IBW-EHS-STD-01
Page No. Page 1 of 1
Issue No. 1
Criteria for Hazard Identification & Risk Analysis Revision No. 1/C
Date 04.12.2017
Risk
Scale Severity Probability Duration
Ranking
The consequences of hazard may Work should not be started or continued until the risk has Repetitive instances. Once in a
have risk to the entire factory or been reduced or eliminated. month or more. Permanent
5 Intolerable
even outside the factory. It is not possible to reduce the risk even with unlimited Previous history shows very Not recoverable
resources, work has to remain prohibited. high likelihood of occurrence
The consequences of hazard may Work should not be started until the risk has been Frequent instances. Previous
pose a risk to more than one reduced or eliminated. data shows happening of
4 department or in the most part of Substantial Considering the resources may have to be allocated to impact between once in month Impact is More than one month
factory area reduce the risk. Where the risk involves the work in to one quarter.
progress urgent actions should be taken.
Incase the product of S+S+P+D is more than 12 i.e.60% or above of the maximum rating Hazard & associated risk is treated as significant
Incase the hazard / risk is covered under the legal requirements irrespective of S+S+P+D rating it will be treated as significant
Prepared By: Safety Officer Approved By: Management Representative Issued By: Safety Officer