09
RISK ASSESSMENT’
Purpose To ensure that hazard and risks associated with any work activity undertaken by
KUWAIT ENERGY EGYPT are systematically identified, assessed, controlled,
managed and mitigated through a formal and structured review process. This
process is known as risk assessment workshop.
Prevention of accidents, incidents, ill health & their associated costs. Legal
compliance. Reduction in claims & complaints. Reduced insurance premiums.
Allows financial planning of progressive risk reduction measures. Involvement
of staff in process encourages consultation, increases hazard awareness and
ownership & contributes to positive H&S culture. May also increase quality
standards, efficiency & productivity.
Scope This process will apply to all KUWAIT ENERGY EGYPT operations and locations
where potential hazards exist.
Risk ‐ the likelihood that the hazard will cause harm in the circumstances.
Combination of the likelihood of an incident occurring & the severity of the
outcome
Prevention Control
Mitigation Control
Consequence or outcome
Cause or threat
Where additional controls have been identified and the participants believe
they are practical to implement
2‐ Recommendation = ‘Tolerable’
Where the risk is currently tolerable and no additional controls have been
identified
Where the risk is currently tolerable and the participants believe that the
additional controls that have been identified are not practical to implement
3‐ Recommendation = ‘Cease’
Where the risk is currently intolerable and additional controls have been
identified and the participants believe they are not practical to implement
Monitoring Check that conditions remain unchanged; controls are available adequate &
being used.
Condition for review New equipment, technology, premises, personnel, type of personnel, legislation
or best practice. If new information on H&S risks becomes available. After an
incident or enforcement action. If the results of monitoring, audit, health
surveillance suggest review is necessary. Also review periodically to ensure RA
remains valid.
Risk Rating in KEC should take in to account the presence and effectiveness of
the existing risk management controls. Residual Risk is in this sense is the risk
remaining with the current suite of controls in place. Inherent Risk is a
potentially complex issue and arguably difficult to comprehend as it implies the
level of risk prior to the implementation of any controls. As an alternative
approach to ranking Risk Events based on their inherent risk level,
consideration of the worst case consequences should be used.
The change in risk from the Residual Risk to the Post Treatment Risk is often
referred to as the Risk Reduction.
Severity Rating
The severity rating is a measure of the consequence to KEC that is most likely to
occur as an outcome of the Risk Event. Severity Ratings should be defined with
reference to KEC Incident Severity Criteria (App.1)
The terms “likelihood”, “probability” and “frequency” are often used in relation
to risk, and it is important that they are clearly understood and used in a
consistent way.
Likelihood and chance are expressions which indicate, in general terms, the
possibility of something happening.
Probability is the ratio of the number of chances that a particular event may
occur to the total number of chances. It is expressed as a number in the range
of 0 to 1, zero being the certainty that the event will not occur, and 1 being the
certainty that the event will occur. It is also normal to express probability in
percentage terms.
Frequency is a rate which expresses how often a particular event occurs within
a stated period of time. It is defined as the reciprocal of the average time
between events, and thus is often expressed in terms such as 1 per 1000 years.
The difference between frequency and probability is clearly demonstrated by
noting that for an event which is likely to occur every three months, the
frequency of occurrence is 4 per year whereas the probability of the event
occurring in any one year should always be less than or equal to 1.
The frequency rating should also capture KEC’s exposure to the Risk Event as
well as the likelihood that a specific outcome will occur.
Example 1
The most likely consequence of an office fire in a building fitted with standard
KEC Safe Working Manual Page 4 of 12
Risk Assessment Rev. 0.0
10/14/2010
fire detection and alarm systems, combined with adequate emergency egress
routes to a safe location would be a case of medical treatment most likely for
someone exposed to smoke or someone with a pre existing medical
susceptibility to heart attack requiring assistance after travelling down the
emergency evacuation stairs “Moderate”.
Likelihood rating
Risk Rating
SeverityModerate
Likelihood Possible
Responsibilities The operation Mgr./ HSERS Manager /Site HSE advisor and the field
superintendent ensure that any new project, operation, modification or work
activity is subject to such process of hazard and risk identification. This will be
achieved through a RAW. The HSERS Manager will attend such workshops to
ensure that the details of this procedure are implemented. The Person‐In‐
Charge (PIC) at each location is also responsible for ensuring that the
requirements of this procedure is implemented wherever a project has a
potential for hazards or risks. KUWAIT ENERGY EGYPT should invite all
concerned parties to attend the RAW, employees as well as contractors.
Competent persons should only participate in such process.
1. Identify hazards
6. Record assessment
Eliminate
Substitute
Isolate/Segregate
Authority to Accept Risk • Risk can ONLY be accepted by those authorised to do so, as follows:
o Asset Manager
o HSERS manager
N.B:‐
• Seek approval prior to starting the work / continuing operations if you
are not authorised to accept the risk.
• If a risk changes it needs to be re‐assessed and the appropriate level of
authorisation requested.
• If the risk mitigation measures are not effective the risk reverts to that
prior to application of the measures.
Journey Management risk • Before long distance vehicle journey a risk assessment ( form2)should
assessment be issued by the transportation supervisor approved by the
administration manager
SEVERITY PROBABILITY
More than once Yearly to once every Every 10 to 100 Every 100 to Less than once
requency per year within 10 years in KEC years in KEC 1000 years every 1000
the Business years
Element
Occurs more than The event has The event might The event or Have never
Historical once per year occurred several occur once in your similar has heard of this
within the times or more in career occurred happening
Business Element your career elsewhere
Finan ial Safety Environment R putation A: Frequent B: Likely C: Possible D: Unlikely E: Rare
Reasons for ight driving ًﺍﻟﺪﺍﻋﻴﺔ ﻟﻠﺴﻔﺮ ﻟﻴﻼ Journey Management’s Remarks: ﺕ ﻣﺪﻳﺮ ﺍﻟﺮﺣﻠﺔ Comment for driver ﻣﻼﺣﻈﺎﺕ ﻟﻠﺴﺎﺋﻖ
Vehicle was checked before journey ﺗﻢ ﺍﻟﻜﺸﻒ ﺍﻟﻴﻮﻣﻲ ﻋﻠﻲ ﺍﻟﺴﻴﺎﺓﺭ ﻗﺒﻞ ﺍﻟﺮﺣﻠﺔ
Road instructions were given to driver ﺗﻢ ﺇﻋﻄﺎﺭﺇءﺷﺎﺗﺎﺩ ﺍﻟﻄﺮﻳﻖ ﻟﻠﺴﺎﺋﻖ
Tips to the road ﻧﺼﺎﺋﺢ ﻟﻠﻄﺮﻳﻖ
1. You have to abide by the roa d speed ﺍﻷ ﻟﺘﺰﻡﺍ ﺑﺎﻟﺴﺮﻋﺔ ﺍﻟﻤﻘﺮﺓﺭ ﻟﻠﻄﺮﻳﻖ.١
2. Ensure that all passengers ha ve correctly fastened their safety seat belts before starting thee vehicle. . ﻳﺮﺟﻲ ﺍﻟﺘﺄﺁﺪ ﻣﻦ ﻧﺄ ﺟﻤﻴﻊ ﺍﻟﺮﺁﺎﺏ ﻗﺪ ﻗﺎﻣﻮﺍ ﺑﺮﺑﻂ ﺃﺣﺰﻣﺔ ﺍﻷﻣﺎﻥ ﻗﺒﻞ ﺗﺸﻐﻴﻞ ﺍﻟﺴﻴﺎﺓﺭ.٢
3. Road sig ns must be obeyed. ﻳﺠﺐ ﺃﺣ ﺘﺮﻣﺎ ﺃﺷﺎﺭ ﺗﺎ ﺍﻟﻤﺮﺭﻭ.٣
v is totally not allowed, and when it is necessarily needed, this form must beeapproved by
4. Night driving ﺤﻘﻮﻝ
ﻣﺪﻳﺮ ﺍﻟﺤﻘ/ ﺍﻟﻤﺨﺘﺺ ﻏﻴﺮ ﻣﺴﻤﻮﺡ ﺑﺎﻟ ﺴﻔﺮ ﻟﻴﻼً ﻭ ﻓﻲ ﺣﺎﻟﺔ ﺍﻟﻀﺮ ﺓﺭﻭ ﺍﻟﻘ ﺼﻮﻱ ﻳ ﺠﺐ ﻧﺄ ﻳﺘﻢ ﺃﻋﺘﻤﺎﺩ ﻩﺬﺍ ﺍﻟﻨﻤﻮﺝﺫ ﻣﻦ ﺍﻟ.٤
H Manager before approving any
KEC’s VP’s/ Field Manager who in turn must initially refer back to the HSE ﻤﺪﻳﺮ . ًﺑﻌﺪ ﺍﻟﺮﺟﻮﻉ ﺃﻭ ﻻً ﻟﻤ ﺪﻳﺮ ﺍﻟﺼﺤﺔ ﻭ ﺍﻟﺴﻼﻣﺔ ﻗ ﺒﻞ ﺍ ﻟﻤﻮﺍﻓﻘﺔ ﻋﻠﻲ ﺍ ﻟﺴﻔﺮﻟﻴﻼ
night driving.
Driver ‘s Signature Administration/ Filed Manager ‘s Employee’s Relevant VP’s Signature or the field
signature manager signature (in case of night driving only)
ﺗﻮﻗﻴﻊ ﺍﻟﺴﺎﺋﻖ
ﻣﺪﻳﺮ ﺍﻟﺤﻘﻮﻝ/ ﺗﻮﻗﻴﻊ ﺍﻟﻤﺪﻳﺮ ﺍﻷﻳﺮﺍﺩ ﺗﻮﻗﻴﻊ ﺍﻟﻤﺪﻳﺮ ﺍﻟﻤﺴﺌﻮﻝ ﻋﻦ ﺍﻟﻤﻮﻇﻒ ﻭﺃ ﻣﺪﻳﺮ ﺍﻟﺤﻘﻮﻝ )ﻓﻲ ﺣﺎﻟﺔ ﺍﻟﺴﻔﺮ
(ﻟﻴﻼً ﻓﻘﻂ
In case of travelling in remote areas, unpaved roads or the need to drive at night, the initial approval of the relevant VP or the region president
must be obtained.