GENERAL NOTES:-

1. All dimensions in Feet &


A B C E F Inches.
2. Dimensions to be read, not
scaled.
BEAM SCHEDULE (M25:Fe500) (LEVEL: G.F.ROOF) 3. Clear cover to the main
reinf. as follows
10 BEAM SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT SHEAR STIRRUPS a) Col 25mm for 12mm bars &
B1 40mm for >12mm
NUMBERS B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT b) Footings 50mm

B1
B1 9" 12" 3-T12 3-T12 3-T12 3-T12 3-T12 3-T12 2L-T8@6" 2L-T8@6" 2L-T8@6" 4. Use M25Conc & Fe500
unless specified otherwise.

B2
9 B2 9" 12" 3-T16 3-T16 3-T16 3-T12 3-T12 3-T12 2L-T8@6" 2L-T8@6" 2L-T8@6"
5. Found. designed for GF+1
B1 B3 9" 12" 3-T16 3-T16 3-T16 3-T16 3-T16 3-T16 2L-T8@6" 2L-T8@6" 2L-T8@6" Flrs. only.
FS2 B4 9" 15" 3-T16 3-T16 3-T16 3-T16 3-T16 3-T16 2L-T8@5" 2L-T8@5" 2L-T8@5" 6. Footing CL to coincide with
3-T16 3-T16 3-T16 3-T12 3-T12 3-T12 2L-T8@6" 2L-T8@6" 2L-T8@6"
Column CL.
B5 9" 15"
8 7.SBC - 20-T/Sq.m
B6 9" 18" +
3-T20
+
3-T20
+
3-T20
+
3-T16
+
3-T16
+
3-T16 Removal of
2-T16 2-T16 2-T16 2-T12 2-T12 2-T12 2L-T10@4" 2L-T10@4" 2L-T10@4"
formwork(Shuttering)
B4

B4
FS2
3-T20 3-T20 3-T20 3-T20 3-T20 3-T20 1. Shuttering of any part of the
B7 9" 21" + + + + + + 2L-T10@4" 2L-T10@4" 2L-T10@4"
3-T16 3-T16 3-T16 2-T16 2-T16 2-T16 structure shall not be removed

B2
3-T20 3-T20 3-T20 3-T16 3-T16 3-T16
until the concrete attains 70%
B8 9" 21" + + + + + + 2L-T8@4" 2L-T8@4" 2L-T8@4" of the specified strength of
2-T12 2-T12 2-T12 2-T12 2-T12 2-T12
concrete at seventh day.
B1 B8 However the following
7 SCHEDULE OF SLAB REINFORCEMENT DETAIL NOTE:
minimum period after final
FS1 NAME OF THICKNESS REINFORCEMENT pour) shall be allowed before
FC B4 FC SLAB OF SLAB SHORTER SPAN LONGER SPAN
REMARKS removal of shuttering as per IS
INVERTED BEAM FS1 5" 8Y @6"C/C 8Y @8"C/C - - 10" SUNKEN SLAB 1489-1991 Part I & part II
A) Vertical side of shuttering
B2

5" 8Y @5"C/C 8Y @7"C/C - columns, Walls & beams - 24


B6

FS2
Hours
FS3 5" 8Y @6"C/C 8Y @7"C/C - i) At any cross section of the
FS4 FS4
member not more than 50%
4 FS4 5" 8Y @5"C/C 8Y @8"C/C -
of the Bars shall be lapped
ii) Laps shall be staggered with
B7

a minimum centre to centre


distance of 1.3 times lap
B2
B2

lenght of the bar for Tension


& Compression members
iii) Lap lenght shall be 50
B1 B3 9" times the diameter of the bar
3 for Tension & Compression
members

9"
FS1 iv) Laps in columns shall be
B1

FS1
provided at midheight of floor
B5
B5

B2 and not at slab level


v) Laps in beams and columns
L1 (CLEAR SPAN) L2 (CLEAR SPAN) shall be provided at the point
CURTAIL ROD 1st LAYER CURTAIL ROD 1st LAYER CURTAIL ROD 1st LAYER
L1/3 L1/3 L2/3 of contraflexure.
2 CURTAIL ROD 2nd LAYER
2" L1/4
CURTAIL ROD 2nd LAYER CURTAIL ROD 2nd LAYER
L1/4 2" 2" L2/4
vi) Welding of bars shall be
done as a stitch weld for 5
FS3
L1/3 (STIRRUPS) L1/3 (STIRRUPS) L2/3 (STIRRUPS) times diameter of bar and a gap
D

of 5 times higher diameter bar


B2

B2

0.1 L1 0.15 L1 0.15 L2 and bar using arc welding and


special electrodes after
obtaining written approval
from the structural designer
1 B2

GROUND FLOOR ROOF BEAM LAYOUT

STRUCTURAL ENGINEER
A. AHMAD ANAS PROPOSED RESIDENTIAL
M.TECH STRUCTURES BUILDING AT KALLIKUPPAM GROUND FLOOR ROOF SLAB DETAILS
+91-9941299565
ahmad22anas@gmail.com FOR Mr.Shiva