You are on page 1of 3

Republic of the Philippines

Department of Education
Cordillera Administrative Region
SANTOR NATIONAL HIGH SCHOOL
Santor, Rizal,Kalinga

ANSWER SHEET

Name:
Score:
Grade/Section: GRADE 8
Subject: TLE-PLUMBING Q3-M3
 DO NOT FORGET TO WRITE YOUR NAME
 READ THE INSTRUCTIONS CAREFULLY
DIRECTION: ANSWER THE FOLLOWING FROM YOUR MODULE TO BE RECORDED. READ
YOUR MODULE BEFORE ANSWERING.
WHAT IS IT WHAT’S MORE WHAT I HAVE LEARNED

1. 1. 6. 1. 6.
2. 2. 7. 2. 7.
3. 3. 8. 3. 8.
4. 4. 9. 4. 9.
5. 5. 10. 5. 10.
PERFORMANCE TASK
Title Perform mensuration and calculation
Performance Given the necessary supplies, materials and tools, you must be able to
Objective perform mensuration and calculation.
Tools Pull-push rule.
Procedure
1. In a given 1 inch below, label horizontally the 32nds measurement
starting from 1/32 to 1 inch.
2. From your horizontal lines label 1/8, ¼, ½, and ¾.

Assessment
Demonstration and Written Test
Method

Directions: Refer to the picture given of an installed lavatory with a


standard measurement and answer the questions.

A. What is the conversion factor of a height in 1, 006 inches into meter?

B. How many feet are there in 400 inches floor width lavatory?

You might also like