You are on page 1of 1

BUSINESS CONTINUITY PROTOCOL (BCP) FOR CONTRACTORS –

DURING PARTIAL & FULL LOCKDOWN

PROJECT NAME: COSHH FACILITY


PROJECT NO: LCW-007
WORK PACKAGE: ENGINEERING PROCUREMENT AND CONSTRUCTION
MAIN CONTRACTOR: GBEMICH SERVICES

1. LIST OF CONTRACTOR’S WORKERS


S/N NAMES DESIGNATION PHONE NUMBERS
1 GBENGA ONI MANAGING DIRECTOR 08023212060
2 OGUNSOLA JAMES PROJECT MANAGER 07046215461
3 DARE MAYOWA SITE ENGINEER 08123839840
4 IDOWU YUSUF DESIGN ENGINEER 08085077205
5 BAKARE ADEGOKE K. LOGISTICS 09034033976
6 DISU GANIU ADEDOYIN HSE 08077240327
7 MUFUTAU ABDULWAHAB FOREMAN 08088889766
8 TOCHUKWU AUGUSTINE J. INTERN 07061306330
9 VICTOR ANIEKAN HELPER 08077240327
10 KUFIRE OKON HELPER 08124274201
11 AJAH BEN HELPER 09042739845
12
13
14
15

2. MANDATORY REQUIREMENT FOR CONTRACTORS WORKING ON LADOL BASE


Contractor shall provide the following items for her workers and adhere to Ladol basic COVID-19 protocol, HSE and Security
Procedures.
1 Nose mask(s) ✔
2 Temperature checks ✔
3 Washing of hands / sanitizer ✔
4 Hard hat (Green colour) ✔
5 Coverall / Reflective jacket(s) ✔
6 Safety Goggles ✔
7 Safety footwear(s) ✔
8 Ear plug/ muff ✔
9 Hand gloves ✔
10 Mobile toilet (1no) ✔
11 Social distancing from Ladol Base residence & other Staff ✔
12 Zero tolerance policy against the use of alcohol, drugs, and firearms ✔

3. OTHER ADVICE
Contractor shall provide the following for her workers as addition to the mandatory requirements above
1 Accommodation at nearby village for staff ✔
2 Food and water ✔

I hereby confirm that the above resources will be provided, and usage shall be enforced among the workers during
construction activities.

Contractor Name:
Signature and Date:

PD-F51 Page 1 of 1
This document should not be copied in whole or part without the permission of the MD