STRESSING FORMAT
Span .No.. Date..............
Span Length.... Start Time.......
No of cable (Total) Finish Time......
Cable No. Date of Last Segment Concreting: ……………………………
Min.cube strength of segments of the span ..........................
HT Strands Details Cube strength required for stressing not less than ……………..…..
coil no :…………… Pressing jack information
Actual Modulus of Elasticity of strand:……………….. Make :Dynamic
Actual cross sectional Area of strand:…………………. Stressing Ram area in cm2 :………………..
Length of strand(Anchor to Anchor End): ………...... Lock off Ram area in cm2 :………………..
Locking pressure kg/cm2 :………………..
Anchorage Details Grip length with jack (mm) :………………..
Make :……………. Wedge set final slip (mm) :………………..
system :……….DP.15 Jack efficiency (%) :………………..
Wedges : 3 piece cir clip Pressure gauge No :………………..
Sheathing Detail Design Data(As per as drawing)
Make : Rex GFC Drawing N0/Rev.No. :………………..
Id in mm: :………….. Theoretical modulus of elasticity of strand (N/mm2) :1.95X105
Grooved : Double(or as per specification) Actual x.sectional area of strand (mm2)
Material HDPE Theoretical design elongation(mm) :……………..
Thickness in mm :…………… Jack force(Tons) ……………….
10
11
12
13
14
15
A.Cum elongation(mm)=
B.Zero correction(mm)=
C.Less of elongation in jack.=
D. slip at Deat End(mm)=
Net elongation(mm)=(A+B-C-D)
2 100 40 16 16 100 44 13 13
3 150 55 15 31 150 58 14 27
4 200 67 12 43 200 69 11 38
zero zero
5 14.333 57.333 12.667 50.667
corection corection
6 250 79 12 69.333 250 82 13 63.667
12
13
14
15
STRESSING FORMAT
Chainage :- Girder no RFI :-
Span .No.. SINGLE Date..............
Span Length.... 30MTR Start Time.......
No of strands (Total) Finish Time......
Cable No. Date of Concreting : ……………………………
HT Strands Details Grade of Concreting : ……………………………
coil no
Actual Modu :…………… Pressing jack information
Actual cross sectional Area of strand MM^2:…………………. Make :Dynamic
Length of strand(Anchor to Anchor End) MM: ………...... Stressing Ram area in cm2 : 563.72
Design Data(As per as drawing) Lock off Ram area in cm2 : 95.89
GFC Drawing N0/Rev.No. : CICPL/D1023/FLY/172+960/30M/SUP/007 R0 Locking pressure kg/cm2 :………………..
Theoretical modulus of elasticity of strand (N/mm2) :1.95X105 Grip length with jack (mm) : 750
Theoretical x.sectional area of strand (mm2) : 98.8 Slip After 24hr. (mm) :………………..
Theoretical design elongation(mm) :…………….. Jack efficiency (%) : 98.98
Jack force(KN) ……………….
Modiffied elongation in mm = Design elongationxTheoretical cross.sectional areaxTheoretical Modulus of elasticity
Extension b/w grip length
Actual Area X Actual Modulus of elasticity
STRESSING FORMAT
Chainage :- RFI :-
Span .No.. SINGLE Date..............
Span Length.... 30MTR Start Time.......
No of strands (Total) Finish Time......
Cable No. Date of Concreting : ……………………………
HT Strands Details Grade of Concreting : ……………………………
coil no
Actual Modu :…………… Pressing jack information
Actual cross sectional Area of strand MM^2:…………………. Make :Dynamic
Length of strand(Anchor to Anchor End) MM: ………...... Stressing Ram area in cm2 : 563.72
Design Data(As per as drawing) Lock off Ram area in cm2 : 95.89
GFC Drawing N0/Rev.No. : CICPL/D1023/FLY/172+960/30M/SUP/007 R Locking pressure kg/cm2 :………………..
Theoretical modulus of elasticity of strand (N/mm2) :1.95X105 Grip length with jack (mm) : 750
Theoretical x.sectional area of strand (mm2) : 98.8 Wedge set final slip (mm) :………………..
Theoretical design elongation(mm) :…………….. Jack efficiency (%) : 98.98
Jack force(KN) ………………. Pressure gauge No :………………..
Modiffied elongation in mm = Design elongationxTheoretical cross.sectional areaxTheoretical Modulus of elasticity
Actual Area X Actual Modulus of elasticity
1 50 27 0 0 50 30 0
2 100 40 13 13 100 44 14 14
3 150 53 13 26 150 60 16 30
4 200 70 17 43 200 70 10 40
zero zero
- 14.333 57.333 13.333 53.333
corection corection
5 250 79 9 66.333 250 82 12 65.333
12
A.Cum elongation(mm)= 128.333
B. slip at Deat End(mm)=
Net elongation(mm)=(A-B )
Remarks..........
10
11
12
13
14
15
A.Cum elongation(mm)=
B.Zero correction(mm)=
C.slip at Deat End(mm)=
Net elongation(mm)=(A+B-C)
Remarks..........
10
Axis Title
8
0
Chart Title
4- laning of aligarh - kanpur section from Km.140.200 (Design Chainage 194.900) to Km.186.000 (Design chainage 195.733) [Pakage -1
from aligarh-Bhadwas] of nh- 91 in the Etah of uttar Pradesh hybrid Annuit mode under Bharatmala Pariyojna
STRESSING FORMAT
Chainage :- Girder no RFI :-
Span .No.. Date..............
Span Length.... 30MTR Start Time.......
No of strands (Total) Finish Time......
Cable No. Date of Concreting : ……………………………
HT Strands Details Grade of Concreting : ……………………………
coil no
Actual Modu :…………… Pressing jack information
Actual cross sectional Area of strand MM^2:…………………. Make :Dynamic
Length of strand(Anchor to Anchor End) MM: ………...... Stressing Ram area in cm2 : 563.72
Design Data(As per as drawing) Lock off Ram area in cm2 : 95.89
GFC Drawing N0/Rev.No. : CICPL/D1023/FLY/172+960/30M/SUP/007 R0 Locking pressure kg/cm2 :………………..
Theoretical modulus of elasticity of strand (N/mm2) :1.95X105 Grip length with jack (mm) : 750
Theoretical x.sectional area of strand (mm2) : 98.8 Slip After 24hr. (mm) :………………..
Theoretical design elongation(mm) :…………….. Jack efficiency (%) : 98.98
Jack force(KN) ……………….
Modiffied elongation in mm = Design elongationxTheoretical cross.sectional areaxTheoretical Modulus of elasticity
Actual Area X Actual Modulus of elasticity