S.NO.

TASKS DURATION (days)

1 Gather the team required to carry out the 3


project
2 Create project outline and research the site 2

3 Space plan design by architect 2

4 Meeting with contractor and architect to 1


bring them on board
5 Renovations for the building flooring and 20
walls
6 Insulation 2

7 Dry wall 1

8 Tile work 5

9 Sample Material checking 1

10 Consult with interior designer 1

11 Bring out furniture for the art gallery 2

12 Paint the interior space 4

13 Install light fixtures 2

14 Set-up gift shop 2

15 Finishing touches 1
Sample Material Paint the interior Consult with
Insulation Dry wall
checking space interior designer

Renovation
Finish
project

CRITICAL PATH

Create project Space plan Meeting with


Gather the
outline and design by contractor and
team
research the site architect architect

Renovations for
Install light Set-up gift furniture for the
the building Tile work
fixtures shop art gallery
flooring and walls
NARRATIVE:

With some research on the internet, the critical path created above reflects the crucial tasks
and the time duration that they will need. It sums up the tasks from the beginning The total
time taken to complete the sequence along this critical path would give you an idea of the
project’s minimum duration.The project will commence when the project manager has
gathered all the team members to start the renovation process after that each task is
allocated according to the expertise of each member, the foundation of this renovation will
be laid by the architect as his/her plan will determine the space plan after examining the
site. This process will further decide the amount of work that the contractor will follow and
so on. These scheduled activities must be performed if the project is to be considered a
success. Moreover, they must be completed in a specific order