1.0 INTRODUCTION
1.1 BACKGROUND INFORMATION
Oki/Oziengbe South field straddles NPDC OML 111 and Enageed Resource Limited OPL 274 in the
onshore terrain of the Northern depo belt of Niger Delta basin of Edo State. It is located at
approximately 18km west of Nigerian Petroleum Development Company (NPDC) Oredo field.
As part of the 2013 drilling campaign on the field, 2 wells were drilled, with Oki/Oziengbe South 4
(OKOS 004) completed as dual selective and Oki/Oziengbe South 5 (OKOS 005) yet to be
completed, but planned as a dual zone completion.
.
The OKOS 004 flowlines shall be hooked up and commissioned while OKOS 005 will be blinded off
at the wellheads cellar awaiting the well completion but installed to the existing inlet manifold at the
Oziengbe South flow station
b. Preparation of all calculations and all general and detailed designs and drawings required to
re-engineer,
re-engineer, fabricate, construct and commission the flow lines.
c. Preparation of Material Take off (MTO), specifications, data sheets and the supply of all
materials, plant and equipment required for the works.
PROJECT TITLE:
OKI / OZIENGBE SOUTH FLOWLINES EPCI PHASE 1 PROJECT ���� � �� ��
DOCUMENT
DOCUMENT NUMBER: OKOS-DML-FWL-ST-EC-01-0002 Contract No:
d. Preparation of planning schedules and programmes covering every aspect of the contract
using a computer programme, which allows for critical path analysis, updating and
rescheduling. This programme shall be submitted to the Engineer within 15 days of issue of
the Letter of intent, and up-dated as required thereafter.
f. Preparation of Pre-commissioning
Pre-commissioning and Commissioning Manuals giving procedures,
instructions and details for the operation and maintenance of all flow line provided under the
contract.
k. Testing, commissioning and start-up of the Works shall be, as far as is possible, integrated
with the overall commissioning of the project.
PROJECT TITLE:
OKI / OZIENGBE SOUTH FLOWLINES EPCI PHASE 1 PROJECT ���� � �� ��
DOCUMENT
DOCUMENT NUMBER: OKOS-DML-FWL-ST-EC-01-0002 Contract No:
3.0 SCOPE
The general civil/structural scope for the detailed design works includes the design of the f ollowing:
Civil plot plan
Steel structural Analysis for pipe support structural members.
Concrete foundation design calculation and detailed drawings for supports.
Foundation Design calculation report and detailed drawings for Inlet Manifold skid
Foundation Design calculation report and detailed drawings for Chemical Injection
skid
Material Take off
3.1 DEFINITIONS
OWNER: The party that initiates the project and ultimately pays for its
design and construction; in this case, ENAGEED “Company”
CONTRACTOR: The party that carries out the Engineering, Procurement and
Construction of the project; that is DONMAC Limited
3.2 ABBREVIATIONS
EN European Norms
EPIC Engineering,
Engineering, Procurement, Installation and Commissioning
OKOS-DML-FWL-CV-SPC-01-0001
OKOS-DML-FWL-CV-SPC-01-0001 Specification for Concrete Works.
OKOS-DML-FWL-CV-SPC-01-0002
OKOS-DML-FWL-CV-SPC-01-0002 Specification for foundation works
The regulations, codes and standards listed shall be applied in the following order of
priority:
• Project Specification
• Shell DEPs'
• Industry Standards.
PROJECT TITLE:
OKI / OZIENGBE SOUTH FLOWLINES EPCI PHASE 1 PROJECT ���� �� �� ��
DOCUMENT
DOCUMENT NUMBER: OKOS-DML-FWL-ST-EC-01-0002 Contract No:
Major structural elements of the civil structures shall be designed for a minimum effective life of 25
years.
γ = weight density
w = Moisture content
NA = Not Available
PROJECT TITLE:
OKI / OZIENGBE SOUTH FLOWLINES EPCI PHASE 1 PROJECT ���� �� �� ��
DOCUMENT
DOCUMENT NUMBER: OKOS-DML-FWL-ST-EC-01-0002 Contract No:
The design calculations were carried out according to the procedures given in the reference codes
and standards. The Limit State design approach was used.
Spreadsheets were utilized for the calculations. Adequate sizing of the foundation members and
reinforcement
reinforcement steel was provided as per requirements
requirements of reference codes and standards.
The detailed design calculations for the Inlet Manifold foundation are presented below.
`
M = 1600
(4'' pipe)
12 mm 12 mm
Dia U- bolts Dia U- bolts
N=
350 3 00 300 3 00 35 0 15 2 . 0
HE 160
Beam sections
HS HE 160.
160.0
0
Z= 1334 Column sections
1500 1182
20.00 mm dia
dia bolts
bolts
(Grade 8.8)
30 0 x 30 0
x 16 mm
mm
thick Base plate
150
x = 152
350
a 50 mm
thick blinding
Hw-tab - a 600
1650
Height
Height of water table below ; H w-tab = 2.0 m
PROJECT TITLE:
OKI / OZIENGBE SOUTH FLOWLINES EPCI PHASE 1 PROJECT ���� �� �� ��
DOCUMENT
DOCUMENT NUMBER: OKOS-DML-FWL-ST-EC-01-0002 Contract No:
Grad
Grade
e Elevat
Elevation
ion ; Z = 1500
1500 mm Assumed -- (T o be prov ided by piping discipline)
discipline)
Pipe Weight
Wei ght from tables ; W p = 22.3 Kg/m
Maximum
Maximum centers of pipe support along the line ; L = 6.71 m
Pipe Weight
Wei ght of U-bolt
U-bolt support; W ub = 0.4 Kg
support clamp
data from
from Allo
Allow
w for possibl
ossible
e vibrat
vibration
ion;; Sf = 25%*W p = 5.58 Kg
K g/m --
Flow Control
Unistrut Vertical
Vertical Dead Load ; gk1 = 4(Wub+Wo + Sf) = 1.87 KN
KN ----
Horizontal
Horizontal dead Load ; gkh = 0.33W p = 0.48 KN
Vertical
Vertical Live Load ; qk1 = Ww = 7.42
7.42 Kg/m
Kg/m = 0.07
0.07 KN/
KN/m
0.5 KN wrt span
Horizontal
Horizontal Live Load ; qkh1 = 0.33W w = 0.16 KN
KN
Total Horizontal
Horizontal Loads PH = qkh + gkh = 0.65 KN
PROJECT TITLE:
OKI / OZIENGBE SOUTH FLOWLINES EPCI PHASE 1 PROJECT ���� �� �� ��
DOCUMENT
DOCUMENT NUMBER: OKOS-DML-FWL-ST-EC-01-0002 Contract No:
iv Mean wind
wind velocity; Vm(z) = cr(z)*co(z)*v b ------ eqn 1
kr = 0. 1 9
cr(z) = 0. 6 4 6
i lv(z) = turbulence
turbulence intensity = σ /v (z) -- - - - eqn 5
v m
Section 4.4.1 KI = Tu
Turbulence fact or = 1 (Note 2 )
σv = 6.756 m
m//s
lv(z) = turbulence
turbulence intensity = σ v /Vm = 0 . 43
PROJECT TITLE:
OKI / OZIENGBE SOUTH FLOWLINES EPCI PHASE 1 PROJECT ���� �� �� ��
DOCUMENT
DOCUMENT NUMBER: OKOS-DML-FWL-ST-EC-01-0002 Contract No:
qpz at heig
eight z = [1+7*Iv(z)]*0.5*ρ *v m (z)
[1+7*I -------- eqn 7
Section 4.5 (1) ρ = The air dens ity = 1.25 Kg/m (Note 2)
i csc d -- S tr
truc tu
tura l f ac
ac to
to r = 1
ii qp(z)
(z) -- Peak velocity
velocity pressu
pressure
re = 0.62 KN/m
ii
iii Aref = Reference area =
eqn 11
Wind
Wind For
Force;
ce; W L = 0.19
0.19 KN
PROJECT TITLE:
OKI / OZIENGBE SOUTH FLOWLINES EPCI PHASE 1 PROJECT ���� �� �� ��
DOCUMENT
DOCUMENT NUMBER: OKOS-DML-FWL-ST-EC-01-0002 Contract No:
7.4 4’’ PIPE SUPPORT BASE PLATE, CONNECTIONS AND FOUNDATION DESIGN
Ref; 4 PIPE SUPPORT TYPE C8 STEEL BASE PLATE AND BOLTING DESIGN
Worked
Examples 600
For the
Design of
Steel structures 300
By
Ove Arup And
Partners 150 600
300 ar
br = 150
Critical
Critic al Super
Super imposing
imposing stanchion member
ember ----
HE 160 X 152 X 6 X 9 x 30.4 Kg/m
Member
Member flange thickness; tf = 9.0 mm
mm ;
Member
Member web thickness; tw = 6 mm
Fact
Factor
ored
ed Desig
Design
n compressi
ressive
ve forc
force
e;Q = 28.5
28.55
5 KN Staad Analysis
.
i Maximum
Maximum potential effecti ve bearing plate ;c = t*(fy /3f jγmo)
bearing width of plate 1
β = 0.67
k j = (a1b1 /ab)^0.5
/ab)^0.5
Dep
Depth of concr
concret
ete
e base ; h = 1000
1000 mm
Since plate thickness, ''t'' has to be greater than Tf, allow for ;
tp = 16 mm (5/8'')
PROJECT TITLE:
OKI / OZIENGBE SOUTH FLOWLINES EPCI PHASE 1 PROJECT ���� �� �� ��
DOCUMENT
DOCUMENT NUMBER: OKOS-DML-FWL-ST-EC-01-0002 Contract No:
EN1993-1-8 5. WELDIN
WEL DING
G REQUIREMENT
REQUIREMENT
2005(E) (From Staad Analysis Ulti
Ultimate
mate structu ral - F z
i Design
Desi gn Shear load; Vsd = 7.10 KN -- being more onerous than uplift Fz)
r = 63
v =
223.3
89
w = 80 z =
6. HOLDING
HOLDING DOWN BOLTS
Table 3.3
EN 1993-1-8 : a Check
heck For Conne
onnect
ctor
or plat
plate
e End/E
nd/Edg
dge
e Distan
stance
ce and
and spac
spaciings
2005 (E)
minimum
minimum end distance ; e1min = 1 .2
.2 do = 26.4 mm
mm
< 35 OK
Thickness of plate; tp = 16 mm
maximum
maximum end distance
distanc e ; e1max = 4tf+40 = 76 mm
minimum
minimum edge distance ; e2min = 1 .2
.2 do = 26.4 mm
mm
< 35 OK
maximum
maximum edge distance ; e2max = 4tf+40 = 76 mm
minimum
minimum spaci ng distance
distanc e ;p1xmin = 2 .2
.2 do = 48.4 mm
mm
maximum
maximum spacing
spaci ng distance
distanc e ;
p1xmax = 14tp = 224 mm
USE 220 mm
minimum
minimum spaci ng distance
distanc e ; p2ymin 2.4do = 52.8 mm
mm
maximum
maximum spacing
spaci ng distance
distanc e ;
p2ymax = 1 4t p = 224 mm
USE 220 mm
.................
3 00 e 2 = 40
300
220
220 40
40 e1 = 40
Desig
Designn of Vertica
erticall desig
esign shear
shear force
force;; Vsd = 1.31
1.31 KN - From Staad Analysis (Uplift F z)
Steel structures
By Ve rt
rti ca
cal s he
hea r co mponent pe r bo ltlt; Fv = vsd /nd = 0.66 K
KNN
Ove Arup And
Partn
Partners
ers Horiz
orizontal
ontal shear
shear comp
component
onent per
per bolt
bolt;; Fm = Vsdey /Zb =
Page 56
Bolt group elastic
elasti c modulus;
modulus; Zb = (nd *(nd+1)*px) /6 = 220 mm
2 2
Total design shear force ;Fvsd = sqrt(F v +Fm ) = 0.7 KN
KN
Tabl
able 3.4
3.4 i Desig
Design
n shear
shear resist
resistan
ance
ce per bolt;
olt; FvRd = α vfubA/ γM2
EN 1993-1-8 :
2005 (E) Reduction
Reduction factor ; αv = 0.60
Bolt ultmate
ultmate tensile strength
stre ngth ; fub = 800 N/mm
EN 1993-1-8
2
2005
2005(E
(E)) Tensi
ensille stre
stress
ss area
area of bolt
olt ; A = 245 mm
Tab 3.1
Partial safety factor ; γM2 = 1.25
Table 3.4
EN 1993-1-8 : ii Design bearing resistance per bolt; FbRd = k1α bfudbtp / γM2 -----
2005 (E)
αb =
fub /fu, ---- a
(p /3d
x o-1/4) (for end bolts ), ---- b
or 1 which ev er is lesser d
Bolt ultmate
ultmate tensile strength
stre ngth ; fub = 800 N/mm
Material
Materia l strength ; fu 430 N/mm
Pitch or spacing
spaci ng of bolt ; px 220 mm
PROJECT TITLE:
OKI / OZIENGBE SOUTH FLOWLINES EPCI PHASE 1 PROJECT ���� �� �� ��
DOCUMENT
DOCUMENT NUMBER: OKOS-DML-FWL-ST-EC-01-0002 Contract No:
thickness of plate; tp = 16 . 0 mm
(2.8*e y /do)-1.7 = 2 6 . 3 - -- - - a
2. 5 ---- b
2. 5 ---- b
Table 3.4
EN 1993-1-8 : iii Design tension resist ance per bolt; F tRd = k2fubAs / γM2
2005 (E)
Total Horizontal
Horizontal Loads PH = qkh + gkh = 0.65 KN
Height
Height of stanchion to bolting point; H s = 1 . 33 4 m See fig 1
Member
Member eccentrici ty considering minor
minor axis of rotation; e y = y/2
y = bread
readth
th of flan
flang
ge for
for stan
stanch
chio
ion
n = 152
152 mm
PROJECT TITLE:
OKI / OZIENGBE SOUTH FLOWLINES EPCI PHASE 1 PROJECT ���� �� �� ��
DOCUMENT
DOCUMENT NUMBER: OKOS-DML-FWL-ST-EC-01-0002 Contract No:
ey = 76 mm = 0 .0 8 m
K2 = 0.9
γM2 = 1 .2 5
i Area of base
Provided width
width of foundation ; Bpf = 0 .6 0 m = bpedestal
ii Ultimate
Ultimate Structural Load Combina tions
ii Ultimate
Ultimate Geotech nical Load Combinations
v Uplift
Uplift Load Combinat ions
F PEDESTAL
PEDEST AL BASE REINFORCEMENT DESIGN
EN -1992
SECTIO
SECTION
N 9.6 Area
Area of steel required;
required; As = 0.1NEd /0.87f yk or 0.002Ac , which ever is greater
hp = Dept
Depth
h of ped
pedestal
estal section
section (mm
(mm) = Lpf = 600 mm
2
Area
rea req
required
ired is tak
taking
ing as ----
---- 720
720 mm
Links
8.0 CONCLUSION
The structural analysis conducted on the supports and foundations show that the foundations have
adequate capacity to withstand the effect of permanent loads and variable loads throughout their
service lives.
The foundation sections prescribed are satisfactory in providing adequate support against bearing