You are on page 1of 18

ENVIRONMENTAL MONITORING REPORT

(MONTHLY AUGUST 2021)

FOR

LARSEN AND TOUBRO LIMITED, ADDC PROJECT


D107604-PACKAGE-B,
ABU DHABI UAE.

Document No: VAIL-S20-552-REP-0007_Rev.A

PROJECT NO: VAIL-S20-552

This document is the property of VELOSI and shall be treated as CONFIDENTIAL. The document shall not be
copied or shown to third parties without prior consent by VELOSI
ENVIRONMENTAL MONITORING REPORT
ADDC PROJECT D107604 PACKAGE-B ABU DHABI

PROJECT NO: VAIL-S20-552 DOCUMENT NO. VAIL-S20-552-REP-0007_Rev.A

REVISION RECORD

ISSUE CONSULTANT APPROVAL COMPANY APPROVAL


REV DESCRIPTION
DATE PREPARED CHECKED APPROVED CHECKED APPROVED

Issued for
A 26-Aug-21 Review &
Comments
MA FR IKR

Page 2
ENVIRONMENTAL MONITORING REPORT
ADDC PROJECT D107604 PACKAGE-B ABU DHABI

PROJECT NO: VAIL-S20-552 DOCUMENT NO. VAIL-S20-552-REP-0007_Rev.A

TABLE OF CONTENTS
DEFINITIONS ........................................................................................................................... 4
ABBREVIATIONS..................................................................................................................... 6
1 EXECUTIVE SUMMARY .................................................................................................. 7
1.1 PROJECT NAME AND CONTACT PERSON ........................................................................ 8
1.2 REPORTING REQUIREMENTS ............................................................................................ 8
1.3 SUMMARY OF FINDINGS ..................................................................................................... 8
2 INTRODUCTION .............................................................................................................. 9
2.1 PROJECT SCOPE ................................................................................................................. 9
3 MONITORING COMMITMENTS AND STANDARDS ..................................................... 11
3.1 MONITORING STANDARDS ............................................................................................... 11
3.2 METHOD .............................................................................................................................. 12
3.3 MONITORING LOCATIONS ................................................................................................ 12
3.4 MONITORING RESULTS..................................................................................................... 13
3.5 WASTEWATER CHEMICAL ANALYSIS ............................................................................. 14
3.6 QUALITY ASSURANCE AND QUALITY CONTROL ........................................................... 15
4 NON-COMPLIANCE ...................................................................................................... 16
5 CONCLUSIONS ............................................................................................................. 16
APPENDIX-A: MONITORING PHOTOGRAPHS .................................................................... 17

LIST OF TABLES
Table 1-1: Project Proponent ....................................................................................................................... 8
Table 3-1 Air Pollutant Limits in Ambient Air ............................................................................................. 11
Table 3-2: Details of monitoring locations ................................................................................................. 12

LIST OF FIGURES
Figure 2-1 : Location Map ............................................................................................................................ 9

Page 3
ENVIRONMENTAL MONITORING REPORT
ADDC PROJECT D107604 PACKAGE-B ABU DHABI

PROJECT NO: VAIL-S20-552 DOCUMENT NO. VAIL-S20-552-REP-0007_Rev.A

DEFINITIONS

COMPANY LARSEN AND TOUBRO LIMITED


Velosi Asset Integrity and Engineering Consultancy Services
Environmental Consultant
LLC

Any element, compound, or mixture of elements and/or


compounds. A substance that possesses hazardous
Chemical
properties including but not limited to flammability, toxicity,
corrosivity, or reactivity.

An integrated series of elements for establishing policy,


Environment, Health, and objectives, plans, and arrangements for implementation and
Safety Management System continuous improvement in environment, health, and safety
performance.

Environmental Impact Systematic process of evaluating the environmental impacts


Assessment of an activity or process on the environment

Surroundings in which a nominated entity operates, including


Environment air, water, land, natural resources, flora, fauna, and humans
and their interrelation.

A measurement or reading that indicates the value is higher


Exceedance than the applicable limit for a particular pollutant or
measurement.

Mitigation Measures taken to reduce or limit the consequences or


undesirable effects of a potential hazardous event.

Monitoring Program A planned set of discharge monitoring activities.

Measurement of the properties of a material (such as a


Monitoring discharge) or (usually) the sampling of a material together
with immediate or subsequent analysis or other form of
measurement.

Generally, any substance introduced into the environment


Pollutant that adversely affects the usefulness of a resource or the
health of humans, animals, or ecosystems.

Generally the presence of a substance in the environment


Pollution that, because of its chemical composition or quantity,
prevents the functioning of natural processes and produces
undesirable environmental and health effects.

Procedure A documented series of steps to be performed in a logical


order for a defined operation or in a given situation.

Proponent The developer, permit applicant, company, or agency


associated with the proposed project.

A person designated by the proponent who, through the


Responsible Person appropriate training and experience in health and safety, is
competent to implement, oversee, and manage the
employer’s health and safety program.

Page 4
ENVIRONMENTAL MONITORING REPORT
ADDC PROJECT D107604 PACKAGE-B ABU DHABI

PROJECT NO: VAIL-S20-552 DOCUMENT NO. VAIL-S20-552-REP-0007_Rev.A

Rubbish, debris, garbage, and other discarded solid materials


Solid Waste resulting from the project that are not classified as hazardous
waste.

The identification serial number assigned to any chemical or


hazardous material by the United Nations (UN) Committee of
United Nations Number Experts on the transportation of these materials and
published in the UN’s recommendations on the transport of
dangerous goods.

Any material or by-product that is discarded by being


Waste abandoned (i.e., disposed of, burned, incinerated, recycled),
or considered inherently waste-like.

Page 5
ENVIRONMENTAL MONITORING REPORT
ADDC PROJECT D107604 PACKAGE-B ABU DHABI

PROJECT NO: VAIL-S20-552 DOCUMENT NO. VAIL-S20-552-REP-0007_Rev.A

ABBREVIATIONS

COC Chain of Custody


HSE Health, Safety & Environment
MoEW Ministry of Environment & Water
QHSSE Quality, Health, Safety, Security, Environment
TLV Threshold limit value
TWA Time Weighted Average
UAE United Arab Emirates
L&T Larsen & Toubro

Page 6
ENVIRONMENTAL MONITORING REPORT
ADDC PROJECT D107604 PACKAGE-B ABU DHABI

PROJECT NO: VAIL-S20-552 DOCUMENT NO. VAIL-S20-552-REP-0007_Rev.A

1 EXECUTIVE SUMMARY

Abu Dhabi Distribution Company (ADDC) awarded a contract to Larsen & Toubro Limited for the
Supply of Recycled Water along Abu Dhabi Al Ain Road - Construction of Pipelines from Main
Pump Station to Intermediate Pump Station - Package B” which can be briefly classified into
pipeline and tank construction. for pipeline construction the scope involves supply and installation
of recycled water transmission pipelines Installation (including internal & external protection) of 85
km of various diameters (DN 1600 mm, DN 1000 mm, DN 900 mm, DN 700 mm, DN 500 mm, DN
300 mm, DN 250 mm) between Main pump station and the chlorination Station. For Tanks, the
scope involves Structural Design and construction of new steel recycled water tanks at Bu Touq,
Al Wathbah Palace and Bal Dheba areas with capacities of 9000 m3, 8500 m3 and 7500 m3
respectively and access roads. Tank construction includes all site works, civil, mechanical,
electrical, instrumentation, & control works and all associated works.
Larsen & Toubro Limited, commonly known as L&T, is an Indian technology, engineering,
construction, manufacturing and financial services conglomerate headquartered in Mumbai,
Maharashtra, India. It was founded by two Danish engineers taking refuge in India. The company
has business interests in basic and heavy engineering, construction, realty, manufacturing of
capital goods, information technology, and financial services. As of 2020, L&T Group comprises
118 subsidiaries, 6 associates, 25 joint-venture and 35 joint operations companies.
Three key products/services which L&T is engaged in are: Construction and project-related
activity; manufacturing and trading activity; and engineering services. For administrative
purposes, L&T has been structured into five broad categories:
 Construction – this covers Buildings & Factories, Heavy Civil Infrastructure, Transportation
Infrastructure, Power Transmission & Distribution, Water & Effluent Treatment, Metallurgical
& Material Handling and Smart World & Communication;
 EPC Projects – this includes Hydrocarbon Engineering, Power and Power Development;
 Manufacturing – this includes Defense Equipment & Systems, Heavy Engineering,
Construction, Mining & Industrial Machinery, Industrial Valves and Electrical & Automation
Systems;
 Services – this includes Realty, Information Technology, Technology Services and Financial
Services.
 Others – this includes Hyderabad Metro, Infrastructure Development Projects and corporate
functions.
Velosi has been appointed by COMPANY to conduct the Environmental monitoring study of
pipeline near Al Wathba Site Area of Larsen and Toubro Site office. The following Environmental
Monitoring activities were carried on 18th August, 2021. The sample collected for wastewater
testing were sent to ISO: 17025 certified laboratory for further laboratory analysis.
 Ambient Air Quality Monitoring (01 Location/Point)
 Waste Water Analysis (01 Sample)

Page 7
ENVIRONMENTAL MONITORING REPORT
ADDC PROJECT D107604 PACKAGE-B ABU DHABI

PROJECT NO: VAIL-S20-552 DOCUMENT NO. VAIL-S20-552-REP-0007_Rev.A

1.1 PROJECT NAME AND CONTACT PERSON


The following table shows contact person’s detail of the facility:
Table 1-1: Project Proponent

Project Proponent

Facility Name Environmental Monitoring for ADDC Project-D107604 Package-B Abu


Dhabi.
Address P.O. Box 30803, Abu Dhabi, UAE.
Telephone No. Tel.: + 971 50 8314805
Contact Person Mr. Niyas Alayan
Designation HSE Engineer
Environmental Velosi Asset Integrity and Engineering Consultancy Services LLC
Consultant
Address 1104, Al Ghaith Tower, Hamdan Street, Abu Dhabi, UAE
Telephone No. +971 2 6349 815
Fax No. +971 2 6349 816

1.2 REPORTING REQUIREMENTS


To comply with regulatory requirements, COMPANY has appointed Velosi to conduct
environmental monitoring of their pipeline site facility. The followings are points/locations advised
by the client to conduct Ambient Air Quality and Waste water Sampling & analysis. The sample
collected for wastewater testing were sent to ISO: 17025 certified laboratory for further laboratory
analysis:
Ambient Air Quality Monitoring

 Bu Touq Tank Area


Waste Water Sample Analysis

 Zone 4

1.3 SUMMARY OF FINDINGS


The following is summary of findings:

Sr. No Location Scope of Monitoring Status

1 Bu Touq Tank Area Ambient Air Quality In Compliance

2 Zone 4 Waste water Analysis In Compliance

Page 8
ENVIRONMENTAL MONITORING REPORT
ADDC PROJECT D107604 PACKAGE-B ABU DHABI

PROJECT NO: VAIL-S20-552 DOCUMENT NO. VAIL-S20-552-REP-0007_Rev.A

2 INTRODUCTION

Abu Dhabi Distribution Company (ADDC) awarded a contract to Larsen & Toubro Limited for the
Supply of Recycled Water along Abu Dhabi Al Ain Road - Construction of Pipelines from Main
Pump Station to Intermediate Pump Station - Package B” which can be briefly classified into
pipeline and tank construction. for pipeline construction the scope involves supply and installation
of recycled water transmission pipelines Installation (including internal & external protection) of 85
km of various diameters (DN 1600 mm, DN 1000 mm, DN 900 mm, DN 700 mm, DN 500 mm, DN
300 mm, DN 250 mm) between Main pump station and the chlorination Station. For Tanks, the
scope involves Structural Design and construction of new steel recycled water tanks at Bu Touq,
Al Wathbah Palace and Bal Dheba areas with capacities of 9000 m3, 8500 m3 and 7500 m3
respectively and access roads. Tank construction includes all site works, civil, mechanical,
electrical, instrumentation, & control works and all associated works.

Figure 2-1 : Location Map


2.1 PROJECT SCOPE
Scope of works includes all works and services within the project plot limit and as required for
authority/developer connections and utilities.
The project Scope of work involves following Activities:
1. Proposed Pipelines between the Main Pump Station and the Chlorination Station.
 DN 1600 mm DI, C25, length 37.7 Km
 DN 1000 mm DI, C30, length 13.2 Km
 DN 900 mm DI, C30, length 10.1 Km
 DN 700 mm DI pipeline to Bal Dheba, C30, length 12.1 Km.
 DN 700 mm DI pipeline to Bu Touq, C30, length 10.01 Km.
 DN 500 mm DI pipeline to Al Wathba Palace, C40, length 1.2 km.
 DN 300 mm DI pipeline to Al Wathba (existing reservoir), C50, 0.8 Km.
 DN 250 mm DI pipeline to Al Wathba (existing reservoir), C50, 0.1 Km.
2. Construction of new steel recycled water tanks.

Page 9
ENVIRONMENTAL MONITORING REPORT
ADDC PROJECT D107604 PACKAGE-B ABU DHABI

PROJECT NO: VAIL-S20-552 DOCUMENT NO. VAIL-S20-552-REP-0007_Rev.A

 Capacity of Steel tank at Bu Touq : 9,000 m 3


 Capacity of Steel tank at Al Wathba Palace : 8,500 m 3
 Capacity of Steel tank at Bal Dheba : 7,500 m 3
Connection of Proposed Pipeline with Existing Reservoir

Page 10
ENVIRONMENTAL MONITORING REPORT
ADDC PROJECT D107604 PACKAGE-B ABU DHABI

PROJECT NO: VAIL-S20-552 DOCUMENT NO. VAIL-S20-552-REP-0007_Rev.A

3 MONITORING COMMITMENTS AND STANDARDS

3.1 MONITORING STANDARDS


Applicable air pollutants standards are sourced from UAE Federal Law No. 24 (Environmental
Protection and Development) 1999. This refers to the statutory document through section 3,
Chapter IV, “Protection against Air Pollution”, where Article 55 states that Enterprises and
establishments provide the necessary means of protection to the workers in accordance with
conditions of safety and occupational health including choice of machine, equipment’s and suitable
types of fuel, taking into consideration the time of exposure to such pollutants. Applicable air quality
standards is given in below table.
Applicable Noise standards sourced from Cabinet Decree (12) of 2006, Federal Environmental
Agency UAE, Regarding Regulation Concerning Protection of air from pollution, Annexure (6)
Allowable limit for noise.
Table 3-1 Air Pollutant Limits in Ambient Air

Maximum Allowable
Substance Symbol Average Time
Limits (g/m3)

350 1 hour

Sulphur Dioxide SO2 150 24 hour

60 1 year

30 (mg) 1 hour
Carbon Monoxide CO
10 (mg) 8 hour

400 1 hour
Nitrogen Dioxide NO2
150 24 hour

200 1 hour
Ozone O3
120 8 hour

230 24 hour
Total Suspended Particles TSP
90 1 year

Particulate Matter (with 10


microns or less in PM10 150 24 hour
diameter)

Lead Pb 1 1 year

Source: Federal Law. 2006. “Regulation for the Protection of Air from Pollution. “Council of
Ministers Decree No. 12, UAE.

Page 11
ENVIRONMENTAL MONITORING REPORT
ADDC PROJECT D107604 PACKAGE-B ABU DHABI

PROJECT NO: VAIL-S20-552 DOCUMENT NO. VAIL-S20-552-REP-0007_Rev.A

3.2 METHOD
Air Quality Monitoring:
Air Quality Analyser (Combined Sampler) was utilized to carry out Indoor Air Quality Analysis at
one (01) selected location as suggested by the COMPANY’s HSE Advisor. Air Quality Monitoring
was carried out for Temperature, Relative Humidity, Carbon Monoxide (CO), Carbon Dioxide
(CO2), Nitrogen Dioxide (NO2), Sulphur Dioxide (SO2), Ozone (O3), Particulate Matter (PM10) &
Total Organic Compounds (TVOC). Analyser was installed for Eight (08) hours at selected
locations to record the readings.

3.3 MONITORING LOCATIONS


Table 3-2: Details of monitoring locations

Monitoring Location

Serial No. Location Details

AAQM-01 Bu Touq Tank Area

Page 12
ENVIRONMENTAL MONITORING REPORT
ADDC PROJECT D107604 PACKAGE-B ABU DHABI

PROJECT NO: VAIL-S20-552 DOCUMENT NO. VAIL-S20-552-REP-0007_Rev.A

3.4 MONITORING RESULTS


AMBIENT AIR QUALITY MONITORING- AAQM-01

TITLE DETAILS

SAMPLING LOCATION Bu Touq Tank Area

Larsen and Toubro Limited Al Wathba Site Area, Abu Dhabi,


PROJECT SITE
UAE.

SAMPLE ID AAQM-01

SAMPLING DURATION 08 hours

SAMPLING DATE 18-August-21

TEMPERATURE0C 40

RELATIVE HUMIDITY % 34.5

OXYGEN [O]2 % 19.2

CARBON DIOXIDE [CO2]


288
ppm

WEATHER CONDITION CLEAR SUNNY

POLLUTANT CONCENTRATION IN THE AIR

PARAMETER METHOD UNIT RESULT LIMIT

PARTICULATE USEPA TITLE 40 CFR PART 50


µg/Nm3 126.4 150
MATTER [PM10] APPENDIX J: 2015/SOP WL-IP-033
TOTAL SUSPENDED USEPA TITLE 40 CFR PART 50
µg/Nm3 138.74 230
PARTICULATE [TSP] APPENDIX B: 2015/SOP WL-IP-033
SULPHUR DIOXIDE USEPA EQUIVALENT METHOD NO.
µg/Nm3 25.62 150
[SO2] EQS-0775-002:1975/SOP WL-IP-054
USEPA EQUIVALENT METHOD NO.
NITROGEN DIOXIDE
EQN-1277-026: 2003/SOP WL-IP- µg/Nm3 68.20 150
[NO2]
052
CARBON MONOXIDE
BSEN 14626/SOP WL-IP-076 mg/Nm3 <1.0 10
[CO]
USEPA TITLE 40 CFR PART 50
OZONE[O3] µg/Nm3 18.74 120
APPENDIX I: 2015

Page 13
ENVIRONMENTAL MONITORING REPORT
ADDC PROJECT D107604 PACKAGE-B ABU DHABI

PROJECT NO: VAIL-S20-552 DOCUMENT NO. VAIL-S20-552-REP-0007_Rev.A

3.5 WASTEWATER CHEMICAL ANALYSIS

Sample: Zone 4

Standard Limit Results


Parameter Method
(mg/L) (mg/L)
Arsenic(As) APHA 3120 B 5 0.09
Chromium, Total (Cr) APHA 3120 B 5 0.10
Copper(Cu) APHA 3120 B 5 ˂0.01
Iron (Fe) APHA 3120 B 50 ˂0.04
Lead (Pb) APHA 3120 B 5 ˂0.01
Manganese(Mn) APHA 3120 B 10 ˂0.06
Mercury(Hg) ICP-AES 0.5 ˂0.02
Nickel(Ni) APHA 3120 B 10 ˂0.04
pH @25°C APHA 4500 H+B 6-9 8.6
Selenium (Se) APHA 3120 B 10 ˂0.001
Silver(Ag) APHA 3120 B 5 ˂0.001
Total Dissolved Solids(TDS) APHA 2540 C 3000 2119
Total Suspended Solids (TSS) APHA 2540 D 500 415
Zinc(Zn) APHA 3120 B 10 ˂0.01
Biochemical Oxygen Demand
APHA 5210 B - 305
(BOD)
Chemical Oxygen Demand(COD) APHA 5220 B 1000 274
APHA 4500 NH3 B/
Total Kjeldahal Nitrogen 15 8.4
4500
Oil & Grease (Hydrocarbon) APHA 5520 B 60 15.6
Free Oil-Oil (Non-Hydrocarbon) APHA 5520 B 100 20.9
Total Sulphate APHA 4500 SO4 (2-) C 1000 98
Sulphide APHA 4500 S2- F 2 0.20
Turbidity APHA 2130 B - 09 mtu
Aluminium(Al) APHA 3120 B 100 ˂0.01
Cadmium(Cd) APHA 3120 B 1 ˂0.01
Cobalt(Co) APHA 3120 B 5 ˂0.01

Page 14
ENVIRONMENTAL MONITORING REPORT
ADDC PROJECT D107604 PACKAGE-B ABU DHABI

PROJECT NO: VAIL-S20-552 DOCUMENT NO. VAIL-S20-552-REP-0007_Rev.A

3.6 QUALITY ASSURANCE AND QUALITY CONTROL


All the instruments utilized in the environmental monitoring were calibrated to ensure the quality of
the measurements. The calibration (In-House) of some instruments were also completed before
the measurements. Chain of Custody (COC) for Waste Water Sample was also followed for quality
assurance.

Page 15
ENVIRONMENTAL MONITORING REPORT
ADDC PROJECT D107604 PACKAGE-B ABU DHABI

PROJECT NO: VAIL-S20-552 DOCUMENT NO. VAIL-S20-552-REP-0007_Rev.A

4 NON-COMPLIANCE

The environmental monitoring was conducted for ambient air quality and waste water sampling
analysis for Al Wathba Site Area. The samples collected of wastewater was sent to ISO: 17025
certified laboratory for further laboratory analysis. All the parameters monitored at site were in
compliance with applicable standards.

5 CONCLUSIONS

The following was concluded on the basis of environmental monitoring activities.

 The Ambient Air Quality carried out at one (01) Location/point all the parameters were found
to be within the compliance as per Cabinet Decree (12) of 2006, Federal Environmental agency
of UAE, Regarding Regulation Concerning Protection of Air from Pollution, and Annexure (8)
Ambient Air Quality Standards.
 The wastewater sampling and testing has been carried out of one (01) sample and all the
parameters were found within allowable limits.

Page 16
ENVIRONMENTAL MONITORING REPORT
ADDC PROJECT D107604 PACKAGE-B ABU DHABI

PROJECT NO: VAIL-S20-552 DOCUMENT NO. VAIL-S20-552-REP-0007_Rev.A

APPENDIX-A: MONITORING PHOTOGRAPHS

Page 17
ENVIRONMENTAL MONITORING REPORT
ADDC PROJECT D107604 PACKAGE-B ABU DHABI

PROJECT NO: VAIL-S20-552 DOCUMENT NO. VAIL-S20-552-REP-0007_Rev.A

PHOTOGRAPHS

Air Quality Monitoring

Bu Touq Tank Area

Zone 4 Near Madina Market

Page 18