The procedure followed in the load calculation for the design of Air Conditioning System
was based on the following reference books: ASHRAE GRP 158, ASHRAE 1981
FUNDAMENTALS, Hand book of Air conditioning systems Design by Carrier Air conditioning
Company and Trane Air Conditioning Manual
A. Equipment Selected
1. Air Conditioning System
ACCU Selection/ Specification
Make/Model No.
Make/Model No.
2/Second Floor
Sensible Cooling Capacity 52,667.38 BTU/HR
Latent Cooling Capacity 10,655.07 BTU/HR
Supply Air Flow 1522.4 CFM
Ventilation/ Fresh Air CFM
Entering Air Temperature 92 F DB, 82 F WB
Leaving Air Temperature 75 F DB, 50% RH
Air handling Unit Type Draw Throw Up-Blast Front
Fan Type Centrifugal Forward Curve
Electrical Power Supply 220 V/3-PH/60HZ
References:
th
3. Trane Air Conditioning Manual (57 printing December 1981)
*
2. Latitude : 13° - 27’22 N
5. Indoor Design Conditions (ASHRAE GRP 158, Art. 2.1 page 2.1)
① ②
Figure 1
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
SI MATERIAL RESISTANCE
B. Exterior Wall
1 5
Figure 2
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
1. Latitude-Month correction from ASHRAE GRP 158 Table 3.12 shows maximum value for
the month of June (i.e., N=6; E & W = -1; S = -7; Horizontal=0 for 16° N Latitude).
2. Fenestration load in this calculation is very minimal since exterior glasses in the North
wall are shaded and not exposed to direct sunlight. East & West walls do not contain
exterior glasses since locations are in the property lines and are fire rated walls.
3. Roof (A=1291FT²) & East Wall (A=254.2FT²) constitute the biggest areas for external
loads. Roof #1 (Table 3.7 page 3.18, ASHRAE GRP158) without suspended ceiling has
maximum CLTD @ 14:00 HRS (Table 3.8 page 3.19, ASHRAE GRP158). Group E (Table 3.9
page 3.20, ASHRAE GRP 158) East Wall has maximum CLTD @ 13:00 HRS (Table 3.10
page 3.21, ASHRAE GRP 158). The value of Group E East Wall CLTD @ 14:00 HRS is only
one (1) unit less than the CLTD value @ 13:00 HRS.
4. From the above analysis, TIME & MONTH for peak load shall be @ 14:00 HRS in JUNE.
Note: Items that require CLTD evaluation are; Roof, Exterior Walls & Fenestration
Areas (Glass).
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
From ASHRAE GRP 158 Table 3.8 page 3.19, corrected CLTD for Roof
Where:
TO=94°F–½(20°F)=94–10=84
From ASHRAE GRP 158 Table 3.10 page 3.21, corrected CLTD for Wall is:
@ 16°N latitude, 14:00 HRS in June & Group E wall; CLTD CORRare as follows:
N 13 + 6 - 1 = 18
S 24 + -7 - 1 = 16
E 37 + -1 - 1 = 35
W 14 + -1 - 1 = 12
From ASHRAE 1981 Fundamentals Handbook, Table 10 page 26.16, corrected CLTD
Therefore;
CLTDCORR = 16 °F or CLTDCORR = 15 °F
IV – Solar Load:
q = A x SC x SHGF x CLF
Where;
SHGF = Maximum Solar Heat Gain Factor for Specific Orientation of Surface.
From ASHRAE GRP 158 Table 3.26 page 3.37, for externally shaded glass & @ 16°N
latitude month of June, the SHGF (in BTU/HR-FT²) for the following orientations are:
For Glass without interior shading, medium room construction, north latitudes & @ 14:00 HRS,
V – Internal Loads
A. People
A. Sensible Load
Where:
No. = 20 - 30 persons/1000 FT² floor area (ASHRAE GRP 158, Table 5.3)
B. Lights
q = INPUT x CLF
Where :
CLF = Cooling Load Factor based on total hours of operation & time
For 14 hours operation with “a”=0.75 & “b” = C and 14 number of hours after light
A. Sensible
Where :
Δt = I
Δt = 94 °F – 78 °F = 16 °F
B. Latent
ΔW Where:
ΔW = Inside – Outside Air Humidity Ratio Difference, lbs H2O/lb dry air
WINSIDE = 0.0102 lbs H2O/lb dry air (@ 78°F DB & 50% RH)
WOUTSIDE = 0.021 lbs H2O/lb dry air (@ 94°F DB, 82°F WB)
ΔW = 0.021 - 0.0102
A. Roof
q = U x A x CLTD
Where :
q = 0.160 x 131.8 x 78
q = 1644.864BTU/HR
B. Walls
q = U x A x CLTD
Where :
q = 0.47 x90.6 x 18
q = 766.48BTU/HR
C. Glass
q = U x A x CLTD
Where :
q = 1.04 x 48.4 x 16
q = 805.38BTU/HR
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
q = A x SC x SHGF x CLF
Where:
A. North Glass
q = 767.75 BTU/HR
qSOLAR =1,071.20BTU/HR
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
A. People
A. Sensible Load
Where:
qS = 2 x 255 x 0.85
qS = 433.50BTU/HR
B. Light
Where:
q = 3.41 x 263.58 x 1
q = 898.81BTU/HR
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
IV – Infiltration Air
A. Sensible
QS = 1.10 x CFMOA x Δt
Where:
CFMOA = 18
QS = 1.10 x 18 x 16
QS=316.8 BTU/HR
QS = QL6447.89BTU/HR
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
A. Net Room Sensible (NRS) = Total Sensible (QS) + Duct Heat Gain (%
B. Net Room Latent (NRL) = Total Latent (QL) + Duct Heat Gain (% QL)
SHR = 0.816
G. ΔTS=TR - TS
ΔTS = 25 °F
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
Tonnage = 0.79 TR
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
Design conditions for Baao, Camarines Sur, Philippines Hour 14:00 Dream House
Latitude 13° - 27' N DB daily range 20°F Day June Engr. Joeffrey D.
Q
Outside 94
Inside 78
Differ. 16 1,598.94
I em
SHG = Sensible Heat Gain
LIVINGROOM
Wall
Wall
IO N
Wall
LOADS
NDU C
Wall
Roof
COOLING
CO
Glass
EXTERNA
Partition
L
Ceiling
Floor
Item
Glass
SOLAR
Glass
Glass 1,669.20
Glass
INTERNA
COOLINGLOAD
People
L
Elect'l. Eqpt.
Lights
Motors
Gas Eqpt.
IS
O
9001:
2008
S
2,319.4
5
Total Heating Qs x Safety
EL. HTR. = --------------------------------------------
316.80
3413
ROOMSUBTOTAL Q
S'
7,294.80 QL'
EL. HTR. = KW
VEN T.
VS = 1.10 x CFMOA x ΔT -------------------------------------------------------------------------------------------------------
VL = 4840 x CFMOA x 0.0108 ΔW It is recommended to use ASHRAE tables with this form.
IS
O
9001:
Design conditions for Baao, Cam. Sur, Philippines Hour14:00 LOAD CALCULAT IONS SHEET COOLING LOAD SUMMARY 2008
Latitude 13° -27' N DB daily range 20 °F Day June Sensible (BTU/HR) Latent (BTU/HR)
Q &Q
Summer Month Winte r
Date March 20, 2018 Sheet No. of S' L' → 4,803.15 1,450.90
DB °F WB °F RH W DB °F W W in lb Client Job Number Supply Duct .…..% Leak + ..….% Heat Gain 96.06 29.02
Outside 94 82 0.0210 74 vapor per Building Name : Dream Home Room :
Study Room Blower Motor Input ….………%
Inside 78 50% 0.0102 72 lb dry air Computed by : Joeffrey D. Bustinera Checked by : JDB Net Room Sensible (NRS) (Total of above) 4,899.21
Differ. 16 0.0108 2 Approved by : Net Room Latent (NRL) (Total of above) 1,479.91
Q
SHG = Sensible Heat Gain (per item) = Sensible Load
S Total Load = NRS + NRL 6,379.13
POLYTECHNICREPUBLIC
LHG = Latent Heat Gain (per item) QL Latent Load
= COOLING (Sen.) HEATING SHR = NRS / Total Load 0.768
Orien- Area, Temp. Diff. QS Supply Air Temp., °F (TS) 55.00
Item U
tation FT² (Corrected) BTU/HR. Room Design Temp., °F (TR) 78.00
STUDY
OF GR P
Wall S 16.00 Temp. S Supply CFM = NRS / 1.1 x ΔTS 194
ON
Diff. BTU/HR.
AD
CONDU
CT I
LI
M
R
O
O
R
A
S
ΔT
- % Safety Factor 749.58 % Safety Factor 226.43
SCHOOLURNCAMARINES
Ceiling ΔT 16 -
Floor ΔT 16 - - SENS (Equipt.) 5,746.78 LAT (Equipt.) 1,735.94
ROO
Infilt. & Vent. - Total Equipt. Load = SENS (Equipt.) + LAT (Equipt.)
M
ABUA,
Item Shade Coef. CLF Total Tonnage = Total BTU/HR ÷ 12000 = 0.62 TR
SUR
SO LAR
HUMIDIFICATION
Glass S 0.94 40 0.58 -
Steam/Vapour Required = M lb/hr
Glass E 0.94 46 0.31 - COOLING (Latent)
M = 60/v x CFMOA x ΔW
Glass W 24.20 0.94 46 0.29 303.46 QL (BTU/HR)
CF
Where : CFMOA = Outside Air CFM = M
SUM (SOLAR) 1,071.20 No. x LHG = QL
=Room Volume x Air Changes per HR / 60
People No. 2 x _255 SHGX 0.85 CLF 443.50 2 255 510.00
v = Specific Air Volume
COOLINGL
3.41 x
Misc.
Use minimum one air change per hour.
Motors 3600 x HP
-------------------------------------------------------------------------------------------------------
Elect'l. Eqpt. 3.41 x Wt. x CLF -
ELECTRIC HEATER SIZING
Gas Eqpt. No. x SHG x CLF -
CFMOA x 0.0108
IS
O
9001:
2008
Design conditions for Baao, Camarines Sur, Philippines Hour 14:00 COOLING LOAD SUMMARY
LOAD CALCULATIONS SHEET
Latitude 13° - 27' N DB daily range 20 °F Day June Sensible (BTU/HR) Latent (BTU/HR)
Summer Month r Date March 20 2018 Sheet No. of QS' & QL' → 1,450.90
DB °F WB °F RH W DB °F W W in lb Client Job Number Supply Duct .…..% Leak + ..….% Heat Gain 29.02
Outside 94 82 0.0210 74 vapor per Building Name : Dream Home Room Breakfast Room Blower Motor Input ….………%
:
Inside 78 50% 0.0102 72 lb dry air Computed by : Joeffrey D. Bustinera Checked by : JDB Net Room Sensible (NRS) (Total of above)
Differ. 16 0.0108 2 Approved by : Net Room Latent (NRL) (Total of above) 1,479.91
POLYTECHNICREPUBLIC
Q
SHG = Sensible Heat Gain (per item) S = Sensible Load Total Load = NRS + NRL 6,771.45
LHG = Latent Heat Gain (per item) QL = Latent Load COOLING (Sen.) Temp. HEATINGQS SHR = NRS / Total Load 0.781
Orien- Are, Temp. Diff. QS Diff. BTU/HR. Supply Air Temp., °F (T ) 55.00
Item U
S
OF GR P
Wall - Supply CFM = NRS / 1.1 x ΔTS 209
O
W 246.66 - NRL
AD
Wall E 123.40 0.470 3512.00 695.-98 COOLING EQUIPMENT LOAD 1,479.91
LOAD
S
Gain
Floor Item Shade Coef. ΔT 16 - Total - % Safety Factor 809.61 LAT (Equipt.) 1,735.94
L
S
Orien- Area, Max. Total Equipt. Load = 7,942.91 BTU/HR
0.66 TR
SCHOOLURNCAMARINES
Tonnage = Total BTU/HR ÷ 12000 =
R
Glass
S
Glass 0.94 40 0.58 - HUMIDIFICATION
ABUA,
Glass E 0.94 46 0.31 - COOLING (Latent) Steam/Vapour Required = M lb/hr
Glass W 0.94 46 0.29 303.46 QL (BTU/HR) M = 60/v x CFMOA x ΔW
Q
SUR
SUM (SOLAR) 1,071.20 No. x LHG = L Where : CFMOA = Outside Air CFM = CFM
People No. 2 x _255 SHG X 0.85 CLF 433.50 2 255 510.00 = Room Volume x Air Changes per HR / 60
INTERNAL
COOLINGL
Lights 3.41 x 2 Wt. x 145.24 x 1 Bal. & use factor 990.54 v = Specific Air Volume
OADS
L = 4840 x CFMOA x 0.0108 ΔW It is recommended to use ASHRAE tables with this form.
Glass
Glass
People
Lights
COOLINGLOA
Design conditions for Baao, Camarines Sur, Philippines Hour 14:00 COOLING LOAD SUMMARY
DS
Misc.
Q &Q
Summer Month Winter Date March 20, 2018 Sheet No. of S' L' → 8,928.31 2,515.90
KITCHENAND DINNINGROOM
DB °F WB °F RH W DB °F W W in lb Client Job Number Supply Duct .…..% Leak + ..….% Heat Gain 178.57 50.32
vapor per Building Name : Dream Home Room : Kitchen & Dining
Outside 94 82 0.0210 74
Inside 78 50% 0.0102 72
Differ. 16 0.0108
tation
Wall N
Wall S
T IO N
Wall E
LOADS
Wall
NDUC
W
COOL
ING
CO
Roof
EXTER
Glass
NAL
Partition
Door
Floor ΔT
SUM
Orien-
Item
R
tation
OLA
Glass N
Glass S
S
IS M = 60/v x CFMOA x ΔW
20
08
G
R
A
D
U
A
T
E
P
O
L
Y
T
E
C
H
N
I
C
O
F
C
THE
Q
S = 1.10 x 18 CFMOA x 16 ΔT 316.80 EL. HTR. = ----------------------------------------------
Q 3413
L = 4840 x _18 CFMOA x 0.0108 ΔW
Q S'
8,928.31 QL' EL. HTR. = KW
V
VEN T.
S = 1.10 x CFMOA x ΔT -------------------------------------------------------------------------------------------------------
Design conditions for Calabanga, Camarines Sur, Philippines Hour 14:00 LOAD CALCULAT IONS SHEET COOLING LOAD SUMMARY 2008
Latitude 14° -35' N DB daily range 20 °F Day June Sensible (BTU/HR) Latent (BTU/HR)
Summer Month Winter Date March 20, 2018 Sheet No. of QS' & QL' → 4,190.81 1,450.90
DB °F WB °F RH W DB °F W W in lb Client Job Number Supply Duct .…..% Leak + ..….% Heat Gain 83.82 29.02
Outside 94 82 0.0210 74 vapor per Building Name : Dream Home Room : Bedroom 1 Blower Motor Input ….………%
Inside 78 50% 0.0102 72 lb dry air Computed by :Joeffrey D. Bustinera Checked by : JDB Net Room Sensible (NRS) (Total of above) 4,274.62
Differ. 16 0.0108 2 Approved by : Net Room Latent (NRL) (Total of above) 1,479.91
SHG = Sensible Heat Gain (per item) QS = Sensible Load Total Load = NRS + NRL 5,754.54
POLYTECHNICREPUBLIC
Q
LHG = Latent Heat Gain (per item) L = Latent Load COOLING (Sen.) HEATING SHR = NRS / Total Load 0.743
Orien- Area, Temp. Diff. QS Supply Air Temp., °F (TS) 54.00
Item U
tation FT² (Corrected) BTU/HR. Temp. QS Room Design Temp., °F (TR) 78.00
Wall N 98.40 0.470 18.00 832.48 Diff. BTU/HR. TR-TS = ΔTS 24.00
Wall S 16.00 - Supply CFM = NRS / 1.1 x ΔTS 162
OF GR P
Wall E 74.20 0.470 35.00 1,220.59 COOLING EQUIPMENT LOAD
CON D U C T I O N
AD
W NRL
INGL
S
Infilt. & Vent.
Item Orien- Area, Max. CLF Total Equipt. Load = 6,750.07 BTU/HR
Sha de Coef.
SCHOOLURNCAMARINES
tation FT² SHG Tonnage = Total BTU/HR ÷ 12000 = 0.56 TR
ABUA,
Glass E 24.20 0.94 46 0.31 324.39 COOLING (Latent) Steam/Vapour Required = M lb/hr
SUR
SUM (SOLAR) 324.59 No. x LHG = QL Where : CFMOA = Outside Air CFM = CFM
People No. 2 x 255 SHG X 0.85 CLF 433.50 2 255 510.00 = Room Volume x Air Changes per HR / 60
GLOADS
COOLIN
Lights 3.41 x 2 Wt. x 96.83_ x 1 _ Bal. & use factor 660.38 - v = Specific Air Volume
Misc.
VL =4840 x CFMOA x 0.0108 ΔW It is recommended to use ASHRAE tables with this form.
IS
O
9001:
Design conditions for Baao, Camarines Sur, Philippines Hour 14:00 COOLING LOAD SUMMARY
LOAD CALCULAT IONS SHEET
Latitude 13° - 27' N DB daily range 20 °F Day June Sensible (BTU/HR) Latent (BTU/HR)
2008
Summer Month Winte r Date March 20, 2018 Sheet No. of QS' & QL' → 2,890.20 1,195.89
DB°F WB °F RH W DB °F W W in lb Client Job Number Supply Duct .…..% Leak + ..….% Heat Gain 57.80 23.92
Outside 94 82 0.0210 74 vapor per Building Name : Dream Home Room :
Maid's Room Blower Motor Input ….………%
Inside 78 50% 0.0102 72 lb dry air Computed by : Joeffrey D. Bustinera Checked by : JDB Net Room Sensible (NRS) (Total of above) 2,948.00
Differ. 16 0.0108 2 Approved by : Net Room Latent (NRL) (Total of above) 1,219.81
SHG = Sensible Heat Gain (per item) QS = Sensible Load Total Load = NRS + NRL 4,167.81
LHG = Latent Heat Gain (per item) Q
L = Latent Load COOLING (Sen.) HEATING SHR = NRS / Total Load 0.700
Supply Air Temp., °F (TS) 53.00
POLYTECHNICREPUBLIC
Item Orien- Area, U Temp. Diff. QS
(Corrected) BTU/HR. Room Design Temp., °F (TR) 78.00
FT²
131.20 Temp. QS TR-TS = ΔTS 25.00
Wall tationN 0.470 18.00 1,109.95
Diff. BTU/HR.
Wall S 60.22 0.470 16.00 452.85 Supply CFM = NRS / 1.1 x ΔTS 107
-
Wall E 35.00 - COOLING EQUIPMENT LOAD
IO
Wall 1,219.81
OF GR P
W 12.00 - NRL
S DU
LOAD
ΔT
CT
AD
- 58.96
COOLING
ΔT -
Vs
- 3,006.96 186.63
Ceiling ΔT 16 - Total above % Safety Factor
Floor ΔT 16 - % Safety Factor 451.04 LAT (Equipt.) 1,430.83
-
- SENS (Equipt.) 3,458.00
EXTERNA
SUM (CONDUCTION) 2,040.38 Total Equipt. Load = SENS (Equipt.) + LAT (Equipt.)
-
Orien- Area, Max. Total Equipt. Load = 4,888.84 BTU/HR
Item Sha de Coef. CLF Infilt. & Vent. Tonnage = Total BTU/HR ÷ 12000 = 0.41 TR
FT²
S
tation SHG
SCHOOLURNCAMARINES
Total
-------------------------------------------------------------------------------------------------------
Glass N 0.94 45 0.75 -
SO LA
ABUA,
Glass W 0.94 46 0.29 - QL (BTU/HR) M = 60/v x CFMOA x ΔW
SUM (SOLAR) 117.33 No. x LHG = QL Where : CFM OA = Outside Air CFM = CFM
SUR
People No. 1 x 255 SHG X 0.85 CLF 216.75 1 255 255.00
= Room Volume x Air Changes per HR / 60
Lights 2 Wt. x Bal. & use factor 586.99
INTERN
3.41 x 86.07 x 1 -
Gas Eqpt. No. x SHG x CLF
v = Specific Air Volume
L
A
Motors 3600 x HP
Use minimum one air change per hour.
Elect'l. Eqpt. 3.41 x Wt. x CLF -
-------------------------------------------------------------------------------------------------------
(INTERNAL LOADS)
SUM
803. 74
Total Heating Qs x Safety Factor
QS = 1.10 x 18 CFMOA _16 xΔT 316. 80 EL. HTR. = ----------------------------------------------
V
L = 4840 x CFMOA x 0.0108 ΔW
Q S' 2,890.20 QL' EL. HTR. = KW
-------------------------------------------------------------------------------------------------------
V
S = 1.10 x CFMOA x ΔT It is recommended to use ASHRAE tables with this form.
ROOM SUBTOTAL
VS = 1.10 x ΔT
T.
CFMOA x
VL = 4840 x CFMOA x ΔW
VEN
0.0108
C
Design conditions for Baao, Camarines Sur, Philippines Hour 14:00
O
O
L
LOAD CALCULATIONS SHEET
I
Latitude 13° -27' N DB daily range 20 °F Day June N
G
L
Summer Month
O
DB °F WB °F RH W A
Outside 94 82 D
Inside 78 50%
Differ. 16 S
U
SHG = Sensible Heat Gain (per item)
M
LHG = Latent Heat Gain (per item) M
A
TOILET1
Item Orien-
tation R
Wall N Y
Wall S Sens
W
Roof Blower Motor Input ….………%
LOADS
NDU C
Partition
Total Load = NRS + NRL
CO
G
Ceiling
SHR = NRS / Total Load
Floor
Supply Air Temp., °F (TS)
ERN
EXT
AL
Glass S
NRS 1,248.48 % Re
Glass E
% Return Duct Gain 24.97
Glass W
Vs -
Total above 1,273.46 %
People No. 0 % Safety Factor 191.02 L
COOLINGLOADS
3413
EL. HTR. = KW
V
----------------------------------------------------------------------------------------
o
l It is recommended to use ASHRAE tables with this form.
u
m
e
x
POLYTECHNICREPUBLIC
A
ir
C
h
a
OF GR P
n
g
AD
e
s
p
e
r
H
R
/
S
6
0
SCHOOLURNCAMARINES
v =
S
p
e
ABUA,
c
i
fi
SUR
c
A
ir
V
o
l
u
m
e
Te .
A m as 9
Or r p. s 4 575
e
ie a Di Q
n- , ff.
O
S
53. (Co BT
00 rre U/
Gl S
Design conditions for Baao, Camarines Sur, Philippines Hour 14:00 Ite as 0. 4 0.
tati cte HR
LOAD CALCULAIONS SHEET s 94 0 58
m on FT²U
S
Latitude DB daily range 20 °F Day June d) .
18 Gl
W .0 as 0.
Su all N 0 Tem Q s E 94
p. S
m M 1
m arc Sh 6
er
. 0
h ee 0
M
Wall S 0
.
20, t Gl
on Da 20 No as 9 4 0.
th r 13° 18 N. of
te- 27' 4 s W 4 6 29
6 SUM
2 3 People No. _0 x 255
W in 8. 35 .
COOLINGLOADS
DB °F WB °F RH W DB °F W lb Client Job Number _______ W 2 0.4 .0 8 Lights 3.41 x 2 Wt. x
Outside 82 0.0210 74
vapor per Dream House all E 0 70 0 9
N
94 Hallway
INTER NAL
:
lb dry
Building Name : Joeffrey D. Room by : M
Inside 78 0.0102 air Computed by : Engr. Checked JDB
COOLING
50% 72
ot
12
or 360
W .0 s 0x HP
HALLWAY
all W 0
IO
Ap
pr
Di Elec
ff 0.0 ov Ro t'l.
er 1 10 ed C
Eqp 3.4 Wt L
T
. 6 82 by : of
t. 1 x . x F -
S Ga SH
LOADS
H Gl 16
NDU C
s
G as Δ .0 Eq N G
= s T 0 pt. o. x x CLF
Se SIZI
ns Pa
NG
ibl rti Mis
e tio Δ c.
H n T16
ea (
= 1 I
t S
G e 5 N
ai ns 2 7 T
n ib D 1. . E
(p le oo 0 Δ 9 R
COOLING
0.4
er L N
CO
r 0 70 T16 2
ite o A
mQ a 1
Floor ΔT L
) S d ,
EXTER
S UM (CONDUCTION)
NAL
LH C Item Shade Coef. CLF
L 1
G O 5
O Infilt O
= M .& A 5
La L
I Ori a Vent D .
te .
nt N en- x. SU S 6
He G M) 5
at Are
Ga = ( H a,
Lat S Tot
in EA S QS = _18 CFM x _16 Δ
(p en e tati FT al
TI H 1. OA T
er t n on ²
N G 1
ite Lo .
m) QL ad ) G Gl N 0 4 0. 0
x
IS
= O
Q
48 CFM 9001:
L 40 x _18 OA
2008
COOLING LOAD SUMMARY
Sensible (BTU/HR) Latent (BTU/HR)
QS' & QL' → 940.89
VS Supply Duct .…..% Leak + ..….% Heat Gain 18.82
T.
= CF
Blower Motor Input ….………%
1. MO Net Room Sensible (NRS) (Total of above)
10 A x Net Room Latent (NRL) (Total of above) 959.71
x Total Load = NRS + NRL
POLYTECHNICREPUBLIC
= 3,095.85
VEN
OF GR P
Supply CFM = NRS / 1.1 x ΔTS 78
EQUIPMENT LOAD
AD
NRL 959.71
% Return Duct 19.19
NRS 2,136.15 V
L
% Return Duct 42.72
Total above 978.90
Vs
% Safety Factor 146.84
Total above 2,178.87
LAT (Equipt.) 1,125.74
% Safety Factor 326.83
Total Equipt. Load = SENS (Equipt.) LAT (Equipt.)
S
SENS (Equipt.) 2,505.70
SCHOOLURNCAMARINES
Total Equipt. Load = 3,631.44 BTU/HR
Tonnage = Total BTU/HR ÷ 12000 = 0.30 TR
ABUA,
-------------------------------------------------------------------------------------------------------
HUMIDIFICATION
Steam/Vapour Required = M lb/hr
M = 60/v x CFMOA x ΔW
SUR
Where : CFMOA = Outside Air CFM = CFM
=Room Volume x Air Changes per HR / 60
v = Specific Air Volume
Use minimum one air change per hour.
-------------------------------------------------------------------------------------------------------
ELECTRIC HEATER
-
Total Heating Qs x Safety Factor
EL. HTR. =
--------------------------------------------3413
EL. HTR. = KW
-------------------------------------------------------------------------------------------------------
It is recommended to use ASHRAE tables with this form.
IS
O
9001:
2008
Design conditions for Baao, Camarines Sur, Philippines Hour 14:00 LOAD CALCULATIONS SHEET
COOLING LOAD SUMMARY
Latitude 13° -27' N DB daily range 20 °F Day June Sensible (BTU/HR) Latent (BTU/HR)
Summer Month Winter Date March 20, 2018 Sheet No. of QS' & QL' → 2,890.31 940.89
DB °F WB °F RH W DB °F W W in lb Client Job Number Supply Duct .…..% Leak + ..….% Heat Gain 57.81 18.82
Outside 94 82 0.0210 74 vapor per Building Name : Dream House Room :
Mechanical Room Blower Motor Input ….………%
Inside 78 50% 0.0102 72 lb dry air Computed by : Engr. Joeffrey D. Bustinera Checked by : JDB Net Room Sensible (NRS) (Total of above) 2,948.12
Differ. 16 0.0108 2 Approved by : Net Room Latent (NRL) (Total of above) 959.71
SHG = Sensible Heat Gain (per item) QS = Sensible Load Total Load NRS + NRL 3,907.83
POLYTECHNICREPUBLIC
=
LHG = Latent Heat Gain (per item) QL = Latent Load COOLING (Sen.) HEATING SHR = NRS / Total Load 0.800
Q
Orien- Area, Temp. Diff. S Supply Air Temp., °F (TS) 57.00
Item U
tation FT² (Corrected) BTU/HR. Room Design Temp., °F (TR) 78.00
Wall N 18.00 TR-TS = ΔTS 21.00
Wall S 82.33 0.470 16.00 619.12 Supply CFM NRS / 1.1 x ΔTS 128
OF GR P
=
MECHANICALROOM
AD
Wall 618.60 Diff. BTU/HR. 959.71
W 109.68 0.470 12.00 NRL
Roof NRS 2,948.12 % Return Duct Gain 19.19
COOLIN LOADS
V
Glass 21.52 1.040 ΔT 16.00 358.09 % Return Duct Gain 58.96 L
Door 16.07 0.470 ΔT 16 120.86 Total above 3,007.08 % Safety Factor 146.84
Floor ΔT 16 - % Safety Factor 451.06 LAT (Equipt.) 1,125.74
3,458 . 14
EXTERN
TotalSENSEquipt(Equipt.Load.)
S
-
Item Orien- Area,
Sha de Coef.
Max. CLF Total Equipt. Load = 4,583.88 BTU/HR
SCHOOLURNCAMARINES
-
tation FT² SHG Tonnage = Total BTU/HR ÷ 12000 = 0.38 TR
N --- ---- ------------ ---- ------------ ---- ------------ ---- ------------ ---- ------------ ---- ------------ ----
0.94 40 -
ABUA,
Glass S 0.58 Total HUMIDIFICATION
O
SUR
Glass W 21.52 0.94 46 0.29 269.85 QL (BTU/HR) M = 60/v x CFMOA x ΔW
SUM (SOLAR) 269.85 No. x LHG = QL Where : CFMOA = Outside Air CFM = CFM
L COOLING
INTERNA
Lights 3.41 x 2 Wt. x 86.07 x 1 Bal. & use factor 586.99 v = Specific Air Volume
Motors 3600 x HP Use minimum one air change per hour.
Elect'l. Eqpt. 3.41 x Wt. x CLF - -------------------------------------------------------------------------------------------------------
Misc. -
SUM (INTERNAL LOADS) 586.99 Total Heating Qs x Safety Factor
Q
S = 1.10 x _18 CFMOA x _16 ΔT 316.80 EL. HTR. = ----------------------------------------------
VS = 1.10 x CFMOA x ΔT ----- ------------ ------- ------------ ------- ------------ ------- ------------ ------- ------------ ----------
CFMOA x 0.0108
IS
2008
Design conditions for Baao, Camarines Sur, Philippines Hour 14:00 COOLING LOAD SUMMARY
LOAD CALCULATIONS SHEET
Latitude 13° - 27' N DB daily range 20 °F Day June Sensible (BTU/HR) Latent (BTU/HR)
Summer Month Winte r Date March 20, 2018 Sheet No. of QS' & QL' → 7,903.60 1,570.89
DB °F WB °F RH W DB °F W W in lb Client Job Number Supply Duct .…..% Leak + ..….% Heat Gain 158.07 31.42
Outside 94 82 0.0210 74 vapor per Building Name : Dream House Room : Family Living Room Blower Motor Input ….………%
Inside 78 50% 0.0102 72 lb dry air Computed by : Engr. Joeffrey D. Bustinera Checked by : JDB Net Room Sensible (NRS) (Total of above) 8,061.68
POLYTECHNICREPUBLIC
Differ. 16 0.0108 2 Approved by : Net Room Latent (NRL) (Total of above) 1,602.31
SHG = Sensible Heat Gain (per item) Area, Q = Sensible Load Q SupplyTotalLoadAir Temp=.,NRS°F (T+S) NRL 9,66357..0098
Item Orien- US Temp. Diff. S
SHR = NRS / Total Load 0.800
LHG = Latent Heat Gain (per item) QL = Latent Load COOLING (Sen.) HEATING
tation FT² (Corrected) BTU/HR. Room Design Temp., °F (TR) 78.00
OF GR P
0.470 TR-TS = ΔTS 21.00
Wall S 16.00 Supply CFM = NRS / 1.1 x ΔTS 349
TIO N
AD
Wall E 114.80 0.470 35.00 1,888.46 COOLING EQUIPMENT LOAD
Wall W 12.00 Diff. BTU/HR. NRS 8,061.68 NRL 1,602.31
AD
LO
ND
UC
S
S
Door ΔT 16
AL
SCHOOLURNCAMARINES
% Safety Factor 245.15
LAT (Equipt.) 1,879.51
Floor ΔT 16 - -
Total Equipt. Load = SENS (Equipt.) + LAT (Equipt.)
SUM (CONDUCTION) 5,696.57 -
ABUA,
-
Total Equipt. Load = 11,335.85 BTU/HR
Orien- Area, Max. Infilt. & Vent.
Item Shade Coef. CLF
0.9
Total
SUR
Tonnage = Total BTU/HR ÷ 12000 = 4
tation FT² SHG TR
HUMIDIFICATION
Glass S 0.94 40 0.58 -
M = 60/v x CFMOA x ΔW
Glass W 0.94 46 0.29 QL (BTU/HR)
COOLINGLOADS
INTERNAL
Misc. -
VEN T. INFILT.
----------------------------------------------
3413
Q
S' 7,903.60 QL' EL. HTR. = KW
VS = 1.10 x CFMOA x ΔT -------------------------------------------------------------------------------------------------------
VL = 4840 x CFMOA x 0.0108 ΔW It is recommended to use ASHRAE tables with this form.
IS
O
9001:
2008
Design conditions for Baao, Camarines Sur, Philippines Hour 14:00 LOAD CALCULATIONS SHEET COOLING LOAD SUMMARY
POLYTECHNICREPUBLIC
Inside 78 50% 0.0102 72 lb dry air Computed by : Engr. Joeffrey D. Bustinera Checked by : JDB
Net Room Sensible (NRS) (Total of above) 2,429.72
Differ. 16 0.0108 2 Approved by : Net Room Latent (NRL) (Total of above) 959.71
SHG = Sensible Heat Gain (per item) QS = Sensible Load Total Load = NRS + NRL 3,389.43
LHG = Latent Heat Gain (per item) QL = Latent Load COOLING (Sen.) HEATING SHR = NRS / Total Load 0.700
Orien- Area, Temp. Diff. QS Supply Air Temp., °F (TS) 53.00
OF GR P
Item U Temp. QS
tation FT² (Corrected) BTU/HR. Diff. BTU/HR. Room Design Temp., °F (TR) 78.00
AD
Wall N 18.00 TR-TS = ΔTS 26.00
Wall S 16.00
Supply CFM 87
HALLWAY
S
SENS (Equipt.) 2,850.08
G
Door ΔT 16
- LAT (Equipt.) 1,125.74
SCHOOLURNCAMARINES
Floor ΔT 16 -
EXTERNA
ABUA,
Total Equipt. Load = 3,975.80 BTU/HR
tation FT² SHG Tonnage = Total BTU/HR ÷ 12000 = 0.33 TR
Glass N 0.94 45 0.75 -------------------------------------------------------------------------------------------------------
SOL A R
SUR
Glass S 0.94 40 0.58 - HUMIDIFICATION
SUM (SOLAR) 269.85 No. x LHG = QL Where : CFMOA = Outside Air CFM = CFM
Gas Eqpt. No. x
L
SHG x CLF -
People No. _0 x 316 SHG X _0.85 CLF 0 315 = Room Volume x Air Changes per HR / 60
Lights 3.41 x 2 Wt. x 86.07 x 1 Bal. & use factor 586.99 v = Specific Air Volume
Motors 3600 x HP Use minimum one air change per hour.
Elect'l. Eqpt. 3.41 x Wt. x CLF - -------------------------------------------------------------------------------------------------------
ELECTRIC HEATER SIZING
Misc. -
SUM (INTERNAL LOADS) 586.07 Total Heating Qs x Safety Factor
QS = 1.10 x _18 CFMOA x _16 ΔT 316.80 EL. HTR. = ----------------------------------------------
INFI LT .
.
2008
Design conditions for Baao, Camarines Sur, Hour 14:00 LOAD CALCULATIONS COOLING LOAD SUMMARY
Philippines SHEET
POLYTECHNICREPUBLIC
Inside 78 50% 0.0102 72 lb dry air Computed by Engr. Joeffrey D. Bustinera Checked by JDB
Net Room Sensible (NRS) (Total of above)
8,432.32
Differ. 16 0.0108 2
Approved by Net Room Latent (NRL) (Total of above) 1,479.91
SHG = Sensible Heat Gain (per item) QS = Sensible Load Total Load = NRS + NRL 9,912. 23
OF GR P
LHG = Latent Heat Gain (per item) QL = Latent Load COOLING (Sen.) HEATING SHR = NRS / Total Load 0.900
AD
Orien- Area, Temp. Diff. QS Temp. QS Supply Air Temp., °F (TS) 57.00
Item U
tation FT² Diff. BTU/HR.
BEDROOM2
Wall N 65.80 0.470 (Corrected) BTU/HR. Room Design Temp., °F (TR) 78.00
Wall S 18.00 554.98 TR-TS = ΔTS 21.00
ION
E
S
S
Roof 217.86 0.160 78.00 - Total above 8,600.97
COOLI
CO
402.69 VL
NG
SCHOOLURNCAMARINES
Partition ΔT
ABUA,
SUM (CONDUCTION)
Total Equipt. Load = 11,627.05 BTU/HR
Item Orien- Area, Shade Coef. Max. CLF
Tonnage = Total BTU/HR ÷ 12000 = 0.97 TR
S O LA R
SUR
Glass N 0.94 45 0.75 HUMIDIFICATION
-
Glass S 0.94 40 0.58
324.39 COOLING (Latent) Steam/Vapour Required = M lb/hr
Glass E 24.20 0.94 46 0.31
QL (BTU/HR) M = 60/v x CFMOA x ΔW
Glass W 0.94 46 0.29 324.39 No. x LHG = Q
L Where : CFMOA = Outside Air CFM = CFM
SUM (SOLAR) 433.50 2 255 510. = Room Volume x Air Changes per HR / 60
00
2
Use minimum one air change per hour.
AL
Motors 3600 x HP
- -------------------------------------------------------------------------------------------------------
Elect'l. Eqpt.
- ELECTRIC HEATER
Gas Eqpt. No. x SHG x CLF -
SIZING Misc.
1,919.31 Total Heating Qs x Safety Factor
SUM (INTERNAL
LOADS) 316.80 EL. HTR. = ----------------------------------------------
S' L'
VE
Latitude 13° - 27' N DB daily range 20 °F Day June Sensible (BTU/HR) Latent (BTU/HR)
Summer Month Winter March 20, 2018 Sheet No. of QS' & QL' → 4,056.06 1,450.89
Date
DB °F WB °F RH W DB °F W W in lb Client _ Job Number Supply Duct .…..% Leak + ..….% Heat Gain 81. 10
29.02
Inside 78 50% 0.0102 72 lb dry air Computed by Engr. Joeffrey D. Bustinera Checked JDB Net Room Sensible (NRS) (Total of above) 4,136. 16
: by :
Differ. 16 0.0108 2 Approved by : Net Room Latent (NRL) (Total of above) 1,479. 91
SHG = Sensible Heat Gain (per item) QS = Sensible Load Total Load = NRS + NRL 5,616. 91
LHG = Latent Heat Gain (per item) QL = Latent Load COOLING (Sen.) HEATING SHR = NRS / Total Load 0.700
Orien- Area, Temp. Diff. QS Temp. QS Supply Air Temp., °F (TS) 53.00
Item U
Diff. BTU/HR.
tation FT² (Corrected) Room Design Temp., °F (TR)
BTU/HR.
78.00
150
Wall E 35.00 -
COOLING EQUIPMENT
EXTERNA COOLING LOAD
- LOAD
T
-
418.49 NRL 1,479.91
Wall W 74.20 0.47 12.00 Infilt. &
CON
Total
Roof 112.96 0.160 1,409.74 % Return Duct Gain 29.60
78.00
NRS 4,136.16 V
402.69
L
L
Glass 24.20 1.040 ΔT 16.00 % Return Duct 82.72
Vs
Total above 4,218.89 Total above 1,509.51
Partition ΔT 16
Door ΔT 16 % Safety Factor 632.83 % Safety Factor 226.43
Floor ΔT 16 - SENS (Equipt.) 4,815.72 LAT (Equipt.) 1,735.93
SUM (CONDUCTION) Total Equipt. Load = SENS (Equipt.) + LAT (Equipt.)
2,230.92 Total Equipt. Load = 6,587.65 BTU/HR
Tonnage = Total BTU/HR ÷ 12000 = 0.56 TR
Glass S 0.94
IS
O
E 45 0.75
9001:
0.94 ----------------------------------------------------------
W ---------------------------------------------
25.20 40 0.58 -
2008
0.94 HUMIDIFICATION
46 0.31
COOLING (Latent)
Steam/Vapour Required = M lb/hr
46 0.29
QL (BTU/HR)
M = 60/v x CFMOA x ΔW
SUM (SOLAR) 303.46 No. x LHG = QL Where : CFMOA = Outside Air CFM = CFM
POLYTECHNICREPUBLIC
433.50 2 255 510.00 = Room Volume x Air Changes per HR /
People No. _2 x 255 SHG X _0.85 CLF
770.39 60 v = Specific Air Volume
Use minimum one air change per hour.
Lights 3.41 x 2 Wt. x 112.96 x 1 Bal. & use factor
- -------------------------------------------------------------------------------------------------------
OF
-
Motors 3600 x HP
Elect'l. Eqpt.
Misc.
SUM (INTERNAL
LOADS) QS = 1.10 x _18 CFMOA x _16 C
1,203.39 Total Heating Qs x Safety
VEN T. INFILT.
BEDROOM3
P
L = 4840x _18 CFMOA x _0.0108 ΔW 3413
ROOM SUBTOTAL QS' 4,056.06 QL' EL. HTR. = KW
VS = 1.10 x CFMOA x ΔT -------------------------------------------------------------------------------------------------------
VL = 4840x CFMOA x 0.0108 ΔW It is recommended to use ASHRAE tables with this form.
SCHOOLURNCAMARINES
ABUA,
SUR
IS
O
9001:
2008
Design conditions for Baao, Camarines Sur, Philippines Hour 14:00 LOAD CALCULATIONS SHEET COOLING LOAD SUMMARY
Latitude 13° - 27' N DB daily range 20 °F Day June Sensible (BTU/HR) Latent (BTU/HR)
Summer Month Winter Date March 20, 2018 Sheet No. of Q &Q →
S' L' 6,447.88 1,450.89
DB °F WB °F RH W DB °F W W in lb Client Job Number Supply Duct .…..% Leak + ..….% Heat Gain 128.96 29.02
REPUBLIC
Outside 94 82 0.0210 74 vapor per Building Name : Dream House Room :
BedRoom 4 Blower Motor Input ….………%
Inside 78 50% 0.0102 72 lb dry air Computed by : Engr. Joeffrey D. Bustinera Checked by : JDB
Net Room Sensible (NRS) (Total of above) 6,576.84 GRADUATE
SCHOOLAMARINESCOLLEGESPHILIPPINES
QS Supply Air Temp., °F (TS) 57.00
Item U
BEDROOM4
Diff. BTU/HR.
tation FT² (Corrected) BTU/HR. Room Design Temp., °F (TR) 78.00
SUR
Wall S 16.00 Supply CFM = NRS / 1.1 x ΔTS 285
CO ND CTIO N
-
Wall W 90.60 0.470 12.00 510.98 NRL 1,479.91
N
-
ABUACAMARINES
Infilt. & Vent.
Roof 131.79 0.160 78.00 1,644.74 % Return Duct Gain 29.60
Total 6,576.84
NRS
,
Glass 48.40 1.040 ΔT 16.00 805.38 % Return Duct Gain 131.54 VL
SUR
Vs
Total above 6,708.37
L
ING LOADS
TERNAL
Orien- Area, Max.
Item Shade Coef. CLF
HUMIDIFICATION
M = 60/v x CFMOA x ΔW
2008
Design conditions for Baao, Camarines Sur, Philippines Hour 14:00 COOLING LOAD SUMMARY
LOAD CALCULATIONS SHEET
Latitude 13° - 27' N DB daily range 20 °F Day June Sensible (BTU/HR) Latent (BTU/HR)
Summer Month Winter Date Q &Q
March 20, 2018 Sheet No. of S' L' → 7,163.50 1,450.89
DB °F WB °F RH W DB °F W W in lb Client Job Number Supply Duct .…..% Leak + ..….% Heat Gain 143.07 29.02
POLYTECHNICREPUBLIC
Outside 94 82 0.0210 74 vapor per Building Name : Dream House Room : MasterBedroom Blower Motor Input ….………%
Inside 78 50% 0.0102 72 lb dry air Computed by : Engr. Joeffrey D. Bustinera Checked by : JDB Net Room Sensible (NRS) (Total of above) 7,296.57
Differ. 16 0.0108 2 Approved by : Net Room Latent (NRL) (Total of above) 1,479.91
SHG = Sensible Heat Gain (per item) QS = Sensible Load Total Load = NRS + NRL 8,776.48
LHG = Latent Heat Gain (per item) QL = Latent Load COOLING (Sen.) HEATING SHR = NRS / Total Load 0.800
OF GR P
Orien- Area, Temp. Diff.
Item U QS Temp. QS Supply Air Temp., °F (TS) 57.00
MASTERBEDROOM
Diff. BTU/HR.
AD
tation FT² (Corrected)
BTU/HR. Room Design Temp., °F (TR) 78.00
Wall E 35.00 -
LOADS
S
-
SCHOOLURNCAMARINES
Wall W 12.00 -
COOLI
NRL 1,479.91
NG
ABUA,
Glass 12.10 1.040 ΔT 16.00
201.34 VL
SUR
% Return Duct Gain 145.93
Vs
Door 39.36 0.470 ΔT 16
295.99 Total above 7,442.50 % Safety Factor 226.43
% Safety Factor1,116.38
Floor ΔT 16
- SENS (Equipt.) 8,558.88 LAT (Equipt.) 1,735.93
SUM (CONDUCTION) 4,698.64 Total Equipt. Load = SENS (Equipt.) + LAT (Equipt.)
0.94
COOLING (Latent) Steam/Vapour Required = M lb/hr
Glass W 0.94 46 0.29 QL (BTU/HR) M = 60/v x CFMOA x ΔW
SUM (SOLAR) 383.87 No. x LHG = QL Where : CFMOA = Outside Air CFM = CFM
= Room Volume x Air Changes per HR / 60
v = Specific Air Volume
COOLING LOADS
Motors 3600 x HP
Elect'l. Eqpt. - -------------------------------------------------------------------------------------------------------
VL = 4840 x CFMOA x 0.0108 ΔW It is recommended to use ASHRAE tables with this form.
IS
O
9001:
2008
Design conditions for Baao, Camarines Sur, Philippines Hour 14:00 COOLING LOAD SUMMARY
LOAD CALCULATIONS SHEET
R
Inside 78 50% 0.0102 72 lb dry air Computed by : Engr. Joeffrey D. Bustinera Checked by : JDB Blower Motor Input ….………%
Net Room Sensible (NRS) (Total of above) 3,206.91
EPUBLICOF
Differ. 16 0.0108 2 Approved by Net Room Latent (NRL) (Total of above) 959.71
SHG = Sensible Heat Gain (per item) : Total Load = NRS + NRL 4,166.62
LHG = Latent Heat Gain (per item) Q S
COOLING (Sen.) HEATING SHR = NRS / Total Load 0.800
Orien- QS Temp. QS
Area, = Sensible Load QL =
Item Supply Air Temp., °F (TS) 57.00
Latent Load Diff. BTU/HR.
GRADUATECPOLYTECHNIC THE
tation FT² BTU/HR.
U Temp. Diff. Room Design Temp., °F (TR) 78.00
AMARINESCOLLEGESPHILIPPINES
Wall N TR-TS = ΔTS 21.00
TOILET2
(Corrected)
18.00
Wall S Supply CFM = NRS / 1.1 x ΔTS 139
NDUC TIO N
16.00
-
Wall E COOLING EQUIPMENT LOAD
EXTERNAL COOLING LOADS
S
35.00 -
Wall W 45.17 0.470 12.00 254.76
SCHOOLURNCAMARINES
Infilt. & Vent. NRL 959.71
Roof 56.46 0.160 78.00 2,069.82 % Return Duct Gain 19.19
CO
Total
NRS 3,206.91
Glass 4.03 1.040 ΔT 16.00 67.06 % Return Duct Gain 64.14 VL
ABUA,
Vs
Total above 3,271.05
Partition ΔT 16 Total above 978.90
% Safety Factor 490.66
Door ΔT 16 % Safety Factor 146.84
SUR
SENS (Equipt.) 3,761.71
Floor ΔT 16 - LAT (Equipt.) 1,125.74
SUM (CONDUCTION) 2,391.64 Total Equipt. Load = SENS (Equipt.) + LAT (Equipt.)
Total Equipt. Load = 4,887.45 BTU/HR
Max. Tonnage = Total BTU/HR ÷ 12000 = 0.41 TR
Orien- Area,
Item Shade Coef. CLF
Glass S
SO LA
50.53 QL
INTERNAL
DB °F WB °F RH W DB °F W W in lb Client Job Number Supply Duct .…..% Leak + ..….% Heat Gain 98.44 18.82
Outside 94 82 0.0210 74 vapor per Building Dream Room : Toilet 3 Blower Motor Input ….………%
Name : House
Inside 78 50% 0.0102 72 lb dry air Computed by Engr. Joeffrey D. Bustinera Checked JDB Net Room Sensible (NRS) (Total of above) 5,020.33
: by :
Differ. 16 0.0108 2 Approved by : Net Room Latent (NRL) (Total of above) 959.71
SHG = Sensible Heat Gain (per item) QS = Sensible Load Total Load = NRS + NRL 5,980.04
LHG = Latent Heat Gain (per item) QL = Latent Load COOLING (Sen.) HEATING SHR = NRS / Total Load 0.800
Item Orien- Area, U Temp. Diff. QS Temp. QS Supply Air Temp., °F (TS) 57.00
Diff. BTU/HR.
tation FT² (Corrected) Room Design Temp., °F (TR) 78.00
BTU/HR.
Wall S 114.8 0.47 863.30 Supply CFM = NRS / 1.1 x ΔTS 217
DUCT IO
16.00 -
EXTERNAL COOLING LOADS
-
Wall E 35.00 - COOLING EQUIPMENT LOAD
Infilt. & Vent.
CON
NRS 5,020.33
Glass 4.03 1.040 ΔT 16.00 67.06 VL
% Return Duct 100.41
Vs
Partition ΔT 16 Total above 5,120.74 Total above 978.90
Door ΔT 16 % Safety Factor 768.11 % Safety Factor 146.84
Floor ΔT 16 - SENS (Equipt.) 5,888.85 LAT (Equipt.) 1,125.74
SUM (CONDUCTION) Total Equipt. Load = SENS (Equipt.) + LAT (Equipt.)
3,527.33
Item Orien- Area, Shade Coef. Max. CLF Total Equipt. Load = 7,014.59 BTU/HR
POLYTECHNICREPUBLIC
People No. _0 x 315 SHG X _0.85 CLF 0 255 =Room Volume x Air Changes per HR /
Lights 3.41 x 2 Wt. x 150.62 x 1 Bal. & use factor 1,027.23 60 v = Specific Air Volume
Motors 3600 x HP Use minimum one air change per hour.
Elect'l. Eqpt. - -------------------------------------------------------------------------------------------------------
Gas Eqpt. No. x SHG x CLF - ELECTRIC HEATER SIZING
Misc. -
OF GR P
SUM (INTERNAL
AD
LOADS) QS =1.10 x _18 CFMOA x _16
1,027.23 Total Heating Qs x Safety
ΔT 316.80 EL. HTR. = --------------------------------------------
TOILET3
4,921.89 QL'
ROOM SUBTOTAL QS' EL. HTR. = KW
VS = 1.10 x CFMOA x ΔT -------------------------------------------------------------------------------------------------------
VL = 4840 x CFMOA x 0.0108 ΔW It is recommended to use ASHRAE tables with this form.
SCHOOLURNCAMARINES
ABUA,
SUR
IS
O
9001:
SUMMARYOFLOAD CALCLATIONINCENTRALIZE TWOSTORY BUILDING
2008
FIRST FLOOR TONNAGE CFM SENS Total LoadTotal CFM DIFFUSER SIZE RECTANGULAR DUCT
Livng Room 0.9 307 8,727.08 10,768 334.08 9" x 9" 9" x 6"
Hallway 0.3 78 2,505.70 3,361.44 84.88 6" x 6" 6" x 6"
Study Room 0.62 194 5,746.78 7,482.72 211.11 9" x 9" 9" x 6"
POLYTECHNICREPUBLIC
Bedroom 1 0.56 162 5,014.13 6,750.07 176.29 9" x 9" 9" x 7"
Maid's Room 0.41 107 3,458.00 4,888.84 116.44 6" x 6" 6" x 6"
OF GR P
Toilet 1 0.22 29 1,464.48 2,590.22 31.56 6" x 6" 6" x 6"
AD
Breakfast Room 0.66 209 6,206.98 7,942.91 227.44 9" x 9" 9" x 9"
Kitchen & Dinning Room 1.14 360 10,682.37 13,692.54 391.76 12" x 12" 12" x 7"
Mechanical Room 0.38 128 3,458.14 4,583.88 139.29 6" x 6" 6" x 6"
S
SECOND FLOOR
SCHOOLURNCAMARINES
Family Living Room 0.94 349 9,456.34 11,335.85 379.79 9" x 9" 9" x 6"
Hallway 0.33 87 2,850.06 3,975.80 94.67 6" x 6" 6" x 6"
ABUA,
Bedroom 2 0.97 365 9,891.11 11,627.05 397.2 12" x 12" 12" x 6"
SUR
Bedroom 3 0.55 150 4,851.72 6,587.65 163.23 9" x 9" 9" x 6"
Bedroom 4 0.79 285 7,714.63 9,450.56 270.97 9" x 9" 9" x 7"
Master Bedroom 0.86 316 8,558.88 10,294.81 343.88 12" x 12" 12" x 7"
Toilet 2 0.41 139 3,761.71 4,887.45 151.26 6" x 6" 6" x 6"
Toilet 3 0.58 217 5,888.85 7,014.59 236.14 9" x 9" 9" x 6"
TOTAL 10.62 3482 100,236.96 127,234 3749.99
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
CHAPTER II
Calculation:
a.) Determine the supply air temperature (� ):
��
: By Energy Balance:
��=3,482
�
CFM
78℉ DB
�� =6303
��
CFM
�=?
��= 120
94℉ DB
CFM
By Ashrae Formula:
�= � + � ��������
� � (� − �)
���� ��� �
�
120 �
�=78+ 3750 �
(94 − 78)
Solve for Total Heating Capacity (THC) for 79℉ DB &66 ℉ WB Entering air @ 79℉ DB and 62℉ WB
Total Heating Capacity @ 79℉& 62 WB
62 ----------------137.3
66 ------------- THC
67--------------- 148.6
75 -------------- 109.1
79 -------------- SHC
80 -------------- 124.6
75 --------------- 88.4
79 --------------- SHC
80 -------------- 103.9
62 ------------- 121.33
66 ----------
���
67 ------------- 100.60
� = ���. �� �
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
AHU: 40RUAA14AIA5-0AIA0
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
APPENDICES
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
Appendix 1A DUCTING
DESIGN LAYOUT
Appendix 1B
TALBLE 1
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
Appendix 1C
DUCT SIZER
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
Appendix 1D
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
Appendix 1E
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
APPENDIX 2A
Article 1
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
TABLE 2
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
TABLE 3
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
TABLE 4
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
TABLE 5
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
TABLE 6
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
TABLE 7
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
TABLE 8
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
TABLE 9
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
TABLE 10
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
DESIGN OF
CENTRALIZED AIR CONDITIONING SYSTEM
FOR A TWO STORY RESINDENTIALHOUSE
AT
BAAO, CAMARINES SUR
Prepared by;
2018
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
A Design Project
Presented to
The Faculty of Graduate School
Camarines Sur Polytechnic Colleges Nabua,
Camarines Sur, In Partial Fulfillment of the
Requirements for the Degree
Master of Engineering
Prepared by:
2018
REPUBLIC OF THE PHILIPPINES CAMARINES SUR
POLYTECHNIC COLLEGES NABUA,
CAMARINES SUR
GRADUATE SCHOOL
ISO 9001:2008
CURRICULUM VITAE
UNIVERSITY OF NORTHEASTERN
PHILIPPINES Iriga City
POSITION: Part Time Course Instructor (CEA & College of Education)
June 21, 2016 up to present