You are on page 1of 10

OFFSHORE INSTALLATION

MANUAL

FOR

LOGGS PLATFORM INSTALLATION

VOLUME 5

SUB-CONTRACTOR PROCEDURES

PROJECT NO.: 17.012

SHL.17.012.MA.001.5 Rev.A Page 1


COMPILATION OF MANUAL VOLUMES

Volume 1 Emergency Information Manual

Volume 2 Transportation and Installation Manual

Volume 3 Quality Control and Certification Manual

Volume 4 Welding and NDE Procedures

Volume 5 Subcontractor Procedures

Volume 6 Drawings

Volume 7 Additional Information

SHL.17.012.MA.001.5 Rev.A Page 2


TABLE OF CONTENTS
(Volume 5)

1.0 INTRODUCTION

2.0 SURVEY PROCEDURES

3.0 ROV PROCEDURES

4.0 GROUTING PROCEDURES

5.0 SCAFFOLDING PROCEDURES

6.0 PILE DRIVEABILITY STUDY

SHL.17.012.MA.001.5 Rev.A Page 3


CHAPTER 1 - INTRODUCTION

SHL.17.012.MA.001.5 Rev.A Page 4


1.0 INTRODUCTION

This document is project specific and will apply solely to Contract No. LRP-C-02,
Transportation and Installation of Jacket, Piles, Deck and Bridge for the Loggs Riser
Platform.
Seaway Heavy Lifting are undertaking these works, which will be referred to as the
Project.

The "Offshore Installation Manual" consists of the following Volumes:

Volume 1 Emergency Information Manual


Volume 2 Transportation and Installation Manual
Volume 3 Quality Control and Certification Manual
Volume 4 Welding and NDE Procedures
Volume 5 Subcontractor Procedures
Volume 6 Drawings
Volume 7 Additional Information

SHL.17.012.MA.001.5 Rev.A Page 5


CHAPTER 2 - SURVEY PROCEDURES

SHL.17.012.MA.001.5 Rev.A Page 6


CHAPTER 3 - ROV PROCEDURES

SHL.17.012.MA.001.5 Rev.A Page 7


CHAPTER 4 - GROUTING
PROCEDURES

SHL.17.012.MA.001.5 Rev.A Page 8


CHAPTER 5 - SCAFFOLDING
PROCEDURES

SHL.17.012.MA.001.5 Rev.A Page 9


CHAPTER 6 - PILE DRIVEABILITY
STUDY

SHL.17.012.MA.001.5 Rev.A Page 10

You might also like