You are on page 1of 2

VALUE ASSESSMENT 4 LABELS

IDENTCO Value Assessment for Labels

To remain competitive in today’s


manufacturing marketplace, organizations
must target cost reduction across the entire
supply chain. The IVAL assessment is a proven
program that typically delivers a 10% to 30%
reduction in Total Cost of Ownership for
printed production parts.

Application Optimization and Cost Reductions

Developed over more than three decades of


collaboration with industrial partners, IVAL is a
structured process for analyzing the form, fit
and function of all your labels to eliminate
waste, drive cost reductions, and ensure quality
and compliance.

A team of experienced Application Engineers


utilize Lean/Six Sigma methodology to identify
IVAL Stages
opportunities to:
1. Pre-Assessment Data Collection
• Eliminate waste
2. Onsite Plant Assessment
• Improve processes
• Ensure quality & agency compliance 3. Data Entry/Specification
• Standardize materials, dies, and label Organization/Estimating
constructions
• Reduce inventory and obsolescence 4. Cost Reduction Project
Identification
• Consolidate parts, introduce on-demand
printing solutions, kitting and composite sets
5. Formalized Savings Report &
• Improve administrative functions such as Proposal
design, sourcing, and inventory management
6. Project-Based Implementation

For More Information Call 800-533-2559 OR visit www.identco.com


VALUE ASSESSMENT 4 LABELS

Stage 1: Pre-Assessment Data Collection Stage 4: Cost Reduction Project Identification


IDENTCO assigns a dedicated team of cross- The outcome of this detailed analysis is a project-
functional experts to your business. This team will by-project roster of significant cost reduction
conduct interviews to gain an understanding of opportunities. We employ a standardized report
your unique printed parts environment. During that captures the current scenario, our Application
this stage, we focus on identifying your label Optimization™ recommendations, detailed
performance and agency compliance improvement opportunities, and suggested
requirements, and sharing insight on the processes to implement our recommendations.
challenges peers in your industry face daily.
Stage 5: Formalized Savings Report & Proposal
Stage 2: Onsite Plant Assessment At this stage, we deliver a step-by-step summary
A team of IDENTCO Application Engineers documenting the hard dollar impact of each
conducts an onsite assessment of your plant. Our project. hard dollar. These reports are reviewed
AE’s meet with key stakeholders, which typically and refined throughout project implementation at
include: regularly scheduled intervals. Typically, these are
presented on a quarterly basis during the first
• Engineering year, then adjusted to an agreed upon frequency.
• Production Management
• Quality Stage 6: Project-Based Implementation
• Procurement Finally, the most rewarding part of the entire
• Warehousing process, when projects identified in Stage 4 are
• All other stakeholders involved in printed parts selected for execution. Project Managers from
both parties collaborate to prioritize part
During a plant walkthrough, we review and transitions in the most effective manner. Plans for
document label storage sites and protocols; designs and proof approvals and PPAP
dispensing methods and equipment; application procedures are established for all applicable
sites, surfaces, methods, and equipment; final parts, including a complete analysis of each part
product appearance and packaging; and Shipping to ensure compliance with all specification and
& Receiving. We interview operators who interact performance requirements. This level of
with printed production parts on a regular basis engagement and teamwork from the IVAL support
and collect multiple samples for in-depth review. team continues throughout the implementation
to ensure smooth and seamless transitions of
Stage 3: Data Entry/Specification Organization production parts.
The collected information and samples are
carefully analyzed by the IVAL team to confirm the
original opportunities for cost reduction identified MONTERREY, MEXICO
in Stages 1 and 2. CENTER OF EXCELLENCE

KM 16.5 – Interior 14B


By more closely analyzing a cross-section of your
Col. Molses Saenz
printed production part spend and comparing Apodaca, Nuevo Leon CP 66613
samples to engineering specification
requirements, we are able to verify and quantify Phone: +51 (81) 8008-0438

the actual savings potential. www.identco.com

U N I TED ST AT E S M E X I CO G E R M A NY PRC MAL AYS IA


HEADQUARTERS MONTERREY FRANKFURT HONG KONG PENANG

You might also like