You are on page 1of 4

Document No.

NAME:

LOCATION: Issue Date

RADIATION INSPECTION REPORT Page 1 of 4

CUSTOMER : Star Pipe Products

RADIATION INSPECTION REPORT


Inspection Details
Company Name & Address

Inspection Location

Invoice No and Inspection Date


Description of Cargo D.I. CASTING
Scope of Inspection 1)To check the radiation level
- Background Radiation
- Product Radiation
- Empty Container Radiation
- Container Loading Radiation
Declaration :- This inspection has been carried out without prejudice to the best of our knowledge
and ability without any guarantee on condition or operability of equipment/Machinery and only and
reflects opinion at the time of inspection,and is not intended to relieve buyer, or any stakeholder
from their direct or indirect contractual or statutory/legal liabilities and responsibilities.Our liability
to all stake holders including buyers and Bank is expressly excluded for any reasons related to quality
or quantity of cargo for the scope of this certificate.

Findings:-
1) The consignment was checked for radiation level and it does not have radiation levels
(gamma and neutron) in excess of natural background . The radiation level of the consignment is
within the accepted range.

- Background Radiation - 14(µR/h)


- Product Radiation - 5(µR/h), 3(µR/h), 5(µR/h)
- Empty Container Radiation – 07(µR/h),7(µR/h)
- Container Loading Radiation -07(µR/h), 08(µR/h)
2) Details of radiation survey meter used in the inspection :

- Make : Pulsecho Systems (Bombay) Pvt. Ltd


- Model : Smartrad-Micro
- Serial No. H-0535, Mfg :H19
- Last date of calibration : 02/08/2020
3) Photographs taken during the inspection as Annex - 1
Document No.

Issue Date

RADIATION INSPECTION REPORT Page 2 of 4

CUSTOMER : Star Pipe Products

Annex - 1

1) Ready For Packing. 2)Ready For Packing.

3)Finish Product. 4)Finish Product.


Document No.

Issue Date

RADIATION INSPECTION REPORT Page 3 of 4

CUSTOMER : Star Pipe Products

5) Empty Container. 6) Empty Container.

7) After Container Loading. 8) After Container Loading.


Document No.

Issue Date

RADIATION INSPECTION REPORT Page 4 of 4

CUSTOMER : Star Pipe Products

9) After Packing. 10) After Packing..

11)Surrounding Radiation.

For