PANVEL HILLS
RESIDENTIAL DEVELOPMENT PROJECT
PANVEL, NAVI MUMBAI
SCOPE OF WORK, ASSUMPTIONS & EXCLUSIONS
C. CONSTRUCTION SCOPE......................................................................................................................4
1) ARCHITECTURAL ASSUMPTIONS...........................................................................................................7
2) STRUCTURAL - ASSUMPTIONS.............................................................................................................. 8
3) EXCLUSIONS.......................................................................................................................................... 8
E. PLUMBING & FIREFIGHTING SYSTEM- ASSUMPTIONS & EXCLUSIONS................................................9
1) ASSUMPTIONS.................................................................................................................................... 11
2) REFERENCE STANDARDS..................................................................................................................... 12
3) POINT MATRIX.................................................................................................................................... 13
4) EXCLUSIONS........................................................................................................................................ 15
Design Management & Construction of Stilt+19 Floor Residential Tower including clubhouse and
ancillary service areas.
Construction Area: 663,383 Sqft
Wing A, B, D, E, G & H : Stilt+19 floors
Wing C & F : Stilt+16 floors
The scope of work shall include Earthworks, Substructure & Superstructure RCC works, Masonry &
Plaster, Flooring/Wall/Ceiling finishes, Waterproofing, Doors, Windows, Lifts, Plumbing, Fire
fighting, Electrical, HVAC (in clubhouse). External Development work shall include roads,
pavements, STP, rainwater harvesting, swimming pool, landscaping & other related civil works.
Earthworks
Waterproofing Works.
Internal Signages
External Development
o Boundary Wall
o Horticulture
o UG Tanks
o Swimming Pool
o Service areas
HT PANEL
INTERNAL WIRING
LIFT WORKS
SERVICE LIFT
PASSENGER LIFT
ELV SYSTEM
CCTV SYSTEM ONLY GRD FL. LOBBY & MAIN ENTRY/ EXIT
TELEPHONE & INTERNET FOR FLATS only POINTS WITH CONDUITS &
CABLES.
INTERCOM SYSTEM
Description Scope
PLUMBING SYSTEM
Wash Basin
Kitchen Sink
1) ARCHITECTURAL ASSUMPTIONS
1. The costing is based on the architectural drawings and the structural drawings given by client
3. We presume that all the statutory approvals related to the project are in Clients scope and all
construction related approvals are in CONTRACTOR scope.
4. We presume that all the Design approvals from relevant Authorities, with related Supporting &
Drawing Documentation & Laisoning are in Clients scope.
6. Topographical survey plans (received from client) has been read in conjunction with the master plan
building sections for obtaining the finished levels at site. If required Independent topographical survey
will be conducted by CONTRACTOR.
7. Doob grass has been considered for the undeveloped area in the masterplan.
8. Costing for finishes is done as per the schedule of finishes & material base rates. Any variation in the
material palette/ base rates will have an impact on the direct cost.
9. The work planning has been done with a planned requirement of 4 No’s Tower crane & 4 No’s
Material cum passenger hoist.
10. Swimming Pool depth will be having varying depths, 1500mm for Adult pool, 600mm for children &
300mm for other areas.
11. All the tiles will be procured from Morbi or equivalent range.
12. Door and Window hardwares will be of branded good quality Aluminium/CP fittings.
13. Cost towards the below items has been considered as provisional. Actual amount to be ascertained
during the detailed design stage.
14. All Works towards the below External development items have been considered on the Budget.
Internal Signage’s
Water Fountain
Planter Boxes, landscape furnitures, Gazebo, Sitting areas.
Landscape Lighting & Light Fixtures
2) STRUCTURAL - ASSUMPTIONS
1. Proposed Methodology of construction is Modular Aluminium Formwork
system.
3. Any cutting and filling to reach the foundation depth will be in the scope of CONTRACTOR.
3) EXCLUSIONS
1. All Statutory Liasoning, Approvals and its associated cost.
2. Cutting and replantation of trees and related permissions.
3. Any loose/fixed furniture, white goods inside the apartments & clubhouse.
4. Modular kitchen and kitchen equipments like, hob, chimney etc.
5. LEED/GREEN building credit rating
6. All sort of advertisement panel.
7. Environmental graphics, art work, murals & decorative items.
8. Cost of relocation of existing overhead lines / HT lines, electrical poles & lines, underground piping
and networks (within the site battery limits) or any manner of inter face works for the same.
9. Cost for any demolition at site.
10. Cost for any sort of mock up outside the building.
1) ASSUMPTIONS
1. CONTRACTOR scope starts from HT breaker & 22kV / 0.433kV Oil Type Outdoor Transformers and
its LT outgoing cabling to the respective building switchgear & onwards.
2. In case of failure of Grid supply, emergency stand by power supply is provided by DG set. For these
purpose radiator cooled DG sets with AMF panel is considered. DG sets are with acoustic enclosure
(75 dB) suitable for outdoor installation. DG set is considered only for common area internal
lighting, a lift, water pump & fire fighting pump as shown in load sheet.
3. From DG sets, power will be fed to common area lighting & Lifts panels through Aluminium XLPE
armoured cables.
4. From Transformer aluminium armoured cables will be laid underground & connected to building
main distribution panel & then further to individual electrical meter through fuse cut-out /MCB
located in meter room.
5. Proposed L.T. distribution scheme will be at 415 Volts 3 phase 4-wire system with separate
earthing.
6. Each building is provided with Main building distribution panel. In case utility failure the Emergency
Lighting, elevator etc. will be fed through DG set.
7. All MEP services equipment’s are considered as per Indian electricity voltage system. That is 3phase
415 Volts & 1phase 240 Volts @ 50 Hz.
8. The average Soil resistivity is considered as 100 Ohm-meter at the site.
2) REFERENCE STANDARDS
System design & specifications will be as per relevant IEC/IS/NBC & Local statutory norms & design
codes.
Local By – laws
National Building Code of India – 2005/2016
National Electrical Code of India – 1985
Relevant codes of Bureau of Indian Standards
3) POINT MATRIX
Electrical Matrix for 1 BHK Flats
16 A
Ceili Swit
6A 16 A
Brack ng ch AC
Ceili Exha Swit Swit AC Telepho
Sr. et Light and Poin Do Lighti Pow
Descripti ng ust ch ch Poin T ne/ Total
N Light (Tub Sock ts or ng er
on Fan Fan and and ts V Interco Load
o. (light e et 0.75 Bell Load Load
Pt. Pt. Sock Sock 1 TR m
pt) light for TR
et et
pt) geys
er
LIVING &
1 DINNING 3 0 2 2 0 0 1 1 1
ROOM
2 BALCONY 0 1 0 0 0 0
BEDROO
3 2 0 1 2 0 1 0
M
4 BATH 1 0 0 0 0 1 0
TOILET
5 1 0 0 1 0 0 0
(WC)
6 KITCHEN 0 1 0 1 2 2 0
TOTAL 7 2 3 2 6 2 1 1 0 1 1 1
LOAD IN 120 100
28 40 60 60 100 500 1500
WATTS 0 0
CONNEC
4.75
TED 0.196 0.08 0.18 0 0.6 1 1.5 1.2 0 0.456 4.3
6
LOAD kW
DIVERSIT
60 60 60 60 60 60 25 60 60
Y%
DEMAND 0.117 0.04 0.10 0.37 0.273 2.05 2.32
0 0.36 0.6 0.72 0
LOAD kW 6 8 8 5 6 5 86
16 A
Ceili Swit
6A 16 A
Brack ng ch AC
Ceili Exha Swit Swit AC Telepho
Sr. et Light and Poin Do Lighti Pow
Descripti ng ust ch ch Poin T ne/ Total
N Light (Tub Sock ts or ng er
on Fan Fan and and ts V Interco Load
o. (light e et 0.75 Bell Load Load
Pt. Pt. Sock Sock 1 TR m
pt) light for TR
et et
pt) geys
er
LIVING &
1 DINNING 3 0 2 2 1 1 1
ROOM
2 BALCONY 0 1 0 0
CHILDRE
N'S
3 2 0 1 2 1
BEDROO
M
BEDROO
4 2 0 1 2 1 0
M
5 BATH 1 0 0 1
TOILET
6 1 0 1 0
(WC)
7 KITCHEN 0 1 1 2 2
TOTAL 9 2 4 2 8 2 1 1 1 1 1 1
LOAD IN 120 100
28 40 60 60 100 500 1500
WATTS 0 0
CONNEC
5.07
TED 0.252 0.08 0.24 0 0.8 1 1.5 1.2 0 0.572 4.5
2
LOAD kW
DIVERSIT
60 60 60 60 60 60 25 60 60
Y%
DEMAND 0.151 0.04 0.14 0.37 0.343 2.17 2.51
0 0.48 0.6 0.72 0
LOAD kW 2 8 4 5 2 5 82
4) EXCLUSIONS
1. 22 KV line from nearest substation to HT breaker. That shall be laid by the local electricity board.
2. Solar Panel.
3. HPSV street lighting has been considered but no Special Light fitting for:
B. ELECTRICAL WORKS
i. Low side electrical system
ii. Building common area lighting
iii. Main LT panel, meter/sub panel, DB's
iv. LT cabling (Al. Busbar)
v. Internal wiring and switches and points
vi. All meter of flats should be provided by client only installation will be done by contractor.
C. PLUMBINGWORKS
i. Internal Water Supply as per flat layout plan.
ii. Water Distribution (Shaft)
iii. Internal Drainage –Soil / Waste (Inside toilets) - Drainage of all line till first Chamber.
iv. Internal Drainage – Vent / Rain Water at Shaft
v. Solar hot water piping in kitchen
vi. Sanitary Fixtures & Fittings
vii. IWC- Orissa Pan/ EWC floor mounted with exposed flushing cistern
E. All Fire Fighting works to be undertaken as per norms and design requirement.