Professional Documents
Culture Documents
Report if additional work carried out: * Switch OFF the machine before work Check by
* Be aware on slip hazards Sign:
* Be aware of sharp edges
* Be aware of pinch points and crushing hazards. Date:
* Do not remove any hydraulic fitting if still have pressure in the line.
* Use LOTO procedure
Action Note: C = Cleaning, G = Greasing, I = Inspection, L = Lubricate, T = Test Run. Verify by:
Navin