Professional Documents
Culture Documents
January 2020
TABLE OF CONTENTS
List of Figures…………………………………………………………………………………………...
List of Acronyms………………………………………………………………………………………..
About the Manual…………………………………………………………………………………….
1 DISCOM Approval Process ...................................................................................................... 1
1.1 Login ............................................................................................................................................ 1
1.2 UPCL Dashboard ....................................................................................................................... 1
1.3 Stages of Application Processing............................................................................................. 3
2 UPCL Approvals........................................................................................................................ 5
2.1 SDO Approvals .......................................................................................................................... 5
2.2 EE (Distribution) Approvals .................................................................................................. 11
2.3 AE (Meter) Approvals ............................................................................................................. 22
2.4 SDO (Nodal) Approvals ......................................................................................................... 23
2.5 EE (Nodal) Approvals ............................................................................................................. 25
2.6 Finance Approvals ................................................................................................................... 31
3 Reports ...................................................................................................................................... 33
3.1 All Applications Received ...................................................................................................... 33
3.2 UPCL Summary Report .......................................................................................................... 37
3.3 Subsidy Summary Report ....................................................................................................... 38
3.4 Site Visit Schedule.................................................................................................................... 38
4 Steps to Translate Website Content to Hindi ....................................................................... 40
LIST OF FIGURES
Acronyms Definition
CT Current Transformer
EE Executive Engineer
EI Electrical Inspector
MW Megawatt
PIC Project-In-Charge
The Ministry of New and Renewable Energy (MNRE) has proposed state wise targets for grid
connected solar rooftop projects under the Jawaharlal Nehru National Solar Mission (JNNSM).
Uttarakhand has a proposed target of installing 350 megawatt (MW) of grid connected solar
rooftop projects. To ensure timely installation, transparent interaction of the Distribution
Company (DISCOM) and its Consumers is essential.
To enable rapid deployment of solar rooftop systems in the State of Uttarakhand a Unified
Single Window Clearance Portal for processing Solar Rooftop PV Application named ‘Solar
Rooftop Portal – Uttarakhand’ is developed under the support of the GIZ for Grid Connected
Solar Rooftop Photovoltaic (GRPV). The Solar Rooftop Portal - Uttarakhand shall enable
Uttarakhand Power Corporation Limited’s (UPCL’s) Consumers to approach UPCL to
interconnect their solar rooftop system with the grid and eligible Consumers may approach to
avail subsidy.
This portal shall enable the following stakeholders to interact through the portal:
UPCL
Consumers who register as Applicants
The purpose of this User Manual is to assist UPCL Officials in using the 'Solar Rooftop Portal
– Uttarakhand’ through a step-by-step detailed process. This manual will guide UPCL officials
regarding the use of this portal. The functions and the processes to be followed are described
in detail to aid the user in the use of the Portal.
1 DISCOM APPROVAL PROCESS
This section defines the functions enabled for UPCL Officials through the portal. It defines the
steps to be followed for viewing applications received, granting approvals and clearances and
steps to generate statistics report.
1.1 LOGIN
All UPCL Officials shall adopt the following steps to access the ‘Solar Rooftop Portal –
Uttarakhand’ to grant approvals:
1. Click on ‘Apply Online/Login’ tab on the ‘Solar Rooftop Portal – Uttarakhand’
homepage to access the Login page illustrated in Figure 1.
2. Enter email ID and password.
3. Click on Login.
The UPCL Officials shall login with their login ID and password to grant approvals to the
Applicant.
All Applications
Received
UPCL Summary
Reports
Subsidy Summary
Reports Overall Statewide Statistics Monthly Statistics
Time Schedule for
Site Visit
The following Officials have access to provide approvals on various process steps elaborated
in the Table 1:
Sub-Division Officer (SDO), UPCL
Executive Engineer (EE) (Distribution), UPCL
AE (Meter), UPCL
District Project Officer (DPO), UREDA
SDO (Nodal), UPCL
EE (Nodal), UPCL
Accounts, UPCL
The list of Stages on the Portal and approvers for each Stage is provided in Table 1. The
description of each UPCL approvers role at their specific stages is provided in the Chapter 2.
Accept
6. If the application is correct, the SDO shall conduct the technical feasibility study and
select ‘Accept’.
7. The SDO shall then fill Technical Feasibility Report - Form A, as shown in Figure 5 and
6.
8. While updating the technical feasibility report, the SDO should mention one of the
following:
Whether the plant is feasible.
Whether it is not feasible.
Feasible, but with reduced capacity.
Feasible, but with system enhancement.
9. The SDO shall also upload the following documents:
Details protection scheme, trp scheme, relay list with setting and Current
Transformer (CT) ratios etc.
Single line diagram proposed SPV to 33/11 kilovolt (kV) substation.
Whether the Applicant has any dues till date or not? If yes, enclose the details.
Others (if any).
Note: The format of the file can be .jpg/.png/.jpeg/.pdf and the size of each file shall be a maximum of 2
MB only.
10. Fill the details, upload documents, provide comments and click on ‘Submit’ to
submit the technical feasibility report to the EE (Distribution).
Shortfall
11. If the application is incorrect/deficient, the SDO shall select ‘Shortfall’, provide
comments and click on ‘Submit’ and redirect the application to Applicant at
Stage 12: Allotment of Time Slot for Meter Installation and Joint Inspection
Applications can be viewed at this Stage only if the Applicant has submitted request in Stage
11 and AE (Meter) has confirmed Meter Testing in Stage 10.
The Applicant will send a request to SDO (Distribution) for installation of meter and joint
inspection of the solar rooftop system with the grid in Stage 11. The steps to be followed for
Time Slot Allotment by SDO (Distribution) are as follows:
1. Select ‘Process Application’ in the menu, then select ‘Time Slot Allotment for Site Visit’
as depicted in Figure 7.
Provide Remarks
Click to Select the
Correct Option
Click to Submit
5. Click on ‘View’ icon to check the ‘Download’ button to download Work Completion
Report.
6. Click on ‘Status’ dropdown to ‘Accept’ or provide ‘Shortfall’.
Accept
7. If all the submissions meet UPCL’s requirement, the SDO (Distribution) shall select
‘Accept’ and write comments in the remarks section. A section will open as shown in
Figure 10.
Shortfall
Select Status
Provide
Comments
Click to View
Uploaded File
Click to
Submit
Click to Choose File Click to Upload
Provide Reduced
Capacity, If
Required
Click to Submit
Convert to PDF
Click to Submit
1. If there are any errors in the Technical Feasibility Report, resend the
application to the SDO.
2. Select ‘Rectify Form A’ and provide comments in the ‘Verifier Comments’
section.
3. Click on ‘Submit’ to redirect the application to SDO.
4. The SDO shall make necessary changes in Form A and resubmit the form to the
EE (Distribution) for final approval.
Stage 11: Upload Work Completion Report and Request for Joint Inspection to SDO,
UPCL
The Applicant shall submit the Work Completion Report which can be viewed in the
‘History’ page.
Stage 14: System Check and Upload Synchronisation Letter After Grid Synchronisation
and Joint Inspection
On completing meter installation, at this stage EE (Distribution) provides the ’Letter of
Synchronisation’ (Form 7) to the Applicant. The steps for which are as follows:
1. Select ‘Process Application’ in the menu, then select ‘System Check and
Synchronization With UPCL Grid’ as depicted in Figure 17.
3. Click on ‘Action’ icon, and the page displayed in Figure 19 will appear.
5. If the meter is installed and plant is synchronized, the EE shall click on ‘Accept’, a
section for Form 7 ‘Letter of Synchronization’ as shown in Figure 20 will be displayed.
Also provide ‘Verifier Comments’ in the provided section.
Provide Sealing
Certificate Number
Click to Submit
6. Fill the details required in Form 7 and click on ‘Submit’ to send the Letter of
Synchronization to the Applicant.
7. In case of any errors/deficiency noted at the time of installation of meter and grid
synchronization, the EE (Distribution) shall click on ‘Shortfall’. Form 8 as shown in
Figure 21 will be displayed.
Stage 15: Grid Synchronisation Intimation to DPO (UREDA) for Joint Inspection
Once the Applicant will select the time slot a notification will be sent to the DPO, UREDA for
joint visit. The DPO will be able to see the list joint verifications pending along with the dates
of visit.
The request for meter testing will be received by the EE (Meter) through their login. Steps for
meter testing are as under:
1. In Dashboard menu, click on ‘Process Application’ and then click on ‘Application
Verification’ in the sub-menu, the page as depicted in Figure 22 will be displayed.
5. On completing meter testing, select the ‘Status’ as ‘Accept’ and provide date of meter
testing.
6. Provide ‘Verifier Comments’.
7. Click on ‘Submit’ to complete the meter testing
Once the Applicant submits the PCR, it will be received by the SDO (Nodal). The PCR will be
reviewed by the SDO (Nodal), EE (Nodal), and subsidy will be disbursed by Account. In this
Stage, the SDO will receive the PCR and associated documents for review. The process for
reviewing and providing approval is as follows:
1. Click on ‘Process Application’ menu and select ‘Application Verification’ from the sub-
menu as shown in Figure 24.
3. Select ‘Document Review by SDO (Nodal), a page will open as shown in Figure 26.
4. Click the icon under ‘History’ to view Joint Inspection Report. A page will open as
shown in Figure 27.
5. Joint Inspection Report can be viewed in the ‘Application Details’. Click the icon to
download Joint Inspection Report.
7. The SDO shall view and download the PCR and documents submitted by the
Applicant.
8. Click on ‘Status’. The below two options will be available in the drop-down:
a. Accept: If the PCR is complete, select ‘Accept’ and mention ‘MNRE Subsidy
Amount’.
b. Shortfall: If the PCR or related documents are incomplete, select ‘Shortfall’ and
mention ‘MNRE Subsidy Amount’. In case of shortfall the Applicant shall re-
submit the PCR.
9. The SDO will mention ‘Verifier Comments’ and click on ‘Submit’ to submit the
response to be reviewed by EE (Nodal).
Stage 18: PCR Review and Upload to SPIN Portal and Subsidy Release Approval
To check and provide approval for Subsidy Release, follow the below-mentioned steps:
1. Click on ‘Process Application’ menu and select ‘Application Verification’ from the sub-
menu as shown in Figure 29.
2. List of Stages for EE (Nodal) approval along with the applications pending for
approval at each stage will be displayed as shown in Figure 30.
3. Select ‘PCR Review and Upload to SPIN Portal and Subsidy Release Approval’, a page
will open as shown in Figure 31.
Click to Submit
6. Click on ‘Submit PCR to SPIN’, the data will be uploaded on the SPIN Portal.
7. The page will refresh and the status of the application will change to “PCR File to be
Uploaded’, as shown in Figure 33.
At this Stage, EE (Nodal) will provide approval for the subsidy, subsequently, the subsidy
will be released by the Finance.
1. Click on ‘Action’ against the application in Figure 35, a new page will open as shown
in Figure 36.
The Finance department under the EE (Nodal) will have access to approve Stage 19 for PCR
Document Review and Subsidy Disbursement.
Once the EE (Nodal) provides approval for subsidy release, the EE (Nodal) will upload the
PCR to SPIN portal and forward the application for subsidy disbursement by the Finance. On
release of Subsidy, the Finance shall update the portal with details of subsidy disbursement.
1. Click the ‘Process Application’ menu and select ‘Application Verification’ from the
sub-menu as shown in Figure 37.
2. List of Stages for approval by Finance Controller will appear as shown in Figure 38.
3. Select ‘Subsidy Disbursement by Finance UPCL’, a page will open as shown in Figure
39.
This stage will be activated once the subsidy is disbursed by the Finance.
3. Click on ‘History’ icon to view the ‘History Page’. The page shown in Figure 43 will
be displayed.
4. The ‘History Page’ is a repository of all Applicant Information.
6. Click on ‘View Uploaded Documents’ to view all uploads as depicted in Figure 45.
3. Select ‘Translate to ह िं दी’ option, the website content will be translated to Hindi as
shown in Figure 51.