CCR unit-1 & 2 Blending Area Assessor s Ltd.
Location S.K. Das Ass/t Date 01.03.2019
t
Competent/trained
operator.
Risk of injury from falling of
Pre-use checks.
hoppers rose off the ground and Hoist operator and all personnel
Report defects via 1 1 1 No
transported from one area to working in mix area
another. unsafe condition.
Preventive maintenance
done on schedule
Good quality lighting
provided throughout.
Maintenance carried out
on lighting to ensure
Injury or accident caused by
All employees. effectiveness. 1 1 1 No
poor lighting in area.
Defective lights reported
to electrical
maintenance
department.
Comments :
PPE
Safety work wear, safety boots, hearing protection, safety glasses, gloves
SOP’s / docs
Death Major injury or illness to more than 1 Major injury or illness to 1 person Minor/ Trivial
person
Regular 16 12 8 4
Probable/ Occasional 12 9 6 3
Possible/ seldom 8 6 4 2
Improbable 4 3 2 1
Score Actions (all risks must be eliminated or reduced as far as reasonably practicable
16-12 Very high risk – not acceptable. Apply mitigation to eliminate or further reduce risk
8-9 High risk – apply mitigation to eliminate or further reduce risk, and if high risk remains, develop robust control measures to limit and manage
6 Medium risk – if reasonable control measures in place, manageable risk may be acceptable. Continue to monitor
4 Low risk – may be acceptable if all reasonably practicable control measures are in place. However, if more can be done then actions should be done