kekurangan-kekurangan pada
Instalasi atau Peralatan setelah diadakan pemeriksaan
Keselamatan Kerja, maka dalam waktu yang
ditetapkan oleh Direktur, Perusahaan wajib Article 10
mengadakan perbaikan atau perubahan sehingga
Instalasi dan Peralatan tersebut memenuhi hal-hal yang This Decree shall come into effect as of its stipulation
disyaratkan oleh peraturan perundang-undangan yang date.
berlaku.

Stipulated in Jakarta
Pasal 10 On 19th August 1998

Keputusan ini berlaku pada tanggal ditetapkan. The Directorate General of


Oil and Gas

Ditetapkan di Jakarta
Pada tanggal, 19 Agustus 1998
Soepraptono Soeleiman
Direktur Jenderal Minyak dan Gas Bumi

WTCJ-02116 5
Decicion of the Director General of Petroleum and Gas No.84.K/38/DJM/1998
Soepraptono Soeleiman Attachment I to the Decree of the Director
General of Oil and Gas
Number : 84.K/38/DJM/1998
Dated : 19th August 1998
--------------------------------------

Lampiran I Keputusan Direktur PLANT AND EQUIPMENT SUBJECT TO THE


Jenderal Minyak dan Gas Bumi INSPECTION FOR OCCUPATIONAL SAFETY
Nomor : 84.K/38/DJM/1998
Tanggal : 19 Agustus 1998
-------------------------------------
A. Plant

INSTALASI DAN PERALATAN YANG WAJIB 1. Exploration and Exploitation Plant :


DILAKSANAKAN PEMERIKSAAN a. Drilling plant;
KESELAMATAN KERJA b. Production plant;
c. Gathering plant
d. Other plant related to the Exploration and
A. Instalasi Exploitation activities

1. Instalasi Ekplorasi dan Eksploitasi : 2. Refinement and Treatment Plant :


a. Instalasi pemboran; a. Refinement and Treatment Plant;
b. Instalasi produksi; b. Unloading and Loading;
c. Instalasi pengumpulan c. Other plant related to the Refinement and
d. Instalasi lainnya yang terkait dengan Treatment activities, either directly or
kegiatan Eskplorasi dan Eksploitasi indirectly related to the activities in
question.
2. Instalasi Pemurnian dan Pengolahan :
a. Instalasi Pemurnian dan Pengolahan; 3. Storage and Marketing Plant, that is :
b. Pembongkaran dan Pemuatan;
c. Instalasi lainnya yang terkait dengan a. Seafed Depot Plant;
kegiatan Pemurnian dan Pengolahan baik b. Inland Depot Plant;
langsung maupun tidak langsung c. Aircraft Fuelling Depot (DPPU) Plant;
berhubungan dengan kegiatan termaksud.
d. Transit Terminal Plant;
3. Instalasi Penimbunan dan Pemasaran yang e. Public Fuelling Station (SPBU) and Gas
dimaksud adalah : Fuelling Station (SPBG) Plant;
a. Instalasi Seafed Depot;
b. Instalasi Inland Depot; f. Other plant related to the storage and
c. Instalasi Depot Pengisian Pesawat Udara marketing activities
(DPPU);
d. Instalasi Transit Terminal; B. Equipment
e. Instalasi Stasiun Pengisian Bahan Bakar
Umum (SPBU) dan Stasiun Pengisian 1. Safety Valves, that is equipment useful to
Bahan Bakar Gas (SPBG); protect the related equipment and facilities
f. Instalasi lainnya yang terkait dengan comprising :
kegiatan penimbunan dan pemasaran
a. Safety Valve;
B. Peralatan b. Relief Valve;
c. Safety Relief Valve;
1. Katup Pengaman yaitu peralatan yang d. Thermal Relief Valve;
berguna untuk melindungi peralatan dan e. Pilot Operated Safety Valve;
fasilitas yang terkait meliputi : f. Vacuum Relief Valve.
WTCJ-02116 6
Decicion of the Director General of Petroleum and Gas No.84.K/38/DJM/1998
a. Safety Vale; 2. Pressure Vessel and the like, that is equipment
b. Relief Valve; working with a work pressure within the
c. Safety Relief Valve; equipment of more than ½ more pressure Atm
d. Thermal Relief Valve; (gauge), or vacuum vessel with a work
e. Pilot Operated Safety Valve; pressure within the equipment of less than 1
f. Vacuum Relief Valve. absolute Atm.

2. Bejana Tekan dan sejenisnya yaitu peralatan 3. Lifting Equipment / Crane, that is equipment
yang bekerja dengan tekanan kerja didalam to remove, lift up goods vertically and / or
peralatan melebihi ½ Atm tekanan lebih horizontally at a distance, among others
(gauge), atau bejana vakum dengan tekanan including :
kerja didalam peralatan kurang dari 1 Atm a. Mobile Cranes;
absolut. b. Stationary Cranes;
c. Overhead Cranes.
3. Pesawat Angkat yaitu peralatan untuk
memindahkan, mengangkat barang secara 4. Electrical equipment, that is equipment
vertikal dan atau horizontal dalam jarak, generating, distributing and controlling the
antara lain meliputi : electrical power system comprising :
a. Pesawat Angkat Bergerak; a. Power Generator Unit;
b. Pesawat Angkat Tetap; b. Power Transformer Unit;
c. Pesawat Angkat di atas kepala. c. Switcher Unit;
d. Motor Control Center Unit.
4. Peralatan Listrik yaitu peralatan yang
membangkit, mendistribusi dan 5. Rotary Equipment, that is equipment
mengendalikan sistem tenaga listrik meliputi : functioning to remove or compress petroleum,
a. Unit Power Generator; Gas and geothermal comprising :
b. Unit Power Transformer; a. Compressor Unit;
c. Unit Switcher; b. Pump Unit.
d. Unit Motor Control Center.
6. Pipeline, that is a range of pipe together with
5. Peralatan Putar yaitu peralatan yang berfungsi related facilities used to transmit and distribute
memindahkan atau memampatkan minyak, Oil and Gas as well as geothermal.
gas serta panasbumi meliputi :
a. Unit Kompresor;
b. Unit Pompa. C. Engineering Employed

6. Pipa Penyalur yaitu bentang pipa berikut The engineering employed, that is procedures
fasilitas-fasilitas terkait yang digunakan untuk which will be employed in the mining operations
mengalirkan dan menyalurkan minyak dan of Oil and Gas, among others includes :
gas bumi serta panasbumi.

C. Teknik Yang Dipergunakan 1. Welding Procedures Specifications (WPS) and


Procedure Qualification Record (PQR);
Teknik yang dipergunakan yaitu tata cara atau 2. Performance Record (Certificate) of the
prosedur yang akan dipergunakan dalam operasi Welder / Welding Operator;
pertambangan minyak dan gas bumi antara lain 3. Pressure Test Procedures for Pipeline;
meliputi : 4. Load Test Procedures;
5. Procedures for Repairs, Modification and
1. Spesifikasi Prosedur Las (WPS) dan Rekaman Alteration.
Kualifikasi Prosedur (PQR);
2. Catatan Unjuk Kerja (Sertifikat) Juru Las /
Operator Las;
3. Prosedur Uji Tekan Pipa Penyalur;
4. Prosedur Uji Beban Pesawat Angkat;
WTCJ-02116 7
Decicion of the Director General of Petroleum and Gas No.84.K/38/DJM/1998
5. Prosedur Reparasi, Modifikasi dan Alterasi. Stipulated in Jakarta
On 19th August 1998

The Director General of Oil and Gas

Soepraptono Soeleiman
Ditetapkan di Jakarta
Pada tanggal, 19 Agustus 1998

Direktur Jenderal Minyak dan Gas Bumi

Soepraptono Soeleiman

WTCJ-02116 8
Decicion of the Director General of Petroleum and Gas No.84.K/38/DJM/1998
Attachment II to the Decree of the Director
General of Oil and Gas
Number : 84.K/38/DJM/1998
Dated : 19th August 1998
------------------------------------

Lampiran II Keputusan Direktur INSPECTION PROCEDURES FOR


Jenderal Minyak dan Gas Bumi OCCUPATIONAL SAFETY OF THE PLANT
Nomor : 84.K/38/DJM/1998 AND EQUIPMENT
Tanggal : 19 Agustus 1998
--------------------------------------
1. INSPECTION FOR OCCUPATIONAL
SAFETY OF THE PLANT
TATACARA PEMERIKSAAN KESELAMATAN
KERJA A. The Inspection for Occupational Safety of the
ATAS INSTALASI DAN PERALATAN Plant includes an evaluation of the designs by
reviewing of the data on :

I. PEMERIKSAAN KESELAMATAN KERJA a. Process, utilities and waste treatment


INSTALASI equipment;
b. Measuring and metering devices;
A. Pemeriksaan Keselamatan Kerja Instalasi c. Piping system;
meliputi penilaian perencanaan dengan d. Instrumentation system;
melaksanakan penelaahan terhadap data : e. Safety appliances;
f. Storage tank;
a. Peralatan proses, utilitas dan pengolahan g. Fire prevention and control system;
limbah;
b. Alat ukur dan metering; h. Environmental pollution monitoring and
c. Sistem perpipaan; prevention system;
d. Sistem intrumentasi; i. Other equipment;
e. Piranti pengaman; j. Process flow diagram and pipe & instrument
f. Tangki timbun; diagram;
g. Sistem pencegahan dan penanggulangan k. Equipment Layout drawing;
kebakaran; l. Civil works;
h. Sistem pencegahan dan pemantauan m. Hazardous area classification;
pencemaran lingkungan;
i. Peralatan lain; n. Electrical one line diagram;
j. Diagram alir proses dan diagram pipa & o. Grounding layout;
instrumen;
k. Gambar tata letak peralatan; p. Cause & effect diagram / SAFE Chart;
l. Pekerjaan sipil; q. Operation Procedures of the equipment;
m. Klasifikasi daerah berbahaya (hazardous r. Emergency evacuation procedures;
area classification); s. Approval letter or recommendation from the
n. Electrical one line diagram; competent authorities for the Environmental
o. Gambar tata letak pentanahan (grounding Protection Monitoring and Processing
lay-out); program.
p. Diagram cause & effect / SAFE Chart;
q. Prosedur kerja pengoperasian peralatan; B. Physical Inspection
r. Prosedur evakuasi darurat;
s. Surat persetujuan atau rekomendasi dari The physical inspection includes :
instansi yang berwenang untuk program 1. Inspection of the Plant to ensure whether or
Pengolahan dan Pemantauan Lindungan not the Plant complies with the designs,
Lingkungan. specifications, manufacturing and installation
procedures.
WTCJ-02116 9
Decicion of the Director General of Petroleum and Gas No.84.K/38/DJM/1998
B. Pemeriksaan fisik. 2. Inspection for the completeness of Quality of
the Equipment, Occupational Safety
Pemeriksaan fisik meliputi : Techniques and Environmental Protection
1. Pemeriksaan Instalasi untuk memastikan including :
sesuai tidaknya Instalasi dengan perencanaan, a. Fire Fighting Equipment;
spesifikasi, prosedur pembuatan dan b. Fire, heat, smoke and hazardous gas
pemasangan. detectors;
2. Memeriksa Kelengkapan Mutu Peralatan, c. Personal protection and safety equipment;
Teknik Keselamatan Kerja dan Lindungan
Lingkungan meliputi : d. Communication system;
e. Emergency shutdown and control system;
a. Alat Pemadam kebakaran;
b. Alat deteksi api, panas, asap dan gas f. Inspection of stairs, lights, flight of steps
berbahaya; and handrails;
c. Alat perlengkapan penyelamatan dan g. Flaring;
pelindung perorangan; h. Rock muffler;
d. Sistem komunikasi; i. Environmental pollution prevention and
e. Sistem kontrol dan penghentian darurat control equipment;
(emergency shutdown system); j. System to eliminate the hazards of static
f. Pemeriksaan tangga, lampu, bordes dan electricity and other electric currents;
handrail; k. Signs of occupational safety i.e : sign of
g. Flaring; warning, prohibition, red code and other
h. Rock muffler signs.
i. Peralatan pencegahan dan penanggulangan
pencemaran lingkungan; 3. Inspection for the Completeness of the
j. Sistem untuk meniadakan bahaya listrik Worthiness of Equipment Operation
statis dan arus listrik lainnya; Certificate, Worthiness of Platform
k. Tanda-tanda keselamatan kerja, antara Construction Certificate as well as Operation
lain; tanda peringatan, larangan, kode License from the related technical agencies, i.e
merah dan tanda lainnya. :
a. Safety Valve;
3. Memeriksa Kelengkapan Sertifikat Kelayakan b. Pressure Vessel and other similar
Penggunaan Peralatan, Sertifikat Kelayakan equipment;
Konstruksi Platform serta Ijin Penggunaan dari c. Rotary Equipment (pump unit and
Instansi teknis terkait antara lain : compressor unit);
d. Electrical equipment;
e. Lifting Equipment;
a. Katup pengaman; f. Pipeline;
b. Bejana Tekan dan peralatan lain g. Offshore Platform Structure;
sejenisnya; h. Steam Boiler, Steam Vessel, Navigation
c. Peralatan Berputar (unit pompa dan unit Aids, Measuring & Metering Devices,
kompresor); Weighing Equipment, Helideck,
d. Peralatan Listrik; Radioactive Substance, Explosives, etc;
e. Pesawat Angkat i. Individual protection and safety
f. Pipa Penyalur equipment.
g. Struktur Anjungan Lepas Pantai;
h. Ketel Uap, Bejana Uap, Alat bantu 4. The drilling plant shall specially be subject to a
Navigasi, Alat Ukur & Metering, Alat periodic inspection pursuant to the
Timbang, Helideck, Zat Radio Aktif, Implementation Guidelines of Safe Onshore
Bahan Peledak, dan lain-lain; and Offshore Drilling Operations in Indonesia
i. Peralatan penyelamatan dan perlindungan (KK-01-DMJ).
perorangan
5. Pre-Commissioning, Commissioning and
4. Khusus Instalasi pemboran wajib dilakukan Testing.
pemeriksaan berkala sesuai dengan Pedoman
WTCJ-02116 10
Decicion of the Director General of Petroleum and Gas No.84.K/38/DJM/1998
Pelaksanaan Operasi Pemboran Darat dan C. Reporting
Lepas Pantai Yang Aman di Indonesia (KK-
01-DMJ). To prepare all the technical inspection results in
the form of documents to be submitted to the
5. Pemeriksaan Pre–Commissioning, Director of the Directorate of Petroleum and Gas
Commissioning dan Pengujian. Mining Engineering as evaluation material for the
issue of the Worthiness of Plant Operation
C. Pelaporan Certificate.

Menyusun seluruh hasil pemeriksaan teknis II. INSPECTION FOR OCCUPATIONAL


berbentuk dokumen untuk diserahkan ke Direktur SAFETY OF THE EQUIPMENT :
Direktorat Teknik Pertambangan Minyak dan Gas
Bumi sebagai bahan evaluasi untuk penerbitan A. INSPECTION FOR OCCUPATIONAL
Sertifikat Kelayakan Penggunaan Instalasi. SAFETY OF THE SAFETY VALVE

The technical inspection of the safety valve


II. PEMERIKSAAN KESELAMATAN KERJA includes :
ATAS PERALATAN : a. Review of Documents
- P & ID (Piping & Instrument Diagram)
A. PEMERIKSAAN KESELAMATAN KERJA - Safety valve document
KATUP PENGAMAN - Name plate
- Types of safety valve :
Pemeriksaan teknis katup pengaman meliputi : * Conventional
* Pilot
a. Penelaahan Dokumen * Balance
- P & ID (Piping & Instrument Diagram)
- Dokumen katup pengaman - Worthiness Certificate of Test Bench;
- Plat nama
- Tipe katup pengaman : - Indicator / pressure gauge calibration
* Konvensional record;
* Pilot - Cold diff test record calculation to stipulate
* Balance the real open pressure.

- Sertifikat kelayakan Penggunaan test b. Test Implementation


bench; - Open pressure test
- Rekaman Kalibrasi pressure gauge / - Leak test
indicator;
- Perhitungan rekanan uji cold diff untuk c. Test Result Record
menentukan tekanan buka nyata. The test result record (form) should be
completed based on the documents of safety
b. Pelaksanaan Pengujian valve, name plate data as well as test data as
- Uji tekanan buka evaluation material of the issue of the
- Uji bocor Worthiness of Equipment Operation
Certificate.
c. Rekaman Hasil Uji
Rekaman hasil uji diisi berdasarkan d. Sealing
dokumen katup pengaman, data plat nama The safety valve sealing should be carried out
serta data pengujian sebagai bahan evaluasi by the Mine Inspector on the safety valve
penerbitan Sertifikat Kelayakan Penggunaan regulator already tested with good results by
Peralatan. using the Migas (Directorate General of Oil
and Gas) Seal.

d. Penyegelan
Penyegelan katup pengaman dilakukan oleh
Pelaksana Inspeksi Tambang pada pengatur
WTCJ-02116 11
Decicion of the Director General of Petroleum and Gas No.84.K/38/DJM/1998
katup pengaman yang telah diuji dengan B. INSPECTION FOR OCCUPATIONAL
hasil baik dengan menggunakan Segel SAFETY OF THE PRESSURE VESSEL AND
Migas. THE LIKE

The Technical Inspection of the pressure vessel


and the like is distinguished into 3 (three) parts :

B. PEMERIKSAAN KESELAMATAN KERJA 1. Pressure vessel and the like which are new
BEJANA TEKAN DAN SEJENISNYA and / or will be installed.
2. Pressure vessel and the like which are
existing and / or have been installed.
Pemeriksaan Teknis bejana tekan dan sejenisnya 3. Pressure vessel and the like which have
dibedakan menjadi 3 (tiga) bagian : been repaired / altered / modified

1. Bejana tekan dan sejenisnya yang baru


dan atau akan dipasang. B.1. Technical inspection of the pressure vessel
2. Bejana tekan dan sejenisnya yang lama and the like which are new and / or will be
dan atau telah dipasang. installed.
3. Bejana tekan dan sejenisnya yang
mengalami reparasi / alterasi / a. Review of data comprising :
modifikasi.. - Pressure vessel calculation and
construction drawing;
B.1. Pemeriksaan teknis bejana dan sejenisnya - Specifications of the materials which
yang baru dan atau akan dipasang. will be used;
- Specifications on welding procedures
and procedure qualification record
a. Penelaahan data yang meliputi : (form) as well as performance
- Gambar konstruksi dan perhitungan qualification record (certificate) of the
bejana tekan; welder / welding operator;
- Spesifikasi material yang digunakan; - Procedures for non destruction test and
qualifications of its personnel;
- Spesifikasi prosedur las dan rekaman - Procedures for repairs;
kualifikasi prosedur serta catatan - Post weld heat treatment procedures (if
kualifikasi (sertifikat) unjuk kerja juru / required);
operator las; - Pressure test procedures.

- Prosedur uji tidak merusak dan b. Physical inspection comprising :


kualifikasi personilnya; - Verification of the manufacturer’s
- Prosedur reparasi quality control system;
- Prosedur perlakuan panas pasca las (bila - Identification of the materials which
disyaratkan); will be used;
- Prosedur uji tekan; - Vessel forming verification;
- Joint installation verification;
b. Pemeriksaan fisik yang meliputi : - Welding preparation verification;
- Verifikasi sistem pengendalian mutu - Inspection of the welding results as
pemanufaktur; well as verification of the non
- Identifikasi material yang akan destruction test results;
digunakan; - Vessel’s dimension measurement and
- Verifikasi pembentukan bejana; internal inspection;
- Verifikasi pemasangan sambungan; - Leak test and pressure test;
- Verfifikasi persiapan pengelasan; - Verification of the manufacturer’s form
- Pemeriksaan hasil las serta verifikasi and vessel’s name plate.
hasil uji tanpa merusak;

- Pengukuran dimensi bejana dan


WTCJ-02116 12
Decicion of the Director General of Petroleum and Gas No.84.K/38/DJM/1998
pemeriksaan internal; c. Pressure test
- Uji bocor dan uji tekan; - Calibration record inspection of the
- Verifikasi formulir pemanufaktur dan pressure gauge and pressure recorder
plat nama nejana. including the allowed range area for the
relevant pressure test where the
maximum reading scale of the relevant
equipment is 1.5 - 4 times test pressure.
c. Uji tekan - The pressure test is carried out by
- Pemeriksaan rekaman kalibrasi alat increasing the pressure step by step and
pengukur dan alat pencatat tekanan, is recorded by the pressure recording
termasuk daerah jangkau yang diijinkan device until reaching the test pressure
untuk tekanan uji yang bersangkutan, already stipulated, and then the pressure
dimana skala penunjukan maksimum is retained for minimum 2 (two) hours
peralatan termaksud 1,5 – 4 kali tekanan and after that, the pressure is released
uji. out step by step
- Uji tekan dilaksanakan dengan
menaikkan tekanan secara bertahap dan d. Reporting
dicatat dengan alat pencatat tekanan To prepare all the technical inspection
sampai tekanan uji yang telah ditentukan results in the form of documents to be
kemudian tekanan ditahan minimum 2 submitted to the Director of the
(dua) jam dan setelah itu tekanan Directorate of Petroleum and Gas Mining
dikeluarkan secara bertahap. Engineering as evaluation material for the
issue of the Worthiness of Equipment
Operation Certificate.
d. Pelaporan
Menyusun seluruh hasil pemeriksaan teknis B.2. Technical inspection of the pressure vessel
berbentuk dokumen untuk diserahkan ke and the like which are existing and / or have
Direktur Direktorat Teknik Pertambangan been installed.
Minyak dan Gas Bumi sebagai bahan a. Review of data comprising :
evaluasi untuk penerbitan Sertifikat - Worthiness of equipment operation
Penggunaan Peralatan. certificate of which the validity
period will be extended;
- History record of the vessel operation;
B.2. Pemeriksaan teknis bejana tekan dan - As built drawing of the vessel;
sejenisnya yang lama dan atau telah dipasang.
- Copy of the name plate or other hard
a. Penelaahan data yang meliputi : marks;
- Sertifikat kelayakan penggunaan - Safe work procedures to carry out the
peralatan yang akan diperpanjang masa inspection.
berlakunya;
- Catatan riwayat penggunaan bejana; b. Physical inspection comprising :
- Visual inspection of the vessel’s
- Gambar bangunan bejana (as built condition;
drawing) - Verification of the last measurement
- Salinan plat nama atau marka keras results of the vessel’s thickness
lainnya; carried out by the Company;
- Prosedur kerja aman melakukan - To measure the vessel’s thickness;
pemeriksaan - Non-destruction Test (if required);
- Verification of the calculation results of
b. Pemeriksaan fisik meliputui : the remaining vessel’s life.
- Pemeriksaan visual kondisi bejana;

- Verifikasi hasil pengukuran terakhir


tebal bejana yang dilakukan oleh
Perusahaan; c. Reporting
WTCJ-02116 13
Decicion of the Director General of Petroleum and Gas No.84.K/38/DJM/1998
- Melakukan pengukuran tebal bejana; To prepare all the technical inspection
- Uji tidak merusak (bila diperlukan); results in the form of documents to be
- Verifikasi hasil perhitungn sisa umur submitted to the Director of the
bejana. Directorate of Oil and Gas Mining
Engineering as evaluation material for the
issue of the Worthiness of Equipment
Operation Certificate.
c. Pelaporan
Menyusun seluruh hasil pemeriksaan teknis B.3. Technical inspection of the pressure vessel and
berbentuk dokumen untuk diserahkan ke the like which have been repaired / altered /
Direktur Direktorat Teknik Pertambangan modified.
Minyak dan Gas Bumi sebagai bahan
evaluasi untuk menerbitkan Sertifikat a. Analysis of data comprising :
Kelayakan Penggunaan Peralatan. - Worthiness of equipment operation
certificate which will be issued, or of
which the validity period will be
B.3. Pemeriksaan teknis bejana tekan dan extended;
sejenisnya yang mengalami reparasi / - History record of the vessel operation;
alterasi / modifikasi. - As built drawing and construction of
the vessel;
a. Penelaahan data yang meliputi : - Copy of the name plate or other hard
- Sertifikasi Kelayakan Penggunaan marks;
Peralatan yang akan diterbitkan dan atau - Safe work procedures to carry out the
diperpanjang masa berlakunya; inspection.
- Procedures for repaird / alteration /
- Catatan riwayat penggunaan bejana modification;
- Gambar bangunan dan konstruksi - Calculation of repairs / alteration /
bejana; modification;
- Salinan plat nama atau marka keras - Specifications of the substitute
lainnya; materials;
- Prosedur kerja aman melakukan - Specifications on welding procedures
pemeriksaan; and procedure qualification record as
- Prosedur reparasi / alterasi / modifikasi; well as performance qualification
record (certificate) of the welder /
- perhitungan reparasi / alterasi / welding operator;
modifikasi; - Procedures for non destructive test and
- Spesifikasi material bahan pengganti; qualifications of its personnel;
- Post weld heat treatment procedures (if
- Spesifikasi prosedur las dan rekaman required).
kualifikasi prosedur serta catatan
kualifikasi (sertifikat) unjuk kerja juru / b. Physical inspection comprising :
operator las; - Verification of the manufacturer’s
quality control system;
- Prosedur uji tidak merusak dan - Identification of the materials which
kualifikasi personilnya; will be used;
- Prosedur perlakuan panas pasca las (bila - Vessel forming verification;
dsyaratkan). - Joint installation verification;
- Welding preparation verification;
b. Pemeriksaan fisik meliputui : - Inspection of the welding results as well
- Verifikasi sistem pengendalian mutu as verification of the non destructive
pemanufaktir; test;
- Identifikasi material yang akan - Vessel’s dimension measurement;
digunakan; - Leak test and pressure test (if required);
- Verifikasi pembentukan bejana;
- Verifikasi pemasangan sambungan; - Verification of the manufacturer’s form
WTCJ-02116 14
Decicion of the Director General of Petroleum and Gas No.84.K/38/DJM/1998
- Verifikasi persiapan pengelasan; and vessel’s name plate;
- Pemeriksaan hasil las serta verifikasi uji - Verification of the measurement results
tanpa merusak; of the vessel’s thickness carried out by
the Company;
- Pengukuran dimensi bejana; - To measure the vessel’s thickness;
- Uji bocor dan uji tekan (bila diperlukan) - Verification of the calculation results of
the remaining vessel’s life.
- Verifikasi formulir pemanufaktur dan
plat nama bejana; c. Reporting
- Verifikasi hasil pengukuran tebal bejana To prepare all the technical inspection
yang dilakukan oleh Perusahaan; results in the form of documents to be
- Melakukan pengukuran tebal bejana submitted to the Director of the Directorate
- Verifikasi hasil perhitungan sisa umur of Oil and Gas Mining Engineering as
bejana evaluation material for the issue of the
Worthiness of Equipment Operation
Certificate.
c. Pelaporan
Menyusun seluruh hasil teknis berbentuk C. INSPECTION FOR OCCUPATIONAL
dokumen untuk diserahkan ke Direktur SAFETY OF THE LIFTING EQUIPMENT
Direktorat Teknik Pertambangan Minyak /CRANE
dan Gas Bumi sebagai bahan evaluasi
untuk penerbitkan Sertifikat Kelayakan The technical inspection of the lifting equipment
Penggunaan Peralatan. consists of :
a. Review of Documents
 Design specifications and load table
C. PEMERIKSAAN KESELAMATAN KERJA  Design calculation
PESAWAT ANGKAT  Design drawing
 Materials used
 Specifications of joint
Pemeriksaan teknis pesawat angkat meliputi :  Source of energy used
 Operating Manual
a. Penelaahan Dokumen
 Spesifikasi perencanaan dan tabel b. Physical Inspection
beban
 Inspection of joints
 Perhitungan perencanaan
 Inspection of load holding hook
 Gambar perencanaan
 Inspection of moving as well as rotating
 Material yang digunakan parts
 Spesifikasi sambungan  Inspection of hydraulic / pneumatic system
 Sumber tenaga yang digunakan  Inspection of the condition of wire rope
 Petunjuk operasi (Operasi Manual) including knot band and number of
windings
b. Pemeriksaan fisik  Verification of functions of the indicators
 Pemeriksaan sambungan-sambungan  Verification of the boom’s dimension
 Pemeriksaan kait pemegang beban  Verification of counter weight
 Pemeriksaan bagian yang bergerak  Test preparation inspection
serta berputar - Test location preparation
 Pemeriksaan sistem hidrolik / - Test procedures
pneumatik - Preparation of Test equipment among
 Pemeriksaan kondisi tali baja (wire others :
rope) termasuk ikatan simpul dan jumlah - Load cell / measuring device
lilitan - Test load
- Other measuring devices
 Verifikasi fungsi indikator-indikator  Operator already having qualifications
 Verifikasi dimensi boom c. Test implementation
WTCJ-02116 15
Decicion of the Director General of Petroleum and Gas No.84.K/38/DJM/1998
 Verifikasi counter weight  Functional test with no load
 Pemeriksaan persiapan pengujian  Load test under load test procedures already
- Persiapan tempat pengujian ratified by the Director
- Prosedur pengujian
- Persiapan alat uji antara lain : d. Inspection after test
Inspection of all loaded and rotating or
-Alat ukur beban (load cell) stationary parts to find out the possibility of
-Beban uji any deformation, crack, lessen in bolts and / or
-Alat-alat ukur lainnya other defects.
 Operator yang sudah berkualifikasi
c. Pelaksanaan pengujian
 Uji fungsi tanpa beban e. Special inspection
 Uji beban dengan prosedur uji beban - If the lifting equipment is damaged or its
yang telah mendapat pengesahan Direktur ability is doubted.
- If principal repairs or alterations are made
d. Pemeriksaan setelah pengujian on the lifting equipment.
Pemeriksaan atas seluruh bagian-baigan yang
terbebani dan bergerak ataupun yang diam f. Test result form
untuk mengetahui kemungkinan adanya The test result form should be completed based
deformasi, retak, longgar pada baut dan atau on the lifting equipment data and test results.
cacat-cacat lainnya.
g. Reporting
e. Pemeriksaan khusus To prepare all the technical inspection results
- Apabila pesawat angkat mengalami in the form of documents to be submitted to
kerusakan atau diragukan kemampuannya. the Director of the Directorate of Oil and Gas
- Apabila diadakan perbaikan atau Mining Engineering as evaluation material for
perubahan prinsipil pada pesawat angkat. the issue of the Worthiness of Equipment
Operation Certificate.
f. Rekaman hasil uji
Rekaman hasil uji diisi berdasarkan atas data D. INSPECTION FOR OCCUPATIONAL
pesawat angkat dan hasil uji. SAFETY OF THE PUMP UNIT,
COMPRESSOR UNIT AND THEIR DRIVE

g. Pelaporan The technical inspection of the pump unit,


Menyusun seluruh hasil pemeriksaan teknis compressor unit and their drive includes :
berbentuk dokumen untuk diserahkan ke
Direktur Direktorat Teknik Pertambangan a. Evaluation of the design of the Pump Unit,
Minyak dan Gas Bumi sebagai bahan evaluasi Compressor Unit and their drive by performing
untuk penerbitkan Sertifikat Kelayakan a data analysis of :
Penggunaan Peralatan. - Design specifications;
- Design calculation and drawing;
D. PEMERIKSAAN KESELAMATAN KERJA - Specifications of the materials used;
UNIT POMPA, UNIT KOMPRESOR DAN - Specifications of the joints used;
PENGGERAKNYA. - Specifications of the main and supporting
components as well as safety appliances
Pemeriksaan teknis unit pompa, unit kompresor used;
dan penggeraknya meliputi : - Their operating and maintenance Manuals.

a. Penilaian terhadap rancang bangun unit


Pompa, unit Kompresor dan penggeraknya b. Evaluation of fabrication by making an analysis
dengan melaksanakan penelaahan data : of the report on inspection carried out by the
- Spesifikasi perencanaan; independent third party in the manufacturer’s
- Gambar dan perhitungan perencanaan; factory consisting among others of :
- Spesifikasi material yang digunakan; -Identification of materials
-Verification of instrument pipes
WTCJ-02116 16
Decicion of the Director General of Petroleum and Gas No.84.K/38/DJM/1998
- Spesifikasi sambungan yang digunakan; -Verification of the test of main components
- Spesifikasi komponen utama dan
pendukung serta piranti pengaman yang -Balance test results
digunakan; -Alignment inspection results of the coupling
- Pedoman pengoperasian dan and shaft of the pump / compressor with
pemeliharaannya. their drive;
-Results of the factory acceptance test already
b. Penilaian fabrikasi dengan melaksanakan carried out in the manufacturer’s factory;
penelaahan laporan inspeksi yang dilakukan -Inspection of the driving system.
oleh Pihak Ketiga yang independen di pabrik
pembuat yang terdiri dari antara lain :
- Identifikasi material c. Physical inspection, that is an inspection
- Verifikasi pipa-pipa instrumen following the installation process of the Pump
- Verifikasi pengujian komponen-komponen unit / Compressor unit with their drive in the
utama; installation location by performing :
- Hasil uji balans - Identification of equipment and
- Hasil pemeriksaan kelurusan (alignment) components;
kopling dan poros pompa/kompresor - Inspection of the foundation structure’s
dengan penggeraknya; condition
- Hasil “factory acceptance test” yang telah - Inspection for completeness of the
dilakukan dipabrik pembuat; measuring device and safety appliances
- General inspection of the installation
- Pemeriksaan terhadap sistem condition of the Pump unit / Compressor
penggeraknya. unit with their drive;
- Mechanical, electrical and instrument test;
c. Pemeriksaan fisik, yaitu pemeriksaan - Safety device trial test
mengikuti proes pemasangan unit Pompa / unit - Inspection of the start up implementation
Kompresor dengan penggeraknya dilokasi - Performance test.
pemasangan dengan melakukan :
- Identifikasi peralatan dan komponen; d. Reporting
To prepare (compile) all the technical
- Pemeriksaan kondisi struktur pondasi inspection results in the form of documents to
be submitted to the Director of the Directorate
- Pemeriksaan kelengkapan alat ukur dan of Petroleum and Gas Mining Engineering as
piranti pengaman; evaluation material for the issue of the
- Pemeriksaan umum kondisi pemasangan Worthiness of Equipment Operation Certificate.
unit Pompa / unit Kompresor dan
penggeraknya; E. INSPECTION FOR OCCUPATIONAL
- Uji mekanikal, kelistrikan dan instrumen; SAFETY OF THE PIPELINE.
- Uji coba piranti pengaman
- Pemeriksaan pelaksanaan “start – up”; The technical inspection of the pipeline includes :
- Uji kemampuan. a. Review of Documents
- General
d. Pelaporan  Location
Menyusun seluruh hasil teknis berbentuk  Construction completion schedule
dokcumen untuk untuk diserahkan ke Direktur  Design specifications
Direktorat Teknik Pertambangan Minyak dan  Specifications on welding procedures
Gas Bumi sebagai bahan evaluasi untuk and qualification record of procedures
penerbitan Sertifikat Kelayakan Penggunaan as well as performance qualification
Peralatan. certificate of the welder / welding
operator
E. PEMERIKSAAN KESELAMATAN KERJA  Procedures for repairs
PIPA PENYALUR  Specifications of the materials used
 Procedures for operation and
Pemeriksaan teknis pipa penyalur meliputi :
WTCJ-02116 17
Decicion of the Director General of Petroleum and Gas No.84.K/38/DJM/1998
a. Penelaahan Dokumen maintenance
- Umum  Cleaning and drying procedures
 Lokasi  Safety device data
 Jadwal penyelesaian pembangunan
 Spesifikasi perencanaan - Design
 Spesifikasi prosedur las dan rekaman  Review of the pipeline route map, i.e :
kualifikasi prosedur serta catatan
kualifikasi (sertifikat) unjuk kerja juru / * Depth of the max. and min. pipeline
operator las location (especially offshore
pipeline)
 Prosedur reparasi * Slope angle
 Spesifikasi material yang digunakan * Depth of ditches
 Prosedur pengoperasian dan * Maximum range distance supported
pemeliharaan
* Right of Way (ROW).
 Prosedur pembersihan dan
pengeringan  Review of the pipe curving method in
 Data piranti pengaman. the location consisting of :
* Diameter of the pipe
- Rancang bangun * Thickness of the pipe
 Penelaahan peta jalur bentang pipa * Curving radius of the pipe
penyalur antara lain :
* Kedalaman letak pipa penyalur  Review of the pipeline’s load
maksimum dan minimum (khusus pipa * Operational load i.e own weight,
penyalur lepas pantai) internal and external pressure, heat
* Sudut kemiringan expansion, floating capacity etc
* Kedalaman perparitan * Surrounding load i.e wave, current,
* Jarak bentangan maksimum yang wind, earthquake, etc.
tersangga * Installation load i.e buckling, residual
* Right of Way (ROW). stress taking place at the time of the
pipe installation
 Penelaahan metode pelengkungan
pipa di lokasi meliputi :  Review of the pipeline’s strength
* Diameter pipa calculation, i.e :
* Ketebalan pipa *Tension taking place on the pipeline,
* Radius lengkung pipa buckling on bottom stability
(especially offshore pipeline)
 Penelaahan beban pipa penyalur * Calculation of the pipeline’s support
* Beban operasi antara lain berat sendiri, * Calculation of the test pressure which
tekanan internal dan eksternal, ekspansi will be carried out
panas, daya apung dan lain-lain.
*Beban lingkungan antara lain gelombang,  Review of the corrosion control
arus, angin, gempa dan lain-lain. calculation, i.e :
* Beban pemasangan antara lain buckling, * Characteristics of corrosion
residual stress yang terjadi saat instalasi * Corrosion control method
pipa. *Coating specifications and dimensions
* Corrosion control requirement
 Penelaahan perhitungan kekuatan
pipa penyalur antara lain :
* Tegangan yang terjadi pada pipa  Review of the related specifications and
penyalur, buckling on buttom stability instrumentation system, i.e :
(khusus pipa penyalur lepas pantai) * Related pipe systems such as riser, pig
* Perhitungan penyangga pipa penyalur launcher, pig receiver, metering
*Perhitungan tekanan uji yang akan system etc
WTCJ-02116 18
Decicion of the Director General of Petroleum and Gas No.84.K/38/DJM/1998
dilakukan * Reinforcing station
* Instrumentation system such as
 Penelaahan perhitungan pengendalian emergency shut-down system, safety
korosi antara lain : valve etc
* Karakteristik korosi * Maximum range distance supported
* Metode pengendalian korosi
* Spesifikasi dan dimensi coating
* Kebutuhan pengendalian korosi yang  Review of the approval letter or
diperlukan recommendation from the competent
authorities for the environmental
 Penelaahan pada spesifikasi terkait protection monitoring and treatment
dan sitem intrumentasi antara lain : program.
* Sistem pipa terkait seperti riser, pig
launcher, pig receiver, sistem - Review of the operational plan data
metering dan lain-lain  Use (service)
* Stasiun penguat  Specific gravity
* Sistem instrumentasi seperti sistem  Normal pressure input
penghentian darurat, katup pengaman,  Normal pressure output
dan lain-lain  Maximum operation pressure
* Jarak bentangan maksimum yang  Operation temperature
tersangga  Operation flow rate
 Penelaahan surat persetujuan atau b. Physical Inspection :
rekomendasi dari instansi yang berwenang - Identification of the materials used;
untuk program pengolahan dan - Inspection of the pipeline route location to
pemantauan lindungan lingkungan . ascertain the area classification, type of
construction and safe distance available;
- Inspection of the welding arrangements and
- Penelaahan data rencana operasi similarity of shafts as well as alignment of
 Penggunaan (service) the pipe joints;
 Specific grafity - Inspection of the support system and
 Tekanan normal masuk ditches;
 Tekanan normal keluar - Review of the non destructive test results;
 Tekanan operasi maksimum - Condition and record of the test results of
 Temperatur operasi corrosion control system and pipe weight
 Laju aliran operasi (especially offshore pipeline);
- Inspection of the cleaning and drying
b. Pemeriksaan Fisik : implementation in the pipeline;
- Identifikasi material yang digunakan; - Inspection for completeness of the safety
- Pemeriksaan lokasi jalur pipa penyalur devices.
untuk memastikan klasifikasi area, tipe
konstruksi dan jarak aman yang tersedia; c. Inspection of the pressure test implementation,
- Pemeriksaan persiapan pengelasan dan Inspection for completeness of the test
kesamaan sumbu serta kelurusan equipment consisting of :
sambungan pipa;
- Pemeriksaan sistem penyangga dan -Dead weight tester (DWT)
perparitan; -Pressure gauge
- Penelaahan hasil uji tidak merusak; -Temperature gauge
- Kondisi dan rekaman hasil uji sistem -Pressure recorder
pengendalian korosi serta pemberat pipa -Temperature recorder
(khusus pipa penyalur lepas pantai); -Pump
- Pemeriksaan pelaksanaan pembersihan dan
pengeringan dalam pipa penyalur; Those gauges and recorders shall be calibrated
- Pemeriksaan kelengkapan piranti before being employed and the maximum
WTCJ-02116 19
Decicion of the Director General of Petroleum and Gas No.84.K/38/DJM/1998
pengaman. reading scale shall be 1.5 - 4 times test pressure.

c. Pemeriksaan pelaksanaan uji tekan.


Kelengkapan peralatan uji yang terdiri dari : d. Pressure Test
The pressure test is carried out by increasing the
pressure in phases until reaching the test
- Dead weight tester (DWT) pressure, and is retained for minimum 24
- Pengukur tekanan (twenty four) hours for the onshore pipeline,
- Pengukur temperatur minimum 8 (eight) hours for the offshore
- Pencatat tekanan (pressure recorder) pipeline and minimum 2 (two) hours for the
- Pencatata temperatur (temperatur recorder) geothermal pipeline.
- Pompa
e. Reporting
Alat pengukur dan pencatat tersebut harus To prepare (compile) all the technical
dikalibrasi sebelum digunakan, dan skala inspection results in the form of documents to
penunjukkan maksimumnya adalah 1,5 – 4 kali be submitted to the Director of the Directorate
tekanan uji. of Petroleum and Gas Mining Engineering as
evaluation material for the issue of the
d. Uji tekan Worthiness of Equipment Operation Certificate.
Uji tekan dilaksanakan dengan menaikkan
tekanan secara bertahap sampai dengan F. INSPECTION FOR OCCUPATIONAL
tekanan uji dan ditahan minimum selama 24 SAFETY OF THE POWER GENERATOR
(dua puluh empat) jam untuk pipa penyalur di UNIT, TRANSFORMER UNIT, SWITCH
darat, minimum 8 (delapan) jam untuk pipa GEAR UNIT AND MOTOR CONTROL
penyalur di lepas pantai dan minimum 2 (dua) CENTER UNIT
jam untuk pipa penyalur uap panasbumi.
The technical inspection of the electrical
e. Pelaporan equipment consists of :
Menyusun seluruh hasil teknis berbentuk a. Review of Documents
dokcumen untuk untuk diserahkan ke Direktur  Standard applied;
Direktorat Teknik Pertambangan Minyak dan  Specifications of the electrical equipment
Gas Bumi sebagai bahan evaluasi untuk unit / data sheet (Generator, Transformer,
penerbitan Sertifikat Kelayakan Penggunaan Switch Gear and Motor Control Center);
Peralatan.  Design drawing;
 Construction & design specifications;
PEMERIKSAAN KESELAMATAN KERJA UNIT  Specifications of materials;
POWER GENERATOR, UNIT TRANSFORMER,  Design calculation (if required);
UNIT SWITCHERGEAR DAN UNIT MOTOR
CONTROL CENTER
 Procedures for operation & maintenance;
 Area classification;
Pemeriksaan teknis peralatan listrik meliputi :  Safety applieances;
 Insulation grade.
a. Penelaahan Dokumen
 Standar yang digunakan; b. The physical inspection comprises :
 Spesifikasi unit peralatan listrik / data  Inspection of equipment and its components
sheet (Generator, Transformer, Switchgear  Name plate verification
dan Motor Control Center);  General inspection of the installation
 Gambar perencanaan; condition in the location
 Spesifikasi perencanaan & konstruksi  Inspection of the equipment layout and area
 Spesifikasi material; classification
 Perhitungan perencanaan (bila  Inspection of control panel
disyaratkan);  Inspection of main wire terminal and
 Prosedur pengoperasian & pemeliharaan; neutralization

WTCJ-02116 20
Decicion of the Director General of Petroleum and Gas No.84.K/38/DJM/1998
 Klasifikasi area; c. The tests consist of :
 Piranti pengaman;  Insulation resistance test
 Klas isolasi  Control panel test
 Wire Hi-pot test
b. Pemeriksaan fisik meliputi :  Safety relay setting
 Pemeriksaan peralatan dan komponennya  Synchronization test
 Automatic start test of the emergency unit
 Verifikasi plat nama  Test with no load and with load
 Pemeriksaan umum kondisi pemasangan di  Acceptance evaluation (test value)
lokasi  Pre-commissioning and commissioning
 Pemeriksaan lay out peralatan dan area
klasifikasi d. Reporting
 Pemeriksaan panel kendali To prepare all the technical inspection results
 Pemeriksaaan terminal kabel utama dan in the form of documents to be submitted to
penetralan the Director of the Directorate of Oil and Gas
Mining Engineering as evaluation material for
c. Pengujian meliputi : the issue of the Worthiness of Equipment
 Pengujian ketahanan isolasi Operation Certificate.
 Pengujian panel kendali
 Pengujian Hi-pot kabel
 Setting relay pengaman Stipulated in Jakarta
 Pengujian sinkronisasi On 19th August 1998
 Pengujian automatic start unit emergency The Director General of Oil and Gas
 Pengujian tanpa beban dan dengan beban
 Penilaian penerimaan (test value)
 Pre-commissioning dan commissioning
Soepraptono Soeleiman
d. Pelaporan
Menyusun seluruh hasil teknis berbentuk
dokcumen untuk untuk diserahkan ke Direktur
Direktorat Teknik Pertambangan Minyak dan
Gas Bumi sebagai bahan evaluasi untuk
penerbitan Sertifikat Kelayakan Penggunaan
Peralatan.

Ditetapkan di Jakarta
Pada tanggal, 19 Agustus 1998
Direktur Jenderal Minyak dan Gas Bumi

Soepraptono Soeleiman

WTCJ-02116 21
Decicion of the Director General of Petroleum and Gas No.84.K/38/DJM/1998
Translated from Bahasa Indonesia into English by Catharina Chiandra
Sworn & Authorized Translator by Decree No. 1715 Th. 2000 of the Governor of DKI Jakarta
Jakarta, 12 April 2002

WTCJ-02116 22