Project: Proposed Renovation of Five (5) Storey Building - Pocketb

Date: January 6, 2022

Item No.

1.0
2.0
3.0
4.0
5.0

6.0
7.0
8.0

9.0

10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0

27.0

28.0
29.0
30.0

Highlight
ONGOING
DONE
HOLD
Project: Proposed Renovation of Five (5) Storey Building - Pocketbell House Con
ate: January 6, 2022

Scope of Work

Hauling/Disposal
Dismantling of Existing Tiles of Comfort Rooms (M/F Toilet) 2nd - 4th flr.
Dismantling of Existing Granite Tiles
Demolition of Existing Concrete Ceiling Canopy at Ground Floor Entrance
Dismantling of Existing Tiles Stairs (Ground - Fifth Floor)
Repair/Installation of Moisture Resistant Gypsum Board of Ceiling of Ante-Room, Radio Room of Smart
(Roof Deck)
Chipping of Existing Waterproofing - Roofdeck
Cleaning of Areas for Waterproofing (Roof Substrate and Walls) - Roofdeck

Installation of Acoustic Ceiling & Gypsum Board, metal furring attachments with Fiber insulation for
Wall Partition (Ground Floor - Fifth Floor)

4" CHB for Wall Partition


Waterproofing (Exterior Fire Walls)
Plastering of Existing Stairs, Walls and Wall Partitions (Ground Floor - Fifth Floor)
Existing anay finished apply skim coat (Ground Floor - Fifth Floor)
Sanding of Wall & Flooring/Grinding/Repair Crack of Walls - Roofdeck
CHB Laying/Rebar/Plastering (M/F Toilet) - 5th Floor
Roofdeck Skylight - Reinforcement/6" CHB, rebars, cement & sand
Painting of Walls/Interior Ceiling, Walls at Stairs & Exposed Ceiling (Lower Basement - Fifth Floor)
Painting of Machine Room Exterior, Storage Room, Radio Room, Ante-Room and Water Tank at
Roofdeck
Ceiling Installation from Ground to Fifth Floor
Floor Polishing, Chipping and Tiles Installation (Ground - Fifth Floor)
Tiles Installation for Stairs - Lower Basement to Fifth Floor
Handrail from Lower Basement to Fifth Floor (Painted Steel Bracket with Wood Handle Finished)
Installation of Doors and Painted Solid Wood w/ Door Jambs - M/F (Ground Flr - 5th Flr)
Dismantling and chipping of existing pebble flooring parking area (in front of bldg. main entrance)
Replacement of existing pebble flooring parking area to concrete flooring including refurbishing of the
existing septic tank cover with steel matting
Demolition of the Slab in the Sewage Pit
Chipping works in the interior face or the walls of the existing sewage pit and sump pit (except for the
retaining wall part)
Concrete pouring and plastering in the chipped interior face of the walls of the existing sewage pit and
sump pit
Waterproofing (Sewage Pit & Sump Pit)
Slab Pouring and Restoration in the Sewage Pit and Sumpit

Status
Ongoing
Completed
Verification
ng - Pocketbell House Construction Schedule

Team
Target Date of Schedule of
Remarks
Completion Jhun Gilbert Work

2nd Disposal ongoing 2021-09-11 P P DONE


2021-09-11 P DONE
2021-09-15 P DONE
2021-09-18 P DONE
2021-09-04 P DONE
TBD P

2021-08-28 P DONE
2021-09-11 P DONE

2021-10-30 P ONGOING
4th, 3rd flr ongoing;
Ground, 2nd flr onhold
2021-09-18 P HOLD
TBD P
2021-09-11 P ONGOING
2021-09-11 P ONGOING
2021-09-11 P ONGOING
2021-09-11 P DONE
TBD P
2021-09-18 P

2021-09-18 P

TBD P
TBD P
TBD P
TBD P
TBD P
TBD P

TBD P

2021-10-29 P DONE
P
TBD
P
TBD
TBD P
TBD P