Consultancy for study on Trespassing over Railway

Track in Mumbai Suburban area & remedial measures


thereon.

FINAL REPORT
“Western Railway: Nalasopara”
Vol. VII

July 2012

MRVC SIR JJCOA


CONSULTANCY CELL
FINAL REPORT

CONTENT
1. INTRODUCTION

1.1 BRIEF DESCRIPTION.


1.2 PRIMARY SURVEY.
1.3 REASONS OF TRESPASSING AT NALLASOPARA

2. IDENTIFICATION OF TROUBLE SPOTS

2.1 IDENTIFIED TROUBLE SPOTS.


2.2 DRAWING INDICATING TROUBLE SPOTS

3. SOLUTIONS

3.1 INTRODUCTION
3.2 SOLUTIONS TO DISCOURAGE TRESPASSING AT
NALLASOPARA
3.3 DRAWINGS INDICATING SOLUTIONS
3.4 3D SKETCHES INDICATING SOLUTIONS

4. GENERAL ARRANGEMENT DRAWING

4.1 GENERAL ARRANGEMENT DRAWINGS

5. ESTIMATED COST
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.

CHAPTER 1

INTRODUCTION

1.1 BRIEF DESCRIPTION.


THIS IS A STATION IN THE WESTERN RAILWAY LINE.
 THIS STATION WAS PREDOMINENTLY CHOSEN TO PREVENT TRESPASSING THAT
OCCURS LARGELY AT THE LEVELING CROSSING ADJACENT TO THE SOUTHERN
END OF THE PLATFORMS.
 NUMBER OF PLATFORMS – 4
 NUMBER OF TRACKS -5
DOWN – TRACK NO. 1 & 3.
UP – TRACK NO. 2 & 4.
TRACK NUMBER 5 IS AN ADDITIONAL TRACK USED BY UP AND DOWN
MAIL TRAINS.
 NALASOPARA WEST IS LARGELY POPULATED AS COMPARED TO NALASOPARA
EAST.
 THERE IS A RAILWAY YARD ON THE EASTERN SIDE OF THE STATION WHICH IS
USED BY PEOPLE TO TRESPASS TO POISAR VILLAGE BEYOND THE YARD IN THE
EAST.
 THERE ARE 2 FOBS. ONE AT SOUTHERN END AND OTHER AT MIDDLE OF
PLATFORM LENGTH.
 THERE IS ONE ELEVATED TICKET WINDOW ON THE SOUTHERN FOB IN THE EAST
AND THE OTHER ADJACENT TO PLATFORM NO. 1 IN THE WEST.

THE MAGNITUDE OF TRESPASSING PROBLEM AND THE REASONS OF TRESPASSING


AT NALASOPARA STATION HAVE BEEN STUDIED AT INCEPTION REPORT STAGE
WHICH HAVE BEEN PRESENTED TO MRVC AND ALSO SUBMITTED AS INCEPTION
REPORT.

MRVC -1- Sir JJCOA Consultancy Cell


Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.

1.2 PRIMARY SURVEY


THE FOLLOWING PHOTOS INDICATE THE OBSERVED TRESPASSING LOCATIONS.

PLATFORM 2/3 AND 1. RAILWAY TRACKS BETWEEN PLATFORM 4 AND 3 AFTER A TRAIN
HAS LEFT FROM PLATFORM 4.

MRVC -2- Sir JJCOA Consultancy Cell


Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.

MRVC -3- Sir JJCOA Consultancy Cell


Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.

1.3 REASONS OF TRESPASSING ATNALASOPARA

 TO SAVE TIME AS THE WIDTH OF THE PLATFORMS ARE INSUFFICIENT TO CATER


TO THE OVERCROWDING ON THE PLATFORM ITSELF WHICH RESULTS INTO LOT
OF TIME BEING WASTED, IN REACHING THE PROVIDED FOB.

 THE HEIGHT OF THE FOB IS VERY HIGH AND HENCE IS UNCOMFORTABLE EVEN
FOR NORMAL HEALTHY PERSON TO USE IT.

 NUMBERS OF FOBS ARE INSUFFICIENT TO CATER TO THE PEAK HOUR NEEDS OF


PASSENGER TRAFFIC LEADING TO LOT OF OVERCROWDING ON THE FOB ITSELF.

 LACK OF FACILITIES FOR PHYSICALLY HANDICAPPED PEOPLE & SENIOR


CITIZENS; LIKE ESCALATOR, RAMP, ETC.

 SMALL RAMP AT BOTH THE ENDS OF THE PLATFORM ALSO ENCOURAGES


TRESPASSING.

 LAST MINUTE ANNOUNCEMENT OF CHANGE IN THE PLATFORM SCHEDULE FOR


ARRIVAL / DEPARTURE OF THE TRAIN.

 HUMAN SETTLEMENT ALONG THE TRACK ALSO LEADS TO REGULAR


TRESPASSING BY THE INHABITANTS.

 THERE ARE SMALL TIME VENDORS SELLING VEGETABLES & OTHER DAY-TO-DAY
USABLE PRODUCTS ALONG THE RAILWAY TRACKS IN THE VICINITY OF THE
PLATFORM AT EITHER END, THIS LEADS TO TRESPASSING.

 EXCEPTIONAL CIRCUMSTANCES LIKE MEDICAL EMERGENCY, PERSON WITH


HEAVY LUGGAGE, ETC. LEADS TO COMPULSORY TRESPASSING.

 RAG PICKERS ARE REGULAR TRESPASSERS.

 INADEQUATE HEIGHT OF FENCING BETWEEN TRACKS ENCOURAGES PEOPLE TO


JUMP FROM PLATFORM ON TO THE TRACK & CLIMB THE FENCING TO REACH THE
OTHER PLATFORM, THUS LEADING TO SERIOUS TRESPASSING.

MRVC -4- Sir JJCOA Consultancy Cell


Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.

 PEOPLE TRAVELLING WITHOUT PROPER TICKET TRESPASS IN ORDER TO AVOID


T.C.

 DURING PEAK HOURS IT IS EXTREMELY DIFFICULT TO BOARD A TRAIN FROM


THE PLATFORM SIDE BECAUSE OF WHICH THE PEOPLE GET INTO THE TRAIN
FROM THE OTHER SIDE USING EMERGENCY LADDER PROVIDED AT DOOR
CAUSING SERIOUS TRESPASSING.

 PEOPLE ARE ACCUSTOMED TO TRESPASSING AND IT HAS BECOME A DEFAULT


BEHAVIORAL TENDENCY.

MRVC -5- Sir JJCOA Consultancy Cell


Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.

CHAPTER 2

IDENTIFICATION OF TROUBLE SPOTS


A DETAILED STUDY FOR IDENTIFICATION OF TROUBLE SPOTS WAS CARRIED OUT
BY OUR TEAM WITH RESPECT TO AFORE MENTIONED REASONS FOR TRESPASSING.

2.1 IDENTIFIED TROUBLE SPOTS.

a. SOUTH END OF ALL THE PLATFORMS


b. AREA BETWEEN THE PLATFORM NO.1 AND 2/3

MRVC -6- Sir JJCOA Consultancy Cell


Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.

2.2 DRAWING INDICATING TROUBLE SPOT


IDENTIFIED TROUBLE SPOTS BASED ON ABOVE STUDY HAVE BEEN INDICATED IN THE
DRAWING NO:-
 JJC/MRVC/NAL_1

MRVC -7- Sir JJCOA Consultancy Cell


Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.

CHAPTER 3

SOLUTIONS

3.1 INTRODUCTION
THE MAGNITUDE OF THE TRESPASSING PROBLEM AND THE REASONS OF TRESPASSING
AT NALASOPARA STATION HAVE BEEN STUDIED AT INCEPTION REPORT STAGE WHICH
HAVE BEEN PRESENTED TO MRVC AND ALSO SUBMITTED AS INCEPTION REPORT.

IN PRIVIOUS CHAPTER TROUBLE SPOT HAVE BEEN INDENTIFIED WITH RESPECT TO


NALASOPARA STATION. HENCE SOLUTION TO DISCOURAGE TRESSPASSING HAVE BEEN
WORKED OUT KEEPING IN MIND THE FOLLOWING 5 MAIN POINTS.

 FOB
 RAILING
 R.C.C. WALL
 GREEN PATCH

MRVC -8- Sir JJCOA Consultancy Cell


Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.

3.2 SOLUTIONS TO DISCOURAGE TRESSPASSING AT NALASOPARA


1. PROVIDE RCC WALL AT BOTH ENDS OF PLATFORM NO. 4 BETWEEN RAILWAY
LAND AND ROAD. 200 M LONG.
PEOPLE TRESS PASS FROM THE AFORE MENTIONED SPOT TO ACCESS THE RESIDENTIAL COMPLEXES IN
THE EAST.

2. GREEN PATCH AT NORTH AND SOUTH END OF PLATFORM 2/3 BY 100 M.


TO PREVENT PEOPLE FROM TRESPASSING.

3. RAILING BETWEEN PLATFORM NO 1 AND 2.

4. PROVIDE FOB AT THE SOUTHERN END JOINING ALL PLATFORMS (ALREADY UNDER-
CONSTRUCTION)

5. SOUTHERN LANDINGS TO THE MIDDLE FOB JOINING ALL THE PLATFORMS.

EXISTING AMENITIES:

2 COMMERCIAL STALL, 1 TOILET ON PLATFORM NO 2/3.

SUGGESTED IMPROVEMENTS/ADDITIONS – AMENITIES:


SIGN AGE ON ALL PLATFORMS, FOBS, ENTRY/EXIT.

MRVC -9- Sir JJCOA Consultancy Cell


Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.

3.3 DRAWING INDICATING SOLUTIONS


PROPOSED SOLUTIONS BASED ON ABOVE STUDY HAVE BEEN INDICATED IN THE
DRAWINGS AS SHOWN IN DRAWING NO:-
 JJC/MRVC/S/NAL_1.

MRVC -10- Sir JJCOA Consultancy Cell


Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.

3.4 3D SKETCHES INDICATING SOLUTIONS


FOR BETTER APPRECIATION OF THE 2D DRAWINGS, 3D SKETCHES HAVE BEEN
PREPARED INDICATING THE PROPOSED SOLUTION.

GREEN PATCH AT NORTH END OF PLATFORM 2/3 BY 100 M.

MRVC -11- Sir JJCOA Consultancy Cell


Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.

PROVIDE RCC WALL AT BOTH ENDS OF PLATFORM NO.4-200M LONG.

MRVC -12- Sir JJCOA Consultancy Cell


Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.

CHAPTER 4

GENERAL ARRANGEMENT DRAWING


WITH RESPECT TO THE MAJOR SOLUTIONS AS STATED EARLIER GENERAL
ARRANGEMENT DRAWINGS (G.A.D.) HAVE BEEN PREPARED FOR ACTUAL EXECUTION
KEEPING IN MIND SCHEDULE OF DIMENSIONS (S.O.D.) RESTRICTION.

SOLUTIONS PERTAINING GREEN PATCHES, RAILING, R.C.C. WALLS HAVE BEEN


PROVIDED AS GENERAL STANDARD DRAWINGS.

A COST ESTIMATE HAS BEEN PREPARED BASED ON THE GENERAL ARRANGEMENT


DRAWINGS.

MRVC -13- Sir JJCOA Consultancy Cell


Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.

4.1 GENERAL ARRANGEMENT DRAWINGS


DETAILS OF THE PROPOSED SOLUTIONS HAVE BEEN INDICATED IN DRAWING NO:-
 JJC/MRVC/GAD/NAL_1.
.

MRVC -14- Sir JJCOA Consultancy Cell


Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.

CHAPTER 5

ESTIMATED COST
QUANTITES HAVE BEEN DERIVED BASED ON GENERAL ARRANGEMENT DRAWINGS
COST ESTIMATE HAS BEEN WORKED OUT AS PER THE RATES SPECIFIED BY M.R.V.C.

NALASOPARA
LENGTH OF
LOCATION OF RAILING RAILING WEIGHT/M COST/KG COST
BETWEEN PLATFORM NO. 1 AND 2 538 M 24 KG RS. 75 968400
BETWEEN PLATFORM NO. 3 AND 4 545 M 24 KG RS. 75 981000
TOTAL 1949400
LENGTH OF CROSS-
LOCATION OF RCC WALL RCC WALL SECTIONAL AERA COST/M3 COST
SOUTHERN SIDE OF PLATFORM
NO. 1 130 M 0.95M2 RS. 12000 1482000
NORTHERN SIDE OF PLATFORM
NO. 1 100 M 0.95M2 RS. 12000 1140000
SOUTHERN SIDE OF PLATFORM
NO. 4 156 M 0.95M2 RS. 12000 1778400
NORTHERN SIDE OF PLATFORM
NO. 4 163 M 0.95M2 RS. 12000 1858200
TOTAL 6258600
AREA OF
GREEN PERIMETER OF
LOCATION OF GREEN PATCH PATCH RAILING COST/M2 COST
SOUTH END OF PLATFORM NO. 2 &
3 969 SQ.M 219 M RS. 400 387600
NORTH END OF PLATFROM NO. 2 &
3 794 SQ.M 216 M RS. 400 317600
TOTAL 705200
LOCATION OF FOB WIDTH AREA COST/M2 COST
PROPOSED SOUTHERN FLIGHTS TO
THE MIDDLE FOB. (3 NOS) 2.2 93 M2
RS. 400000 3720000
TOTAL 3720000
TOTAL COST OF PROPOSED SOLUTION AT NALASOPARA STATION Rs.1,26,33,200
SAY Rs. 1.3

MRVC -15- Sir JJCOA Consultancy Cell


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

C WALL
ED RC
PROPOS

ED RAILING
PROPOS
TCH
EEN PA
ED GR
PROPOS

C WALL
ED RC
C PROPOS
D.W.

C WALL
ED RC
PROPOS

NG
ED RAILI
PROPOS

PATCH
ED GREEN
PROPOS

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

SCHEDULE

LEGEND

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

C WALL
ED RC
PROPOS

ED RAILING
PROPOS
TCH
EEN PA
ED GR
PROPOS

C WALL
ED RC
C PROPOS
D.W.

C WALL
ED RC
PROPOS

NG
ED RAILI
PROPOS

PATCH
ED GREEN
PROPOS

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

LEGEND
SOLUTIONS FOR NALASOPARA STATIONS
1. PROVIDE RCC WALL AT BOTH ENDS OF PLATFORM NO. 4 BETWEEN RAILWAY LAND
AND ROAD. 200 M LONG.
PEOPLE TRESS PASS FROM THE AFORE MENTIONED SPOT TO ACCESS THE RESIDENTIAL COMPLEXES IN THE EAST.

2. GREEN PATCH AT NORTH AND SOUTH END OF PLATFORM 2/3 BY 100 M.


TO PREVENT PEOPLE FROM TRESPASSING.

3. RAILING BETWEEN PLATFORM NO 1 AND 2.


4. PROVIDE FOB AT THE SOUTHERN END JOINING ALL PLATFORMS. (ALREADY
UNDER-CONSTRUCTION)
5. PROVIDE SOUTHERN LANDINGS TO THE MIDDLE FOB ON ALL PLATFORMS.

EXISTING AMENITIES:
2 COMMERCIAL STALL, 1 TOILET ON PLATFORM NO 2/3.

SUGGESTED IMPROVEMENTS/ADDITIONS - AMENITIES:


PROPOSED RCC WALL ON BOTH EAST & WEST SIDE ON SOUTHERN SIDE.
SIGN AGE ON ALL PLATFORMS, FOBS, ENTRY/EXIT.
PROPOSED GREEN PATCH ON SOUTHERN SIDE.
PROPOSED FOB ON SOUTHERN SIDE.