Approved by AICTE, Affiliated to Anna University, Chennai.
Accredited by NAAC with B Grade, An ISO 9001:2015 certified Institution Jayaram Nagar, Chellangkuppam, Cuddalore 607 003
STANDARD OPERATING PROCEDURE(SOP)
PNEUMATIC TRAINER KIT
DO NOT use this machine without completing appropriate induction / training.
PROTECTIVE EQUIPMENT AND EMERGENCY
First Aid Kit EQUIPMENT Check compressor and motor oil levels and top up as required. (For petrol powered motor and electric powered compressors). PRE-OPERATIONAL SAFETY CHECKS Refer to operator manual. Examine power lead for obvious damage (for electric motor compressors) Start the compressor noting the pressure gauge increase and the cut-in / cut-out pressure levels. Adjust the pressure regulator to suit the particular work requirements. Always check these pressures at regular intervals during normal operation. OPERATIONAL SAFETY PROCEDURES Air hose connections must be secured and checked prior to being pressurized. If portable, position the compressor unit in an area that will not disturb or obstruct the workshop environment. Never kink or cut off an air hose to restrict the flow of air. Switch off the power to the machine when work is completed. POST OPERATION Clean up all debris using a brush and dispose of appropriately. Put away all accessories and tooling. CK College of Engineering and Technology Approved by AICTE, Affiliated to Anna University, Chennai. Accredited by NAAC with B Grade, An ISO 9001:2015 certified Institution Jayaram Nagar, Chellangkuppam, Cuddalore 607 003
STANDARD OPERATING PROCEDURE(SOP)
HYDRAULIC TRAINER KIT
DO NOT use this machine without completing appropriate induction / training.
PROTECTIVE EQUIPMENT AND EMERGENCY
First Aid Kit EQUIPMENT Leakage at any fitting Reservoir level, and oil color, temperature, and general condition Pressure Gauges Greater than 25 psi between upstream/downstream, indicates PRE-OPERATIONAL SAFETY CHECKS filters needing changed) Check air breathers filters and oil filter housings Hoses – rubs, wear, kinks, or movement Operation - jerky or erratic Check the operation and condition of equipment before use. Check for hydraulic fluid leaks - report to PI. Ensure column pins are fully engaged after adjusting height. OPERATIONAL SAFETY PROCEDURES Carefully align work under press for even force to be applied. Do NOT apply excessive force. Do not exceed the maximum pressure indicated on the hydraulic press. Keep hands/fingers away from all clamping and moving parts. CK College of Engineering and Technology Approved by AICTE, Affiliated to Anna University, Chennai. Accredited by NAAC with B Grade, An ISO 9001:2015 certified Institution Jayaram Nagar, Chellangkuppam, Cuddalore 607 003 Switch off the power to the machine when work is completed. POST OPERATION Clean up all debris using a brush and dispose of appropriately. Put away all accessories and tooling.
STANDARD OPERATING PROCEDURE(SOP)
AC SERVO MOTOR WITH PID CONTROLLER DO NOT use this machine without completing appropriate induction / training.
PROTECTIVE EQUIPMENT AND EMERGENCY
First Aid Kit EQUIPMENT Clean motor of any dust or soil. Check oil rings turn with shaft. Check oil level in bearings. PRE-OPERATIONAL SAFETY CHECKS Visually check for oil and grease from bearings. Technician to examine the starter switch , fuses and tighten loose connections Distinguish live parts from other parts of the electrical system. Determine the voltage of live parts. Understand the minimum approach OPERATIONAL SAFETY PROCEDURES distances outlined for specific live line voltages. Ensure proper use of special safety equipment and procedures when working near, or on, exposed energized parts of an electrical system CK College of Engineering and Technology Approved by AICTE, Affiliated to Anna University, Chennai. Accredited by NAAC with B Grade, An ISO 9001:2015 certified Institution Jayaram Nagar, Chellangkuppam, Cuddalore 607 003 Switch off the power to the machine when work is completed. POST OPERATION Clean up all debris using a brush and dispose of appropriately. Put away all accessories and tooling.
STANDARD OPERATING PROCEDURE(SOP)
DC SERVO MOTOR WITH PID CONTROLLER DO NOT use this machine without completing appropriate induction / training.
PROTECTIVE EQUIPMENT AND EMERGENCY
First Aid Kit EQUIPMENT
Clean motor of any dust or soil.
Check oil rings turn with shaft. PRE-OPERATIONAL SAFETY CHECKS Technician to examine the starter switch , fuses and tighten loose connections
OPERATIONAL SAFETY PROCEDURES Switch on the Digital PID Controller and DC
Motor speed controller. To interface DC Motor speed controller and PID controller using Patch card. To enter PV and CV values. 4. To store the values of PID. To Run Program 6. To check the Motor CK College of Engineering and Technology Approved by AICTE, Affiliated to Anna University, Chennai. Accredited by NAAC with B Grade, An ISO 9001:2015 certified Institution Jayaram Nagar, Chellangkuppam, Cuddalore 607 003 RPM. Switch off the power to the machine when work is completed. POST OPERATION Clean up all debris using a brush and dispose of appropriately. Put away all accessories and tooling.
STANDARD OPERATING PROCEDURE(SOP)
STEPPER MOTOR WITH 8051 MICROCONTROLLER DO NOT use this machine without completing appropriate induction / training.
PROTECTIVE EQUIPMENT AND EMERGENCY
First Aid Kit EQUIPMENT Clean motor of any dust or soil. Check oil rings turn with shaft. PRE-OPERATIONAL SAFETY CHECKS Check oil in bearings. Technician to examine the starter switch , fuses and tighten loose connections OPERATIONAL SAFETY PROCEDURES Distinguish live parts from other parts of the electrical system. Determine the voltage of live parts. Switch on the Micro Controller Initialize the starting address. Enter the mnemonics code in micro CK College of Engineering and Technology Approved by AICTE, Affiliated to Anna University, Chennai. Accredited by NAAC with B Grade, An ISO 9001:2015 certified Institution Jayaram Nagar, Chellangkuppam, Cuddalore 607 003 controller Reset the micro controller. Switch off the power to the machine when work is completed. POST OPERATION Clean up all debris using a brush and dispose of appropriately. Put away all accessories and tooling.
STANDARD OPERATING PROCEDURE(SOP)
MICROPROCESSOR KIT 8085
DO NOT use this machine without completing appropriate induction / training.
PROTECTIVE EQUIPMENT AND EMERGENCY
First Aid Kit EQUIPMENT
Check the Power Cable
PRE-OPERATIONAL SAFETY CHECKS Reset the 8085 Kit Check for any short circuit
OPERATIONAL SAFETY PROCEDURES Start the process
Initialize the memory location for getting augends and addend. Initialize one register to store carry. CK College of Engineering and Technology Approved by AICTE, Affiliated to Anna University, Chennai. Accredited by NAAC with B Grade, An ISO 9001:2015 certified Institution Jayaram Nagar, Chellangkuppam, Cuddalore 607 003 Get augends to accumulator and increment the memory pointer to get addend in memory. Add augends & addend in memory Else increment the register assigned for carry storage. Stop sum (accumulator content) and carry in the specific memory location. Stop the process. Switch off the power to the machine when work is completed. POST OPERATION Clean up all debris using a brush and dispose of appropriately. Put away all accessories and tooling.