Claris Lifesciences Ltd.

mySAP ERP ECC 6.0 Implementation

PP –PI Configuration Documentation

Configuration Document SAP PP-PI Page 1 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 1/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

Table Of Contents

1.  PURPOSE OF THE DOCUMENT............................................................................................................ 5 


1.1  Purpose ................................................................................................................................................ 5 

2.  PRODUCTION PLANNING...................................................................................................................... 6 

2.1   Define MRP Controller........................................................................................................................ 6  


2.2   MRP Type ............................................................................................................................................ 7  
2.3   Lot Size................................................................................................................................................. 8  
2.4   Defining MRP Groups ......................................................................................................................... 9 
2.5   Defining Special Procurement Type ...................................................................................................10 
2.6    Define Scope of Planning for Total Planning .....................................................................................11 
2.7   Scheduling Parameters .......................................................................................................................12 
2.9   Define Scheduling Margin key............................................................................................................13  
2.10  Selection ID for BOM .........................................................................................................................14 

2.11   Defining BOM Explosion ....................................................................................................................15  


2.12   Define Number Ranges for Planned Independent Requirements ........................................................16  
2.13   Define Version Numbers .....................................................................................................................16  
2.14   Defining Strategy for MRP .................................................................................................................18  
2.15   Define Strategy Group ........................................................................................................................18  
2.16    Define Planning Horizon ....................................................................................................................19  
2.17    Defining Availability of Stock .............................................................................................................20 
2.18    Defining Rescheduling Check for Plant and MRP Group...................................................................21 
2.19   Define Number ranges for Planning Run............................................................................................22  
2.20  Planning File Entry for Termination ..................................................................................................23  
2.21   Maintain Rounding Profile .................................................................................................................24  
2.22   Define Storage location MRP per plant..............................................................................................25  
2.23   Defining Parallel Processing for MRP ...............................................................................................26  
2.24   Assigning MRP Checking Rule ...........................................................................................................27  
2.25   BOM Usage.........................................................................................................................................28  
2.26    Defining Item Categories ....................................................................................................................29  
2.27    Define Reasons for Variances.............................................................................................................29  
2.28    Define Number ranges for Manual Processing...................................................................................30  
2.29   Activating Requirements Planning......................................................................................................31  
2.30   Defining Item Numbers of Order Types..............................................................................................32 
2.31   Defining Conversion Planned Order to Process Order......................................................................33  

3.  PRODUCTION PLANNING FOR PROCESS INDUSTRIES...............................................................35  


3.1   Define Resource Category ..................................................................................................................35  
3.2   Defining Person Responsible for Work Centre ...................................................................................36  
3.3  Standard Value Keys...........................................................................................................................37  
3.4   Defining Formula Parameters for Resources .....................................................................................38  

Configuration Document SAP PP-PI Page 2 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 2/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

3.5   Defining Formula for Resources.........................................................................................................39 


3.6   Task List Usage...................................................................................................................................40 
3.7    Define Capacity Planner.....................................................................................................................41 
3.8    Define Number Ranges for Master Recipe..........................................................................................42  
3.9   Recipe Status.......................................................................................................................................43 
3.10   Recipe Usages.....................................................................................................................................43  
3.11   Define Planner Groups .......................................................................................................................44 
3.12  Control key for Master Recipe ............................................................................................................44 
3.13   Define Capacity Categories................................................................................................................45  
3.14   BOM Status .........................................................................................................................................46  
3.15  Process Order Type ............................................................................................................................47  
3.16    Number Ranges for Process Order.....................................................................................................47  
3.17    Define Production Scheduler..............................................................................................................48  
3.18    Define Production Scheduler Profile..................................................................................................49 

3.19  Scope of Check....................................................................................................................................50 


3.20   Define Checking Control ....................................................................................................................51  
3.21   Define Scheduling parameters for a process order.............................................................................52 
3.22   Defining Parameters for Order Confirmation ....................................................................................53 
3.23   Assigning Material Types to Task List................................................................................................54 
3.24   Define Material Types Allowed for BOM Header...............................................................................55  
3.25   Defining Order Type-Dependent Parameters.....................................................................................56  
3.26    Assigning Process Instructions to Control Recipe Destinations.........................................................57  

4.  BATCH MANAGEMENT.........................................................................................................................59 

4.1   Activate Document Management for Batches .....................................................................................59 


4.2   Defining Batch Level...........................................................................................................................59 
4.3   Activating Automatic Batch Number Assignment ...............................................................................59 
4.4   Maintain Internal Batch Number Assignment Range..........................................................................60 
4.5   Define Batch Creation for Production Order / Process Order...........................................................60 
4.6    Define Process Order Condition Tables.............................................................................................61 
4.7    Define Process Order Access Sequences ............................................................................................61 
4.8    Assign Search Procedure to Process Order and Activate Check........................................................62 
4.9   Activating batch-specific Unit of Measures ........................................................................................63  

4.10   Edit Batch-Specific Material Unit of Measure....................................................................................63  


4.11   Define Calculation of Proportion Quantity from Base Quantity ........................................................64 
4.12   Maintain Period Indicator ..................................................................................................................64  
4.13   Activating Expiration Date View per Plant.........................................................................................65  
4.14   Define Process Order Strategy Types.................................................................................................65 
4.15   Define Search Procedure to Process Order........................................................................................66  
4.16    Activating Batch Derivation................................................................................................................67  

Configuration Document SAP PP-PI Page 3 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 3/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

4.17    Define Derivation Events ....................................................................................................................67  

5.  DOCUMENT MANAGEMENT ...............................................................................................................68 


5.1   Define Number Ranges for Document Numbers.................................................................................68  
5.2   Define Document Types ......................................................................................................................69 
5.3   Define Data Carrier............................................................................................................................70  

6.  CLASSIFICATION SYSTEM ..................................................................................................................72  


6.1   Define Characteristics Groups ...........................................................................................................72 
6.2   Define Characteristics Status..............................................................................................................73 

7.  OTHER SETTINGS...................................................................................................................................74 


7.1  Check Units of Measurement ..............................................................................................................74 

Configuration Document SAP PP-PI Page 4 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 4/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

1.  PURPOSE OF THE DOCUMENT

1.1  Purpose
This document captures the required configurations details in SAP system to meet the business
requirements as envisaged in the Design Stage (Business Blue Print Stage) for Project, Claris SAP
Implementation Production Planning Module. The configuration steps have mappings to
corresponding menu path to where the configuration has been done in the IMG (Implementation
Guide).

The documentation provides visibility to all project teams members on the proposed system settings
and changes. It is an important document for all future references in terms of system configuration. All
future changes or updates to the system should be done based on this and the documentation updated
accordingly.

This volume contains details on the configuration requirements for the Production Planning module
for Claris Life Sciences pertaining to Master Data

This document should be read in conjunction with:

1. Process definition document

2. Key Data Structures

Configuration Document SAP PP-PI Page 5 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 5/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

2.  PRODUCTION PLANNING

2.1  Define MRP Controller

 Implementation Guide for R/3 Customizing (IMG) →  Production → Material


Menu Path  Requirements Planning →  Planning → Check MRP Types Out Overall
 Maintenance of Plant Parameters→ MRP Controller 
Transaction Code OPPQ 
Configuration The MRP controller is a person or a group of persons responsible for monitoring
Description material availability. MRP controller can be used to select the planning results
per MRP controller.
Every material that is relevant to the planning run must be assigned to an MRP
controller in the material master record.

For all the C&F’s and CA’s agents treated as Plants, the MRP Controller
would be Z01. For Manufacturing Plants, it is detailed below. For all other

plants, 001 MRP controller is named as “General”

Plant MRP Controller Description


1001 101 RM Injectables
102 PPM Injectables
103 SPM Injectables
104 TPM Injectables
105 Production Inj.
106 Packing Inj.
107 Engineering Inj.
108 Lab Mat.Injectable
109 HK & Admin
110 Captive Consumptn
1002 101 RM Infusion
102 PPM Infusion
103 SPM Infusion
104 TPM Infusion
105 Production Inf.
106 Packing Inf.
107 Engineering Inf.
108 Lab Mat.Infusion
109 HK & Admin
110 Captive Consumptn
1003 101 RM API
102 PPM API
103 SPM API
104 TPM API
105 Production API
106 Packing API
107 Engineering API
108 Lab Mat. API
109 HK & Admin
1004 101 Utility for Clarion

Configuration Document SAP PP-PI Page 6 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 6/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

2.2  MRP Type

 Implementation Guide for R/3 Customizing (IMG) →  Production → Material


Menu Path  Requirements Planning → Master Data → Check MRP Types 
Transaction Code SPRO
Configuration MRP type to assign the procedure to be used to plan a material and to control,
Description which MRP parameters can be, maintained for the material in the material
master record. MRP type is assigned in the material master record
The following MRP Types are used for Claris

MRP type Description


PD Normal MRP
VB Manual Reorder Level Planning
ND No Planning
V1 Manual Reorder Level with External Requirements.
M0 Master Production Scheduling

Configuration Document SAP PP-PI Page 7 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 7/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

2.3  Lot Size

 Implementation Guide for R/3 Customizing (IMG) →  Production →  Material


Menu Path  Requirements Planning →   Planning →  Lot-Size Calculation→  Check Lot-
Sizing procedure 
Transaction Code OMI4
Configuration Lot-sizing procedures serve to calculate the procurement quantities, that is, the
Description purchase order and production quantities
With the lot-sizing procedure we define how the order quantities are determined.
A lot size defining the lot-sizing procedure is assigned to every material master
record applicable to materials planning. The lot size is defined in Customizing
by the combination of the lot-sizing procedure and the lot-sizing indicator.

Lot Size Key Description


EX Lot for Lot Order Quantity
FX Fixed Order Quantity
WB Weekly Lot Size
MB Montly Lot Size

Configuration Document SAP PP-PI Page 8 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 8/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

2.4  Defining MRP Groups

 Implementation Guide for R/3 Customizing (IMG) →  Production →  


Menu Path  Materials Requirements Planning →  MRP Groups →  Carry Out Overall
 Maintenance of MRP Groups 
Transaction Code OPPR 
Configuration In this step, we determine the MRP groups and we maintain the control
Description parameters from a particular point of view. The MRP group groups certain
materials together from the material requirements planning point of view to
allocate them special control parameters for planning. These control
parameters include the strategy group, the planning horizon and the
creation indicator for the planning run selection of the Process Order type
automatically.

MRP
Plant Description
Group
1001 1001 Demand for Domestic in
Injectable
1002 Demand for Exports in
Injectable
1003 In-house Production in
Injectable
1004 In-house Packing in Injectable
1005 External Procurement
1002 1001 Demand for Domestic in
Infusion
1002 Demand for Exports in Infusion

Configuration Document SAP PP-PI Page 9 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 9/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

1003 In-house Production in Infusion


1004 In-house Packing in Infusion
1005 External Procurement
2000 2001 Traded Products
2002 Loan Licence

2.5  Defining Special Procurement Type

 Implementation Guide for R/3 Customizing (IMG) →  Production →  Material


Menu Path  Requirements Planning →  Master Data →  Define Special Procurement Type 
Transaction Code SPRO 

Configuration In this step, we define the special procurement keys which as well as the
Description procurement type control the procurement and storage of a material.

The special procurement type always refers to a procurement type.

We can , also define how the system treats the material as a component during
the BOM explosion using control indicators.

Example 1 (special procurement keys without other indicators)


The procurement type "external procurement" is defined for raw materials. If a
material is to be procured via a consignment order, you assign the special
procurement type "consignment" to the material in the material master record.

Example 2 (special procurement keys with other indicators)


A material appears in several BOMs as a component because it is assembled in
finished products in in-house production. It is procured from an alternative plant
if no dependent requirements exist for the material.

The Special Procurement Keys are defined for the Manufacturing Plants
and it has to be extended to the C&Fs, which are defined as plants
Plant Special Procurement Key Description
1001 ZB Stock transfer (Proc from 1002)
1001 ZC Stock transfer (Proc from 1003)
1002 ZA Stock transfer (Proc from 1001)
1002 ZC Stock transfer (Proc from 1003)
1003 ZA Stock transfer (Proc from 1001)
1003 ZB Stock transfer (Proc from 1002)
4500 ZD Stock transfer (Proc. From 4500)
WA
2000 Stock transfer (Proc. From 2000)

Configuration Document SAP PP-PI Page 10 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 10/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

2.6  Define Scope of Planning for Total Planning

 Implementation Guide for R/3 Customizing (IMG) →  Production→  Materials


Menu Path  Requirement Planning→  Planning→   Define Scope of Planning for total
 planning

Transaction Code OM0E


Configuration In this IMG activity, we define the scope of planning and the sequence of the
Description organizational units to be planned. These are either plants or, if we have
converted MRP to MRP at MRP area level, the MRP areas that we plan together
in a total planning run.
We enter the key for the planning run in the initial screen of the total planning
run. The total planning run then carries out MRP for the plants or MRP areas
defined in the scope of planning. we can enter as many plants or MRP areas as
we like in the scope of planning. We can also only enter one MRP area. MRP is
then only carried out for one MRP area. If we have activated MRP for MRP
areas, when we enter a plant, this includes all MRP areas of this plant.
The Following Scope of planning has been defined for Claris
Planning Scope Description
CFWH C & Fs and Wareshouse
MFG Mfg plants
MRP Material Requirement Planning

Configuration Document SAP PP-PI Page 11 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 11/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

2.7  Scheduling Parameters

 Implementation Guide for R/3 Customizing (IMG) →  Production→  Capacity


Menu Path  Requirements Planning →   Operations →  Scheduling →  Define scheduling
 parameters for planned orders 
Transaction Code OPU5 
Configuration In this step we define the parameters for scheduling planned orders for each
Description plant, order type and production scheduler. This comprises the following
settings:

Scheduling levels (detailed-, production-rate and rough-cut scheduling)


Date adjustment when deadlines are exceeded
Scheduling control for detailed scheduling
Reduction
Scheduling parameters for planning scenarios for long-term planning/simulation

Scheduling Parameters for the Planned Orders are same for all the Plants
as defined below:

Parameters Values
Detailed Scheduling 90
Horizon
Rough Cut 90
Scheduling Horizon
Scheduling Levels Via Detailed Scheduling
Adjust Dates Adjust basic dates, adjust dep reqmts to operation date
For Capacity Always basic dates, dep reqmts to operation dates
Scheduling

Scheduling type Backwards

Configuration Document SAP PP-PI Page 12 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 12/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

2.9  Define Scheduling Margin key

 Implementation Guide for R/3 Customizing (IMG) →  Production →  Shop Floor


Menu Path control →  Operations →  Scheduling →  Define Scheduling Margin key 
Transaction Code SPRO 
Configuration Scheduling margin key specify time floats for scheduling as well as the release
Description period for order release.
The following floats are defined:
Float before production: This is the time between the order start date and the
scheduled start date.
Float after production: This is the time between the order finish date and the
scheduled finish date.

The release date is calculated by adding the release period. The order release is
carried out on this date.
The opening period represents the number of workdays that are subtracted from
the order start date in order to determine the order creation date. The MRP
controller uses this time as a float for converting planned orders into process
orders.

The release period represents the number of workdays that are subtracted from
the order start date in order to determine the process order release. The release
period is only relevant for process order management.

Configuration Document SAP PP-PI Page 13 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 13/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

The following SMK are maintained for plants 1001, 1002 and 2000. For
C&Fs, C&As treated as plants, the SMK are 000

Plant SMK Opening per Float Before Prd Float After Prd Relea

1001 Z00 000 000 000


  Z01 001 000 000
  Z02 000 001 001
  Z03 000 001 002
  Z04 000 001 003
  Z05 000 001 004
1002 Z00 000 000 000
  Z01 001 000 000
  Z02 000 001 001
  Z03 000 001 002
  Z04 000 001 003
  Z05 000 001 004
2000 Z01 003 000 000
 

2.10  Selection ID for BOM

 Implementation Guide for R/3 Customizing (IMG) →  Production →  Material


Menu Path  Requirements Planning→ Planning →  BOM Explosion →  Define BOM
Selection 
Transaction Code SPRO
Configuration In this step, we specify the priority with which a BOM usage or routing usage is

Configuration Document SAP PP-PI Page 14 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 14/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

Description selected during the planning run. Here, a sequence is usually determined which
is used to select a valid BOM via the criterion "Usage".

For all the plants the selection id is set as 01

2.11  Defining BOM Explosion

 Implementation Guide for R/3 Customizing (IMG) →  Production →  Material


Menu Path  Requirements Planning→ Planning →  BOM Explosion →  Define BOM
 Explosion Control  
Transaction Code OMIW
Configuration In this step, we specify the priority with which a BOM usage or routing usage is
Description selected during the planning run. Here, a sequence is usually determined which
is used to select a valid BOM via the criterion "Usage".

For all the plants the “Control Parameters for BOM Explosion” has been
set as “ ” (BOM explosion number/order start date)

Configuration Document SAP PP-PI Page 15 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 15/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

2.12  Define Number Ranges for Planned Independent Requirements


 Implementation Guide for R/3 Customizing (IMG) →  Production →  Production
Menu Path Planning →  Demand Management →  →   Define number ranges for planned

independent requirements 
Transaction Code OMID
Configuration In demand management, number ranges are only used internally within the
Description system for counting per planned independent requirements item. The number of
the planned independent requirements is not displayed.

The Number Range is preset: 000000000001 to 9999999999999 

2.13  Define Version Numbers

 Implementation Guide for R/3 Customizing (IMG) → 


→   Production→ 
→   Production
Menu Path Planning → 
→   Demand Management → 
→   Planned Independent requirements→ →  

 Define Version Numbers 

Configuration Document SAP PP-PI Page 16 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 16/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

Transaction Code OMP2


Configuration In this step, we define versions to be able to:
Description   differentiate between different planned independent requirements
    indicate the transfer of requirements from previous planning levels (for
example, the sales plan from SOP)
    simulate requirements planning in long-term planning
We have maintained versions for all the twelve months of the year and for
requirement plan
Requirement Plan Description
01 January version
02 February version
03 March version
04 April version
05 May version
06 June version
07 July version
08 August version
09 September version
10 October version
11 November version
12 December version

Configuration Document SAP PP-PI Page 17 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 17/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

2.14  Defining Strategy for MRP

 Implementation Guide for R/3 Customizing (IMG) →  Production   Material


Menu Path  Requirements Planning  Master Data    Independents Requirements
Parameters   Planning Strategy   Define Strategy 
Transaction Code SPRO
Configuration The planning strategy represents a procedure to be used for planning a material.
Description It is defined by:
a requirements type from demand management, or
a requirements type from sales order maintenance, or
a combination of both that makes sense
The following strategy is being used

Strategy Description
10 Make to stock, used for Domestic Requirement PIR
11 Gross demand from C&F
40 Planning with final Assembly, used for International
Sales order

2.15  Define Strategy Group

 Implementation Guide for R/3 Customizing (IMG) →  Production   Material


Menu Path  Requirements Planning  Master Data    Independents Requirements
Parameters   Planning Strategy   Define Strategy Group 
Transaction Code SPRO
Configuration The planning strategy represents an appropriate procedure to be used for
Description planning and produced a material.

The Strategy Group available in standard SAP system will be used. To be


Specific the below mentioned strategy will be used in CLARIS 
For all the Non-repeat export products and domestic products with unique
Secondary packing material requirements, PM requirements the Strategy

Configuration Document SAP PP-PI Page 18 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 18/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

group will be maintained as 40, for other materials at Manufacturing plants


the strategy group will be maintained as 10, warehouse & at C&F’s
strategy group is 11 

Strategy Description
10 Make to stock, used for Domestic Requirement PIR
11 Gross demand from C&F
40 Planning with final Assembly, used for International
Sales order

2.16  Define Planning Horizon

 Implementation Guide for R/3 Customizing (IMG) →  Production   Material


Menu Path  Requirements Planning  Planning   MRP Calculation   Define Planning
 Horizon 
Transaction Code OMDX
Configuration The planning horizon is the period that is set for the "net change planning in the
Description planning horizon." For this type of net change planning, only those materials are
planned in the planning run that have a change relevant to MRP within the
period (in work days).

The length of the planning horizon should at least include the following:
Period in which customer orders enter
Delivery times
Complete material processing time

The Planning Horizon for all the Plants, C&Fs, C&As defined as Plants are
maintained as 135 Work Days (Current Month 45 days + 3 Months - 90

Configuration Document SAP PP-PI Page 19 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 19/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

Working days)

2.17  Defining Availability of Stock

 Implementation Guide for R/3 Customizing (IMG) →  Production →  Material


Menu Path  Requirements Planning → Planning →  MRP Calculation →  Stocks →  Define
 Availability of Stock in Transfer/Blocked Stock/Restricted Stock 
Transaction Code SPRO 
Configuration In this step, we define whether stock in transfer (plant to plant) and/or blocked
Description stock are included as well as restricted-use stock as available stock in the net
requirements calculation.
Stock in transfer is the quantity that has already been withdrawn from the issuing
plant (movement type, remove from storage - plant) but that has not yet been
received by the receiving plant (movement type, place in storage - plant)
The system treats this stock as stock in transfer (plant to plant) for the receiving
plant until the material is actually received and posted.

The Stocks, which will participate in the Net requirement Calculation, are
Unrestricted Stock and Stock in Transit for all the plants and C&F defined
as plants
For all the plants excepting clarion campus, Nourish, PKD, ICD and Head
Office, blocked stocks are not included in the MRP calculation for Stocks.

Configuration Document SAP PP-PI Page 20 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 20/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

2.18  Defining Rescheduling Check for Plant and MRP Group

 Implementation Guide for R/3 Customizing (IMG) →  Production →  Material


Menu Path  Requirements Planning →  Planning →  MRP Calculation →  Define
 Rescheduling Check 
Transaction Code OMDW 
Configuration The rescheduling period represents the period in which the system checks
Description whether the existing dates of the receipt elements that are no longer allowed to
be changed automatically still suit the requirements situation. If the dates of
these elements are no longer suitable, the system creates the following exception
messages depending on the requirements situation

The Rescheduling checks for all the Plants and depot are identical as
detailed below:

Parameters Value
Rescheduling horizon 100
Firm Planned Order Indicator Set
Production Order Indicator Set
Firm Purchase requisition Indicator Set
Order item/Sch line Indicator Set
QM inspection lot Indicator Set
Shipping notification Indicator Set

Configuration Document SAP PP-PI Page 21 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 21/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

2.19  Define Number ranges for Planning Run

 Implementation Guide for R/3 Customizing (IMG) →  Production→  Material


Menu Path  Requirements Planning →  Number Ranges →      Maintain Number Ranges for
 Planning Run 
Transaction Code OMI2 

Configuration In this step, we specify number ranges and intervals for the documents created
Description during the planning run. These documents include:
Planned orders for operative planning
Planned orders for long-term planning (simulative planning)
Dependent requirements and reservations
Purchase requisitions
MRP lists

The standard Number ranges would be used

Configuration Document SAP PP-PI Page 22 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 22/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

2.20  Planning File Entry for Termination

 Implementation Guide for R/3 Customizing (IMG) →  Production →  Material


Menu Path  Requirement Planning →  Planning →  MRP Calculation →  Define Error
 Processing in the Planning 
Transaction Code OMDY 
Configuration In this step, we specify how the system is to proceed if errors occur during the
Description planning run.
Maximum number of purchase order proposals per date. If we have selected a
fixed or maximum lot size, the number of purchase order proposals created
during the planning run is determined in lot sizing. If more purchase order
proposals are created during the planning run than the upper limit specified here,
the planning run is terminated for the material in question and a termination
message appears

For Plant 1001 & 1002 The maximum Number of proposals have been
defined as 999 and Sub MRP controller is 105. For all other plants this
value is to set for 50 and sub MRP controller is 001

Configuration Document SAP PP-PI Page 23 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 23/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

2.21  Maintain Rounding Profile

 Implementation Guide for R/3 Customizing (IMG) →  Production→  Materials


Menu Path  Requirement Planning→  Planning→  Lot-Size Calculation→  Maintain

OWD1  profiles 
Transaction Code  Rounding
Configuration In this IMG activity, we define the rounding profile in order to adapt
Description the units of measure in material requirements planning to the delivery and
transport units, for example, if purchase orders can only be delivered in bundles
of 10 pieces.
With the rounding profile, we can define settings for rounding up/down order
proposal quantities to deliverable quantities. There are two different types of
rounding profiles; one for the core application and a rounding profile for Retail
application:
· Statistical rounding profile for MRP in the standard system
· Dynamic rounding profile and quantity to be
added/subtracted profile for Retail functions
The statistical rounding profile for MRP is made up of:
· Level
· Threshold value
· Rounding value
We can define several combinations of threshold and rounding values for a
rounding profile. The individual combinations are then assigned a level.
The threshold value is the value from which the system rounds up to the next
deliverable quantity. If the threshold value is not reached, the system rounds the
quantity according to the next lower level. If the lowest level is not reached, then
the system rounds up to a multiple of the rounding value, if the requirements
quantity is larger than the threshold quantity. Otherwise, the requirements
quantity remains unchanged. The rounding value is the value to which the
system rounds the quantity if the threshold value is exceeded
The following Rounding profiles are maintained for Claris

Rounding Profile
 

Configuration Document SAP PP-PI Page 24 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 24/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

2.22  Define Storage location MRP per plant

 Implementation Guide for R/3 Customizing (IMG) →  Production→  Materials


Menu Path  Requirement Planning→ Planning →  Define Storage location MRP per plant 
Transaction Code SPRO 
Configuration In this step, we define the default values for storage location MRP (multi-plant).
Description The indicator that we set here is proposed when creating a material master record
for the storage locations maintained. If we have created a material for a storage
location in the material master, for which we have maintained a proposal value.
The following data is maintained for Claris

Configuration Document SAP PP-PI Page 25 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 25/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

2.23  Defining Parallel Processing for MRP

 Implementation Guide for R/3 Customizing (IMG) →  Production→  Materials


Menu Path  Requirement Planning→  Define Parallel Processing n MRP 
Transaction Code SPRO 

Configuration With the help of parallel processing procedures, we can significantly improve the
Description runtime of the total planning run. To process in parallel, we can either select
various sessions on the application server or various servers. The work package,
with a fixed number of materials that are internally defined in the program, is
distributed over the individual servers/sessions. Once a server/session has
finished processing a package, it starts processing the next package. If a low-
level code is being planned, the servers/sessions that have finished must wait
until the last server/session has finished its package to avoid inconsistencies.
Then the next low-level code is processed per packages. The parallel processing
procedure is switched on in the initial screen of total planning.
The destination of parallel processing is maintained as
CLSERDEV-CO_CDV_00

Configuration Document SAP PP-PI Page 26 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 26/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

2.24  Assigning MRP Checking Rule

 Implementation Guide for R/3 Customizing (IMG) →  Production →  Material


Menu Path  Requirements Planning →   Procurement Proposals →  Planned Orders →  Define

 Availability Check for Components 


Transaction Code OPPJ 
Configuration We control the availability check for requirements planning by defining the
Description checking group and the checking rule at plant level or per MRP group.
The availability check can be carried out in MRP for the dependent
requirements. This means that the availability check can directly check whether
sufficient material is available for the production of the assembly. The
availability check is initiated from planned order processing. It is not carried out
automatically in the planning run for each requirement of an assembly.

In the checking group, several checking rules are grouped together. Therefore,
we can define different checking rules for different business application areas
(sales and distribution, MRP, production orders, inventory management) or for
different business operations. If we require different checking rules for different
business operations, we can create several checking groups with the appropriate
checking rules or we can assign another checking rule using the MRP group. The
checking group is assigned to the material in the material master record, MRP 2
screen, in field "Availability check".
For all the manufacturing plant, the Check on the Material will be done
during the Creation and Release of the Process Order. If there is material
short falls No release will be carried out  
The following checking rules are defined

Checking Rule Order Type


Z1 Checking Rule for Order Type C001

Z2
Z3 Checking
Checking Rule
Rule for
for Order
Order Type
Type C002
C003
Z4 Checking Rule for Order Type C004
Z5 Checking Rule for Order Type C005

Configuration Document SAP PP-PI Page 27 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 27/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

2.25  BOM Usage

 Implementation Guide for R/3 Customizing (IMG) →  Production →  Basic Data


Menu Path     Bill of Material Usage 
→  Bill of Material →   General data → 

Transaction Code OS20


Configuration For one material separate bills of material for the individual organisational
Description areas involved can be created. For example, you create separate BOMs for
R&D, production, and costing. In this way, each area is dealing only with the
specific data it requires.

Example:

The R&D BOM includes all the components of the product and their technical

data
order.from the design point of view. This BOM is generally not linked to any

The production BOM contains all the items required from the production and
process point of view. Only items relevant to production, for which process
data (such as the issue storage location) can be entered, are required. A
production BOM does not contain any packaging materials required in the
shipping department.

While defining a BOM usage, the configuration of the item status is defined.

The item status is made up of a number of indicators in the BOM item (for
example, "relevant to production", "relevant to engineering/design", and so
on).

The item status controls how the BOM item is processed in related application
areas.
For example, the production department requires a BOM with all the items
that are relevant to production. These items are first copied to the planned
order. When the planned order is converted to a process order, the items are
copied to the process order. The process order tells the production department
which materials and intermediates it has to produce.

Configuration Document SAP PP-PI Page 28 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 28/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

For Claris we have used the standard Usage as”1” for Production

Usage Description
1 Production

2.26  Defining Item Categories

 Implementation Guide for R/3 Customizing (IMG) Production   Basic Data   
Menu Path  Bill of Material   Item Data   Define item categories 
Transaction Code OS13
Configuration When we enter a new BOM item, we must assign an item category to the item.
Description The item category defines the attributes and functions of a BOM item. It controls
field and screen selection for detail screens in BOM maintenance
The Following item categories are being used
Item category Description
N Non Stock Item
L Stock Item
K Class Item
D Document Item
M Intra Material

2.27  Define Reasons for Variances

 Implementation Guide for R/3 Customizing (IMG)     → Production →  Shop Floor


Menu Path     Define Reasons for Variances 
Control →   Operations →  Confirmation → 
Transaction Code OPK5 
Configuration The reasons for variances are maintained at the plant level.

Configuration Document SAP PP-PI Page 29 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 29/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

Description The Reasons mentioned below are currently maintained at manufacturing


plants 1001, 1002 (Injectable and infusion)

 Variances
 

2.28  Define Number ranges for Manual Processing

 Implementation Guide for R/3 Customizing (IMG) → 


→   Production→ 
→   Materials
Menu Path  Requirement Planning→ 
→   Number ranges→ → Define
  Number Ranges for Manual
 Processing
Transaction Code OMI3
Configuration In this step we maintain number ranges for Planned orders and Purchase
Description requisitions
The SAP default values are used in our configuration
for Planned orders
internal number range 1 with interval from 1 to 19999999
external number range 2 with interval from 20000000 to 29999999
           

for Purchase requisitions


           

internal number range 1 with interval from 10000000 to 19999999


           

external number range 2 with interval from 900000000 to 99999999


           

Configuration Document SAP PP-PI Page 30 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 30/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

2.29  Activating Requirements Planning

 Implementation Guide for R/3 Customizing (IMG)    →Production → Material


Menu Path  Requirements Planning → Planning File Entries → Activate MRP and Set Up
 Planning File 
Transaction Code OMDU 
Configuration We define the plants for which we want to carry out MRP here. Entries are only
Description to be made in the planning file once this indicator has been set. This means:
When creating a material, the material number is entered in the planning file and
the system sets the total change indicator as well as the net change planning
indicator
Every time the material undergoes a change relevant to the planning run, the
system sets the total change indicator and/or the net change planning indicator
(depending on the planning horizon).
All the plants at Claris Life sciences have been activated for MRP

Configuration Document SAP PP-PI Page 31 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 31/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

2.30  Defining Item Numbers of Order Types

    →   Production →  Material


 Implementation Guide for R/3 Customizing (IMG)
Menu Path  Requirements Planning →   Procurement Proposals →  Conversion of
Procurement Proposals →  Define Conversion of Planned Orders into
 Purchase Requisitions 
Transaction Code OMDV 
Configuration In this step, We define the following:
Description Number of planned orders, that are to be proposed for the collective conversion
of planned orders into purchase requisitions
Item number of the item that is transferred to the purchase requisition during the
conversion. Thus, it is possible to differentiate the purchase requisitions that
were created in the planning run from the ones that were created manually by the
purchasing department
For all the plants 500 has been proposed for the collective conversion of
planned orders into purchase requisitions

Configuration Document SAP PP-PI Page 32 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 32/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

2.31  Defining Conversion Planned Order to Process Order

    →  Production→  Material
 Implementation Guide for R/3 Customizing (IMG)
Menu Path  Requirements Planning →   Procurement Proposals →  Conversion of
Procurement Proposals →  Define Order Type for Conversion to
 Production/Process Order 
Transaction Code OPPE 
Configuration We define the order type that is automatically set when converting planned
Description orders into production orders or process orders
For Plants 1001, 1002, Production order PP01 Standard production order &
Process order PI01 Process order (internal number assignment) have been
set for conversions

Configuration Document SAP PP-PI Page 33 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 33/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

Configuration Document SAP PP-PI Page 34 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 34/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

3.  PRODUCTION PLANNING FOR PROCESS INDUSTRIES

3.1  Define Resource Category

 Implementation Guide for R/3 Customizing (IMG) →  Production Planning for


Menu Path Process Industries →  Master Data →  Resource →  General Data →  Define
 Resource Category 
Transaction Code OP40 
Configuration The resource category determines the data that can be maintained in a resource
Description and, therefore, the functions (for example, costing or scheduling) for which the
resource can be used.

Each resource category is assigned to the applications (for example, production,


and plant maintenance or quality management) whose menus allow us to
maintain resource with this category.

Each resource category has a number of screens assigned to it which the system
displays when resource of this category are displayed. The screens contain
groups of fields (for example, scheduling data). Depending on the resource
category, we can make field selections on these screens (for example, defining
required entry fields).

We specify whether change documents are written for each resource category.
Line
Processing unit
Team
Labor
Standard settings available in the system are used. The Resource Category
used are 0008(Processing Unit)

Configuration Document SAP PP-PI Page 35 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 35/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

3.2  Defining Person Responsible for Work Centre

 Implementation Guide for R/3 Customizing (IMG) →  Production Planning for


Menu Path Process Industries →  Master Data →  Resource →   General →  Determine
 Person Responsible 
Transaction Code SPRO 
Configuration With this key, we can identify a person or group of people responsible for
Description maintaining the master data in certain work centers.
These employees are not responsible for planning tasks but only for the
maintenance of the work center parameters
The following persons are responsible for maintaining work centre at Claris

Person Responsible

Configuration Document SAP PP-PI Page 36 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 36/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

3.3  Standard Value Keys

 Implementation Guide for R/3 Customizing (IMG) →  Production Planning for


Menu Path Process Industries →  Master Data →  Resource →  General Data → Standard
→ 
Value  Define Standard Value key 
Transaction Code OP19 
Configuration In this step we define standard value keys. The standard value key determines
Description the meaning of the six standard values in the operation. The SAP System assigns
a parameter ID to the standard values of the operation and the work in network
activities.
The parameter ID in turn determines:
the key word displayed for the standard value on the screen, for example, setup,
machine, labor, teardown etc.
the dimension (for example, time, quantity, volume) of the standard value
For Claris SAP Implementation we have defined “Z001” as Standard Value
key

Key Description
Z001 Fixed+Var+Labor+Power+Steam

Configuration Document SAP PP-PI Page 37 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 37/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

3.4  Defining Formula Parameters for Resources

 Implementation Guide for R/3 Customizing (IMG) →  Production Planning for


Menu Path Process Industries →  Master Data →  Resource →  Capacity Requirements
Planning →  Formulas for Resources (Work Centers) →  Define Formula
 Parameters for Resources (Work Center) 
Transaction Code OP17 
Configuration A formula is identified by its formula key. It is composed of formula parameters
Description that are identified by parameter Ids.
The following parameters are maintained for Claris Life Sciences

Parameter Description
SAPC04 Fixed Duration
SAPC05 Lot Size dep. Duration
SAP_03 Labour
SAP_09 Operation Quantity
SAP_08 Base Quantity
SAP_17 No. of Employees
ZCL_01 Power
ZCL_02 Steam

Configuration Document SAP PP-PI Page 38 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 38/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

3.5  Defining Formula for Resources

Implementation Guide for R/3 Customizing (IMG) → Production Planning for


Menu Path Process Industries → Master Data → Resource → Capacity Requirements
Planning → Formulas for Resources (Work Centers) → Define Formula for
Resources (Work Center)  
Transaction Code OP17 
Configuration We define the formulas that you want to use in the following areas:

Description Capacity planning


Scheduling
Costing

You can use the formula parameters to which values have been previously
assigned. The formula parameters can be linked mathematically using the
following operators:
Addition => +
Subtraction => -
Multiplication => *
Division => /
Formula ZCL001 will be used in Machine dependent resources for
scheduling and costing. Formula ZCL002 will be used in Labor dependent
resources for costing. Formula ZCL003 will be used in Labor dependent
resources for scheduling.
Formula
Description Formula
Key
MACHINE SAPC04 + ( SAPC05 * SAP_09
ZCL001 DEPENDENT  / SAP_08 )
LABOR
ZCL002 DEPENDENT SAP_03 * SAP_09 / SAP_08
LABOR (SAP_03 * SAP_09 / SAP_08) /
ZCL003 DEPENDENT(SCH) SAP_07

Configuration Document SAP PP-PI Page 39 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 39/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

3.6  Task List Usage

 Implementation Guide for R/3 Customizing (IMG) →  Production Planning for


Menu Path Process Industries →  Master Data →  Resource →   General Data →  Define
Task List Usage 
Transaction Code OP45 
Configuration Task List Usage key controls, that a resource can be used in which task lists like
Description master recipe or PM task list. For example, we can categorize resource into
maintenance resource or inspection resource according to their relevance and
their usage in general task lists or inspection plans. We can also allow resource
to be used in any combination of task lists types

Standard settings available in the system are used.


The following table lists the entries which are used for Claris

Task list type Description


002 Only inspection plans
008 Master recipe + process order
009 All task list types

Configuration Document SAP PP-PI Page 40 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 40/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

3.7  Define Capacity Planner

 Implementation Guide for R/3 Customizing (IMG) →  Production Planning for


Menu Path Process Industries →  Master Data →  Resource → Capacity Requirement
→ 
Planning  Determine Capacity Planner 
Transaction Code SPRO 
Configuration Key for a group of employees who are responsible for capacity planning. We can
Description use this key to select specific capacities. This is maintained at the client level.

The Following capacity Planners are maintained

Plant MRP Controller Description


1001 A01 INJ PRD LINE-1
A02 INJ PRD LINE-2
A03 INJ PRD LINE-3
A04 INJ PRD LINE-4
A05 INJ PRD LINE-5
A06 INJ PAC BELT-1
A07 INJ PAC BELT-2
A08 INJ PAC BELT-3
A09 INJ PAC BELT-4
A10 INJ PAC BELT-5
A11 INJ SPM PRINTING
A12 INJ STERILIZATION
A13 INJ DISP PM STORE

1002 B01 INF PRD LINE-1


B02 INF PRD LINE-2

B03 INF PRD LINE-3


B04 INF PRD LINE-4
B05 INF PRD LINE-5
B06 INF PRD LINE-6
B07 INF PRD LINE-7
B08 INF PAC BELT-1,2
B09 INF PAC BELT-3,4
B10 INF PAC BELT-5,6
B11 INF PAC BELT-7,8
B12 INF PAC BELT-9,10
B13 INF PAC BELT-11,12
B14 INF PAC BELT-13
B15 INF DISPENSING
B16 INF SPM PRINTING
B17 INF STERILIZATION
B18 INF DISP PM STORE

Configuration Document SAP PP-PI Page 41 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 41/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

3.8  Define Number Ranges for Master Recipe

 Implementation Guide for R/3 Customizing (IMG) →  Production Planning for


Menu Path Process Industries →  Master Data →  Master Recipe → Setting for Task List
Type →  Define Number Ranges for Master Recipe 
Transaction Code C2N2 
Configuration In this step we define number ranges for recipe groups.
Description When a master recipe is created, it must be assigned to a recipe group, which is
identified using a group key

The Number Range is preset to: A0000001 to ZZZZZZZZ

Configuration Document SAP PP-PI Page 42 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 42/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

3.9  Recipe Status

 Implementation Guide for R/3 Customizing (IMG) →  Production Planning for


Menu Path Process Industries →  Master Data →  Master Recipe →  Data for Recipe Header
→ 
 Define Recipe Status 
Transaction Code OP46 
Configuration The recipe status determines:
Description Whether a recipe is released for use in process orders
Whether a recipe is released for costing
Whether a consistency check is carried out before the recipe is posted
When a master recipe is created, a status must be assigned to it. This status can
later be changed according to the processing stage of the recipe. Together with
the recipe usage, the recipe status is used to create priority sequences that serve
as a basis for the automatic selection of recipes during order creation, capacity
planning and costing. 
The following status are being maintained for Recipe

Plant Description
1 Created
4 Released (general)

3.10  Recipe Usages

 Implementation Guide for R/3 Customizing (IMG) →  Production Planning for


Menu Path Process Industries →  Master Data →  Master Recipe →  Data for Recipe Header
→  Define Recipe Usage 
Transaction Code SPRO 
Configuration The recipe usage determines:
Description The purpose or area, for which a recipe is created (for example, the chemical, the
pharmaceutical or the food industry) The dynamic modification criteria to be
used in the corresponding orders for adjusting the inspection scope if inspection
points have not been defined When we create a master recipe, we must assign a
recipe usage to it. We can create several recipes with different recipe usages for
one material. 
The standard usage available will be used 
Usage Description
1 Production

Configuration Document SAP PP-PI Page 43 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 43/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

3.11  Define Planner Groups

 Implementation Guide for R/3 Customizing (IMG) →  Production Planning for


Menu Path Process Industries →  Master Data →  Master Recipe →  Data for Recipe Header
→  Define Planner Group 
Transaction Code SPRO 
Configuration A planner group identifies one or several planners who are responsible for
Description Maintaining certain recipes in a plant. When we create or change a master
recipe, we can assign a planner group to it.
The following planner group are being maintained for Claris
Plant Planner Group Description
1001 A01 IPQA Manager - Injectable
1001 A02 Production Manager–Injectable
1002 B01 IPQA Manager – Infusion
1002 B02 Production Manager - Infusion

3.12  Control key for Master Recipe

 Implementation Guide for R/3 Customizing (IMG) →  Production Planning for


Menu Path Process Industries →  Master Data →  Master Recipe →  Data for Operations
and Phases →  Define Control Keys 
Transaction Code OP67 
Configuration Control keys are assigned to operation and phases, and secondary resources.
Description In the control key, we set a number of flags and keys that specify the business
functions to be carried out for an operation, a phase or a secondary resource.

Control key determines how an operation, phase, or secondary resource is


handled in order processing and in product costing.

Configuration Document SAP PP-PI Page 44 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 44/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

Control keys can be used as follows:


In resources:
The control key we enter here is referenced or copied to the corresponding
operations, phases and secondary resources of the master recipe.
In the master recipe
When creating operations and phases as well as when allocating secondary
resources:
In the process order when maintaining operations, phases and secondary
resources:
When we create a process order, the system copies the control keys we have
maintained in the master recipe to the order. They can still be changed in the
order if there is no reference to the resource.
For Claris we are maintaining the following control keys

Control Key Control key Description


ZP01 Process manufacturing
ZP02 QC : Scheduling and MIC
ZP03 Process mfg., Inspection, AutoGR
ZP04 QC : MIC only
ZP05 Process manufacturing with AutoGR
ZP06 Process manufacturing-Bulk Preparation
ZP07 QA : Scheduling

3.13  Define Capacity Categories

 Implementation Guide for R/3 Customizing (IMG) →  Production Planning for


Menu Path Process Industries→  Master Data→  Resource→ Capacity requirement planning
→  Define Capacity Categories 

Transaction Code SPRO


Configuration In this step we define the capacity category that we want to assign to the
Description resource. With capacity category we determine,
· which capacity type a capacity category belongs to, for example:
- "available capacity in volumes/quantity" for storage resources
- "available capacity in time units" for processing units
· whether a capacity category can be assigned to people as single capacities
We have used the Capacity category 008

Configuration Document SAP PP-PI Page 45 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 45/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

3.14  BOM Status

 Implementation Guide for R/3 Customizing (IMG) →  ProductionPlanning for


Menu Path  process Industries →  Master Recipe →  Material List → General Data →  Define
 BOM Status
Transaction Code OS23
Configuration Via the BOM status, we define which other application areas can use a bill of
Description material with this status.
In the different areas in a company (such as costing), the BOM is exploded
according to the application. When we define an application for a certain area in
the company, we select the status indicators in the Minimum  requirements  of
BOM status dataset that the BOM status must have before the BOM is read for
the BOM explosion.
In MRP, the following indicators are checked directly from the definition of the
BOM status:
Explosion in MRP
Released for orders
MRP only reads BOMs whose BOM status has at least one of these indicators. 

Configuration Document SAP PP-PI Page 46 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 46/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

3.15  Process Order Type

 Implementation Guide for R/3 Customizing (IMG) →  Production Planning for


Menu Path Process Industries →  Process Order →  Master Data →  Order →      Define Order
Types 
Transaction Code CORN 
Configuration Process order type covers control information that is needed for managing the
Description order.
The order type defines the following:
We have to assign an order category to each order type. The order categories
have fixed assignments in the SAP System and show the technical characteristics
of the orders. The order category defines, for example, the transactions we can
use to process an order.

Plant Order Type Description


1001 C001 Production
C002 Packing

C002 Validation
C004 Performance Qualification
C005 Repacking
1002 C001 Production
C002 Packing
C003 Validation
C004 Performance Qualification
C005 Repacking

3.16  Number Ranges for Process Order

Implementation Guide for R/3 Customizing (IMG) → Production Planning for


Menu Path Process Industries → Process Order → Master Data → Order →  Number Ranges 
→  Define Number Ranges for orders 
Configuration Document SAP PP-PI Page 47 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 47/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

Transaction Code CO82


Configuration In this menu option, we define the number ranges for orders.
Description
Each order is uniquely identified by an order number within one client.

We allocate each order to a number range group via the order type. We can

allocate several order types to the same number range and thus the same interval.
•   Internal number assignment

When we create an order, the SAP System automatically assigns a


consecutive number from the number range that we have defined.
The number range defined are mentioned below

Order Type Number Range


C001 1000000000-1099999999
C002 110000000- 1199999999
C003 120000000- 1299999999
C004 130000000- 139999999
C005 140000000- 1499999999

3.17  Define Production Scheduler

 Implementation Guide for R/3 Customizing (IMG) →  Production Planning for


Menu Path Process Industries →  Process Order →  Master Data →  Order →      Bill of
 Material →  Define Production Scheduler 
Transaction Code CORU
Configuration Production scheduler is the entity who controls how process orders are managed.
Description For every production scheduler, a production scheduler profile is attached. By
assigning production schedulers to materials, we can define responsibilities for

Configuration Document SAP PP-PI Page 48 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 48/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

materials within production activity control.

In a production scheduling profile, we can Specify that in a process order


particular business transactions be carried out in parallel.
Automatic batch creation on order creation.
Batch creation on order release
For Claris we are marinating the following Production Scheduler

Plant Production Scheduler Description


1001 101 Production
102 Packing
1002 101 Production
102 Packing

3.18  Define Production Scheduler Profile

 Implementation Guide for R/3 Customizing (IMG) →  Production Planning for


Menu Path Process Industries →  Process Order →  Master Data → Order →      Bill of Material 
→  Define Production Scheduler Profiles 
Transaction Code CORY
Configuration Production scheduling profile is linked to the Production Scheduler and one can:
Description   Specify automatic functions like order release on order creation

  Printing of Order

  Scheduling on release

We can assign a production scheduler profile to a material (MMR) and


production Scheduler (Customizing)
Scheduler profiles C001, C002, C003, C004 are maintained for plants 1001
and 1002

Production Scheduler
Plant Description
profile
1001 C001 Production
C002 Packing
1002 C001 Production
C002 Packing

Configuration Document SAP PP-PI Page 49 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 49/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

3.19  Scope of Check

Implementation Guide for R/3 Customizing (IMG) → Production Planning for


Menu Path Process Industries → Process Order → Operations → Availability Check →   
Define Scope of Check 
Transaction Code OPJJ
Configuration To check the availability of material components in the process order, the
Description material components have to be assigned to checking group. Through checking

group
we canand checking
specify whichrule
MRPthe element
scope oftocheck is defined.
include and whichThrough scope of check
stock categories to be
included.

Define Scope of Check Yes / No (Include / Not Include)


Include safety stock Yes
Stock in transfer No
Include QI Stock No
Include Blocked Stock No

Configuration Document SAP PP-PI Page 50 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 50/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

W/o Subcontracting No
Check without RLT Yes
No Stor. Location Inspection No
Checking period No
Include Purchase orders No
Include Purchase Indents No

Include
Include dependent
reservationsreqmts No
No
Include Sales Reqmts No
Include deliveries No
Include shipping notification No
Include Dependent reservations No
Include released Orders No
Include Planned Orders No
Include Production Orders No
Include receipts in Past and future No

3.20  Define Checking Control

 Implementation Guide for R/3 Customizing (IMG) → Production Planning for


Menu Path Process Industries →  Process Order →  Operations →  Availability Check →  
 Define Checking Control  
Transaction Code OPJK 

Configuration Document SAP PP-PI Page 51 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 51/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

Configuration In this step we define the following:


Description Whether an availability check is to be carried out when we create or release an
order
Whether an availability check is to be carried out when we save an order that has
been created or released
Which checking rule is to be used
What effect a material shortfall is to have on the creation or release of an order

For all the manufacturing plant, the Check on the Material will be done
during the Creation and Release of the Process Order. If there is material
short falls No release will be carried out

3.21  Define Scheduling parameters for a process order

 Implementation Guide for R/3 Customizing (IMG) →  Production →  Capacity


Menu Path  Requirements Planning →   Operations →  Scheduling →  Define scheduling
 parameters for planned orders 
Transaction Code OPUZ 
Configuration The purpose of this activity is to define levels and control parameters for
Description scheduling
It comprises maintenance of
scheduling levels (detailed-, production-rate and rough-cut scheduling)
date adjustment when deadlines are exceeded
scheduling control for detailed scheduling
reduction
For all the Plants and Order types the scheduling has been defined as

forwards

Configuration Document SAP PP-PI Page 52 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 52/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

3.22  Defining Parameters for Order Confirmation

 Implementation Guide for R/3 Customizing (IMG) → 


→   Production Planning for
Menu Path Process Industries →  Process Order →  Operations →  Confirmation →  Define
Confirmation Parameters 

Transaction Code OPK4 


Configuration Using the Confirmation Parameters, you can proceed as follows:
Description   Confirmation function:
  Whether system proposes a partial confirmation, a final confirmation or

final confirmation with withdrawal posting of the open reservations for


the confirmation.
  Propose time unit
  Confirmation control:
  if the sequence is not adhered, you can issue a message
  Whether total confirmed qty of a operation checked for under delivery or

Configuration Document SAP PP-PI Page 53 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 53/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

over delivery tolerance in the order header


  Check on the dates
  Logs
  Goods Movement
  Propose confirmed data

For all on
will be theand
Process
checkOrder types
on over to the /respective
delivery plants,
under delivery all also
will the indicators
be not
checked.

3.23  Assigning Material Types to Task List

 Implementation Guide for R/3 Customizing (IMG) → 


→   Production Planning for
Menu Path Process Industries   Master Data   Master Recipe   Settings for the Task
 List Type   Assign Material Types 
Transaction Code SPRO

Configuration Document SAP PP-PI Page 54 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 54/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

Configuration Only materials of the material types allocated in this step can be allocated to a
Description master recipe at the header level, that is, as the material to be produced.
For task list type 2 Master recipe the following types have been assigned
Task ListType Material type
2 FERT
2 HALB
2 HAWA
2 HIBE
2 ROH
2 ZERT

3.24  Define Material Types Allowed for BOM Header

 Implementation Guide for R/3 Customizing (IMG) →  →   Production Planning for
Menu Path Process Industries → 
→   Master Data → 
→   Master Recipe → 
→   Material list → 
→  

→    Define Allowed Material Types for BOM Header 


General Data → 

Transaction Code OS24


Configuration In this step, we specify which material types in conjunction with BOM usages
Description are allowed for the BOM header material.
When we make these settings, we can make a generic entry in the fields for the
BOM usage and the material type. This means, for example, that we can enter an
"*" instead of a specific BOM usage. This stands for all possible BOM usages.
When we create a new bill of material, the system checks the material type as
follows:
The fully qualified (non-generic) entries are checked first. The generic entries
are checked afterwards. We can define that the use of the material type in
combination with the BOM usage is "allowed/not allowed" by setting the
indicator.

Configuration Document SAP PP-PI Page 55 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 55/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

The Following data is maintained for Claris


BOM Usage Material type
1 All material Types

3.25  Defining Order Type-Dependent Parameters

 Implementation Guide for R/3 Customizing (IMG) → 


→   Production Planning for
Menu Path Process Industries →  Process Order →  Master Data →  Order →  Define Order
Type-Dependent Parameters 
Transaction Code COR4 
Configuration In this step, we define the parameters that are valid for each order type and
Description plant. The parameters are split up as follows:
Master data
Cost accounting
Planning
Implementation 
For order type C001 and C002 production version and Master Recipe are
automatically selected whereas for C003, C004, C005 they are Manual
Selection 

Configuration Document SAP PP-PI Page 56 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 56/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

3.26  Assigning Process Instructions to Control Recipe Destinations

 Implementation Guide for R/3 Customizing (IMG) →  →   Production Planning for
Menu Path Process Industries →  Process Management →  Control Recipes / PI Sheets →  
 Define and Set Up Control Recipe Destinations 
Transaction Code O10C
Configuration Control recipe destinations are assigned to the phases of the master recipe and
Description the process order. In the process order, one control recipe is created and sent for
each control recipe destination assigned to the order. We specify the process
instructions that are to be generated in the process order when a control recipe is
created for a control recipe destination

The following destinations are created in addition to the standard SAP


destinations

CRD CRD Destination Destination Address


DC Dispensing Chemist Dispensing Chemist
MC Mixing Chemist Mixing Chemist
PS Packing Supervisor Packing Supervisor

Configuration Document SAP PP-PI Page 57 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 57/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

QA Quality Assurance Quality Assurance


QC Quality Control Quality Control
SC Sterlizer Chemist Sterlizer Chemist

Configuration Document SAP PP-PI Page 58 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 58/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

4.  BATCH MANAGEMENT

4.1  Activate Document Management for Batches


 Implementation Guide for R/3 Customizing (IMG) → 
→   Logistics - General
Menu Path →  →   Activate Document Management For
 Batch Management →  Batch Master → 

 Batches  
Transaction Code ODOC
Configuration In this step we activated the Document Management function for batches.
Description

4.2  Defining Batch Level

 Implementation Guide for R/3 Customizing (IMG) →  →   Logistics - General


Menu Path →  Batch Management →  Specify Batch Level and Activate Status Management 
Transaction Code OMCT
Configuration In this activity we specify the following:
Description The level at which batch numbers are unique
Whether batch status management is active in the client
The plants in which batch status management is active
The initial status of new batches

If we choose
respective plant and
material level,
thethe batch
plant. number
If you is material
choose unique in conjunction
level, the batchwith the
number
is unique together with the material. At client level, the batch number is unique
in the whole client
For Claris Batch level is maintained unique at Material Level

4.3  Activating Automatic Batch Number Assignment

 Implementation Guide for R/3 Customizing (IMG) → 


→   Logistics - General →  
Menu Path  Batch Management →   Batch Number Assignment →  Activate Internal Batch
 Number Assignment 

Configuration Document SAP PP-PI Page 59 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 59/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

Transaction Code OMCZ


Configuration In this activity we activate internal batch number assignment. We define whether
Description internal batch number assignment is allowed for goods receipts that have an
account assignment

The internal batch number assignment is activated

4.4  Maintain Internal Batch Number Assignment Range

 Implementation Guide for R/3 Customizing (IMG) →  →   Logistics - General


Menu Path → 
→  Batch
  Management → →   Batch Number Assignment →  Maintain Internal

 Batch Number Assignment Range 


Transaction Code OMAD
Configuration In this activity, we maintain number ranges for internal batch number assignment
Description The SAP standard number range are used at Claris
The number range is defined from 0000000001 to 9999999999

4.5  Define Batch Creation for Production Order / Process Order

 Implementation Guide for R/3 Customizing (IMG) →  →   Logistics - General →  
Menu Path  Batch Management →  Creation of New Batches →  →   Define Batch Creation for

 Production Order / Process Order 


Transaction Code CORW
Configuration In this step we made the following settings in batch management for the existing
Description production control profiles

Configuration Document SAP PP-PI Page 60 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 60/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

For plants 1001 and 1002 for order types C001 to C004 we have defined
Automatic batch creation on order release and classification carried out in
the background

4.6  Define Process Order Condition Tables

 Implementation Guide for R/3 Customizing (IMG) → →  Logistics


  - General → 
→  
Menu Path  Batch Management →  →   Define Process Order Condition
→   Condition Tables → 

Tables 
Transaction Code OPLD
Configuration In this IMG activity, we define condition tables for batch determination in
Description process orders.
We have used the condition table 501 which determines Batch for each
Material Type

4.7  Define Process Order Access Sequences

 Implementation Guide for R/3 Customizing (IMG) →  →  Logistics


  - General → 
→  
Menu Path  Batch Management →  →   Define Process Order Access
→   Access Sequences → 

Sequences 
Transaction Code SPRO
Configuration In this IMG activity, we define access sequences for batch determination in

Configuration Document SAP PP-PI Page 61 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 61/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

Description process orders. 


We have Defined the Order Sequence C003 which determines Batch for
each Material Type

4.8  Assign Search Procedure to Process Order and Activate Check

→  → 
Menu Path  Logistics - General
Check Batch  Batch Management
Search Procedure  Batch
Allocation and CheckDetermination and Batch
Activation→  Assign
Search Procedure to Process Order and Activate Check 
Transaction Code CORC
Configuration In this IMG activity, we allocate batch search procedures to those combinations
Description of process order and plant for which batch determination is to be carried out, and
activate batch checking. 

For Order type C001, C002, C003, C004, C005 the search procedure is
defined as CO0001

Plant Order Type Search procedure

1001 C001 CO0001


1001 C002 CO0001
1001 C003 CO0001
1001 C004 CO0001
1001 C005 CO0001
1002 C001 CO0001
1002 C002 CO0001
1002 C003 CO0001
1002 C004 CO0001
1002 C005 CO0001
1005 C005 CO0001

Configuration Document SAP PP-PI Page 62 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 62/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

4.9  Activating batch-specific Unit of Measures

 Implementation Guide for R/3 Customizing (IMG) →  →  Logistics


  - General → 
→  
Menu Path  Batch Management →  →   Batch-Specific Material Unit of Measure → →   Activate

 Batch-Specific Material Unit of Measure 


Transaction Code OMWS
Configuration If we want to use batch-specific material units of measure, set the Batch-specific
Description material units of  measure active indicator

The Batch Specific units of measure is activated

4.10  Edit Batch-Specific Material Unit of Measure

 Implementation Guide for R/3 Customizing (IMG) → 


→ Logistics
  - General → 
→  

Menu Path  Batch Management →  → Batch-Specific


  Material Unit of Measure → 
→   Edit Batch-
Specific Material Unit of Measure 
Transaction Code BMA1
Configuration In this step, we define which units of measurement we want to use as batch-
Description specific material units of measure.
We have maintained the following unit of measure

Unit Batch Specific UOM UOM


KIK kg act.ingrd. / kg KG

Configuration Document SAP PP-PI Page 63 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 63/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

4.11  Define Calculation of Proportion Quantity from Base Quantity

 Implementation Guide for R/3 Customizing (IMG) →  → Logistics


  - General → 
→  
Menu Path  Batch Management →  →   Batch-Specific Material Unit of Measure →  →    Define

Calculation of Proportion Quantity from Base Quantity 


Transaction Code BMA3
Configuration In this step, we define the ratio of the proportion unit to the base unit. This ratio
Description is needed to convert base units to proportion units of measure.

Unit Description Technical Format


EML Endotoxin Units / Mililiter EU/ml
G/L gram act.ingrd / liter gai/l
KIK kg act.ingrd. / kg kai/kg

4.12  Maintain Period Indicator

Menu Path  Implementation Guide for R/3 Customizing (IMG) →  →  Logistics


  - General → 
→  
 Batch Management →  →   Maintain Period Indicator 
→   Shelf Life Expiration Date→ 

Transaction Code O02K


Configuration In this step we specify which unit of measurement are used for the total shelf life
Description and minimum remaining shelf life.
We have used SAP defined Period indicators as day, week, month and year

Configuration Document SAP PP-PI Page 64 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 64/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

4.13  Activating Expiration Date View per Plant

 Implementation Guide for R/3 Customizing (IMG) →  Logistics - General →  


Menu Path  Batch Management →   Shelf Life Expiration Date (SLED) →  Set Expiration
 Date Check 
Transaction Code OMJ5
Configuration We have defined the time unit the system uses in the storage data of the material
Description master record in the Period indicator field.
The shelf life expiration date check is active for all the plants, except
1004,1005,1006 and the shelf life expiration date check is active for all the
movement types

4.14  Define Process Order Strategy Types

 Implementation Guide for R/3 Customizing (IMG) →   Logistics - General →  
Menu Path  Batch Management →  Batch Determination and Batch Check →  Batch Search
Procedure Allocation and Check Activation →  Define Process Order Strategy
Types 
Transaction Code SPRO
Configuration In this step, we define a strategy type for batch determination in process orders.
Description We use different batch search strategies for different combinations of plant and
order type. For this purpose, we have created the following strategy types:
A strategy type with a selection class that uses the shelf life expiration date as

Configuration Document SAP PP-PI Page 65 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 65/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

search criterion during batch determination


Strategy
Description Class Type
Type
ZC01 Mat.Type/Mvt/Plant 023 Batch

4.15  Define Search Procedure to Process Order

 Implementation Guide for R/3 Customizing (IMG) →  Logistics - General → 


Menu Path Batch Management → Batch Determination and Batch Check → Batch Search
Procedure Definition→ Define Search Procedure to Process Order 
Transaction Code SPRO
Configuration In this step, we define batch search procedures for batch determination in
Description process orders. A batch search procedure comprises all strategy types that can be
used for a particular combination of plant and order type

Search
Description Condition Type
procedure
ZO0001 Claris Batch Search Procedure CO03, CO01

Configuration Document SAP PP-PI Page 66 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 66/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

4.16  Activating Batch Derivation

 Implementation Guide for R/3 Customizing (IMG) →   Logistics - General →  
Menu Path  Batch Management →  Derivation of batch Data→  Activate batch Derivation 

Transaction Code DVSP


Configuration In this step, we activate Batch derivation
Description The Batch Derivation is set as Active

4.17  Define Derivation Events

 Implementation Guide for R/3 Customizing (IMG) →   Logistics - General →  
Menu Path  Batch Management →  Derivation of batch Data→  Define Derivation Events 

Transaction Code SPRO


Configuration In this step, you assign search procedures to the derivation time points.
Description The system does not start derivation at this time point until a procedure has been
assigned for searching for attributes for the receiving batch and the sending
batches.
The Derivation is taken place at Release of process order and The Recipient
search procedure is defined as BDR001 and the Sender Search Procedure is
defined as BDS001

Configuration Document SAP PP-PI Page 67 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 67/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

5. DOCUMENT MANAGEMENT

5.1  Define Number Ranges for Document Numbers

 Implementation Guide for R/3 Customizing (IMG) →  Cross Application

Menu Path components →  Document Management →  →   Define Number Ranges for
 Document Numbers 
Transaction Code OD00
Configuration In this IMG activity, we define the number ranges for document numbers and the
Description type of number assignment. When we define a document type, we must create at
least one number range for assigning document numbers.
We have the following options:
1.Internal number assignment
  SAP System assigns a numeric number from the number range defined.

2. External number assignment


  We can define a numeric number from the number range defined.

Sno From To
10 1000000000 1099999999
20 1100000000 1199999999
30 1200000000 1299999999
40 1300000000 1399999999
50 1400000000 1499999999
99 2000000000 2099999999
BM 10000000 19999999
BP 20000000 29999999
QM 3000000 39999999

Configuration Document SAP PP-PI Page 68 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 68/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

5.2  Define Document Types

 Implementation Guide for R/3 Customizing (IMG) →  Cross Application


Menu Path components →  Document Management →  →   Define Document Types 

Transaction Code SPRO


Configuration In this step, We defined ratios such as per cent, per mil, mass per cent, etc.
Description
Type Description
ATB Artwork-Baby Carton
ATC Artwork-C Box
ATI Artwork - Insert
ATL Artwork- label
ATM Artwork- Mother Cart
BMR Batch Mfg record
BPR Batch Pkg record
MOA Method of Analysis

Configuration Document SAP PP-PI Page 69 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 69/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

5.3  Define Data Carrier

 Implementation Guide for R/3 Customizing (IMG) →  Cross Application


Menu Path components →  Document Management →  →   Define Document Types 

Transaction Code SPRO


Configuration You must only partially carry out this work step when you want to store the
Description original application files that are accessed using the Knowledge Provider in a
secure are . In this case you must only define the data carrier that can be used as
a server or frontend computer.Complete Work Step Execution
You must execute this step completely when you store original application files
in a secure area using DMS and not using the Knowledge Provider.
We have defined a Data Carrier “TE”

The Data carrier vault for the same is


Type Description
CL Vault Claris
MP Vault for BMR/BMR
QM Vault for MOA-QM

Configuration Document SAP PP-PI Page 70 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 70/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

Configuration Document SAP PP-PI Page 71 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 71/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

6. CLASSIFICATION SYSTEM

6.1  Define Characteristics Groups


 Implementation Guide for R/3 Customizing (IMG) →  Cross Application
Menu Path components → Classification System →  Characteristics→  Define Characteristics

Groups 
Transaction Code SPRO

Configuration In this step, you can group similar characteristics together in characteristics
Description groups. You can then use the characteristics group to find individual
characteristics. For example, you may want to group together all characteristics
that refer to a length

We have defined the following Characteristics groups

Group Char Group


PPPI_01 Process Message Characteristics
PPPI_02 Process Instruction Characteristics
PPPI_03 Char. For Material Flow Btw. Orders
PPPI_0 Special Applications

Configuration Document SAP PP-PI Page 72 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 72/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

6.2  Define Characteristics Status

 Implementation Guide for R/3 Customizing (IMG) →  Cross Application


Menu Path components → Classification System →  Characteristics→  Define Characteristics
Status 
Transaction Code SPRO
Configuration In this step, you can group similar characteristics together in characteristics
Description groups. You can then use the characteristics group to find individual
characteristics. For example, you may want to group together all characteristics
that refer to a length
We have defined the following Characteristics groups
Group Char Group
0 In Preparation
1 Released
2 Locked

Configuration Document SAP PP-PI Page 73 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 73/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

7.  OTHER SETTINGS

7.1 Check Units of Measurement

 Implementation Guide for R/3 Customizing (IMG) → 


→   SAP NetWeaver

Menu Path → 
→ General Settings → 
→   Check Units of Measurements 
Transaction Code CUNI
Configuration To perform mathematical / technical transactions, ‘units of measures’ are
Description required that are compatible to international ISO standards. There are many
UOMs that are SAP defined and are retained in the system. However, an
exhaustive list of often used ‘Unit of Measurements’ is also defined in the
system based on the need of CLL Maintenance. These UOMs are detailed below:

Name of Unit Abbreviation


Each EA
Kilogram KG
Metre M
Gram G
Kg Act. Ingredient / Kg KAI
Litre Active ingredient / Litre LAI
Ton TON
Box BOX

Configuration Document SAP PP-PI Page 74 of 75 Version 1.0

http://slide pdf.c om/re a de r/full/sa p-pp-c onfigura tion-doc ume nt-56244b0807a 4f 74/75
 

5/28/2018 Sa p Pp Configura tion Doc ume nt - slide pdf.c om

Configuration Document SAP PP-PI Page 75 of 75 Version 1.0