FINAL REPORT
“Western Railway: Nalasopara”
Vol. VII
July 2012
CONTENT
1. INTRODUCTION
3. SOLUTIONS
3.1 INTRODUCTION
3.2 SOLUTIONS TO DISCOURAGE TRESPASSING AT
NALLASOPARA
3.3 DRAWINGS INDICATING SOLUTIONS
3.4 3D SKETCHES INDICATING SOLUTIONS
5. ESTIMATED COST
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
CHAPTER 1
INTRODUCTION
PLATFORM 2/3 AND 1. RAILWAY TRACKS BETWEEN PLATFORM 4 AND 3 AFTER A TRAIN
HAS LEFT FROM PLATFORM 4.
THE HEIGHT OF THE FOB IS VERY HIGH AND HENCE IS UNCOMFORTABLE EVEN
FOR NORMAL HEALTHY PERSON TO USE IT.
THERE ARE SMALL TIME VENDORS SELLING VEGETABLES & OTHER DAY-TO-DAY
USABLE PRODUCTS ALONG THE RAILWAY TRACKS IN THE VICINITY OF THE
PLATFORM AT EITHER END, THIS LEADS TO TRESPASSING.
CHAPTER 2
CHAPTER 3
SOLUTIONS
3.1 INTRODUCTION
THE MAGNITUDE OF THE TRESPASSING PROBLEM AND THE REASONS OF TRESPASSING
AT NALASOPARA STATION HAVE BEEN STUDIED AT INCEPTION REPORT STAGE WHICH
HAVE BEEN PRESENTED TO MRVC AND ALSO SUBMITTED AS INCEPTION REPORT.
FOB
RAILING
R.C.C. WALL
GREEN PATCH
4. PROVIDE FOB AT THE SOUTHERN END JOINING ALL PLATFORMS (ALREADY UNDER-
CONSTRUCTION)
EXISTING AMENITIES:
CHAPTER 4
CHAPTER 5
ESTIMATED COST
QUANTITES HAVE BEEN DERIVED BASED ON GENERAL ARRANGEMENT DRAWINGS
COST ESTIMATE HAS BEEN WORKED OUT AS PER THE RATES SPECIFIED BY M.R.V.C.
NALASOPARA
LENGTH OF
LOCATION OF RAILING RAILING WEIGHT/M COST/KG COST
BETWEEN PLATFORM NO. 1 AND 2 538 M 24 KG RS. 75 968400
BETWEEN PLATFORM NO. 3 AND 4 545 M 24 KG RS. 75 981000
TOTAL 1949400
LENGTH OF CROSS-
LOCATION OF RCC WALL RCC WALL SECTIONAL AERA COST/M3 COST
SOUTHERN SIDE OF PLATFORM
NO. 1 130 M 0.95M2 RS. 12000 1482000
NORTHERN SIDE OF PLATFORM
NO. 1 100 M 0.95M2 RS. 12000 1140000
SOUTHERN SIDE OF PLATFORM
NO. 4 156 M 0.95M2 RS. 12000 1778400
NORTHERN SIDE OF PLATFORM
NO. 4 163 M 0.95M2 RS. 12000 1858200
TOTAL 6258600
AREA OF
GREEN PERIMETER OF
LOCATION OF GREEN PATCH PATCH RAILING COST/M2 COST
SOUTH END OF PLATFORM NO. 2 &
3 969 SQ.M 219 M RS. 400 387600
NORTH END OF PLATFROM NO. 2 &
3 794 SQ.M 216 M RS. 400 317600
TOTAL 705200
LOCATION OF FOB WIDTH AREA COST/M2 COST
PROPOSED SOUTHERN FLIGHTS TO
THE MIDDLE FOB. (3 NOS) 2.2 93 M2
RS. 400000 3720000
TOTAL 3720000
TOTAL COST OF PROPOSED SOLUTION AT NALASOPARA STATION Rs.1,26,33,200
SAY Rs. 1.3
C WALL
ED RC
PROPOS
ED RAILING
PROPOS
TCH
EEN PA
ED GR
PROPOS
C WALL
ED RC
C PROPOS
D.W.
C WALL
ED RC
PROPOS
NG
ED RAILI
PROPOS
PATCH
ED GREEN
PROPOS
SCHEDULE
LEGEND
C WALL
ED RC
PROPOS
ED RAILING
PROPOS
TCH
EEN PA
ED GR
PROPOS
C WALL
ED RC
C PROPOS
D.W.
C WALL
ED RC
PROPOS
NG
ED RAILI
PROPOS
PATCH
ED GREEN
PROPOS
LEGEND
SOLUTIONS FOR NALASOPARA STATIONS
1. PROVIDE RCC WALL AT BOTH ENDS OF PLATFORM NO. 4 BETWEEN RAILWAY LAND
AND ROAD. 200 M LONG.
PEOPLE TRESS PASS FROM THE AFORE MENTIONED SPOT TO ACCESS THE RESIDENTIAL COMPLEXES IN THE EAST.
EXISTING AMENITIES:
2 COMMERCIAL STALL, 1 TOILET ON PLATFORM NO 2/3.