Professional Documents
Culture Documents
MANUAL
FOR
VOLUME 5
SUB-CONTRACTOR PROCEDURES
Volume 6 Drawings
1.0 INTRODUCTION
This document is project specific and will apply solely to Contract No. LRP-C-02,
Transportation and Installation of Jacket, Piles, Deck and Bridge for the Loggs Riser
Platform.
Seaway Heavy Lifting are undertaking these works, which will be referred to as the
Project.