Skills Assessment 2

Criteria
Unit code, name and release number
CPCCBC4004A-UNGRADED - Identify and produce estimated costs for building and construction
projects (1)
(CPCCBC4004A_AE_Sk_2of4_SR2),

Qualification/Course code, name and release number


CPC40110 - Certificate IV in Building and Construction (Building) (7)

Student details
Student number

Student name

Assessment Declaration
 This assessment is my original work and no part of it has been copied from any other
source except where due acknowledgement is made.

 No part of this assessment has been written for me by any other person except
where such collaboration has been authorised by the assessor concerned.

 I understand that plagiarism is the presentation of the work, idea or creation of


another person as though it is your own. Plagiarism occurs when the origin of the
material used is not appropriately cited. No part of this assessment is plagiarised.

Student signature and Date

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_AE_Sk_4of4_20190714 Page 1 of 36


Resource ID: IEC_18_005_U05 STUDENT NAME:
Version: 28/06/2019
Date created: 02/08/2018
Date modified: 24/04/2022

For queries, please contact:

Infrastructure, Energy and Construction SkillsPoint


Mount Druitt

© 2019 TAFE NSW, Sydney


RTO Provider Number 90003 | CRICOS Provider Code: 00591E
This assessment can be found in the: Learning Bank
The contents in this document is copyright © TAFE NSW 2019, and should not be reproduced without
the permission of the TAFE NSW. Information contained in this document is correct at time of printing:
24 April 2022. For current information please refer to our website or your teacher as appropriate.

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_Sk_4of4_20190714 Page 2 of 36


Resource ID: IEC_18_005_U05
Assessment instructions
Table 1 Assessment instructions

Assessment details Instructions

This unit of competency is to be delivered via TAFE Digital, TAFE NSW


online platform.
Delivery Mode The intention of this program is to be undertaken by the student via an
online mode, through distance learning, and therefore all assessment
tasks are reflective of this process.

Assessment overview The objective of this assessment is to assess your knowledge as would
be required to establish the estimated costs associated with the
acquisition of materials and labour on building and construction sites,
together with the application of relevant overhead costs and margins.
Knowledge of physical resource and supplier identification, assessment
of the availability of and requirements for skilled labour and application
of appropriate codes, regulations and approvals gaining processes is
essential.

Assessment Event 4 of 4
number

Instructions for this This is a skill-based assessment and will be assessing you on your ability
assessment to demonstrate skills required in the unit.

This assessment is in five parts. The first part is broken into several sub-
tasks. For each of these sub-tasks, there is a checklist of statements to
show what an assessor will look for in your submitted work. Complete
each sub-task, then before you move on to the next one, carefully
review your work by reading through the checklist, to make sure you
have met all the requirements.

1. Practical Tasks

 Task 1 – Joists for first floor addition


 Task 2 – External wall cladding for first floor addition
 Task 3 – Floor covering for the first-floor addition
 Task 4 – Internal Lining for the first-floor addition
 Task 5 – Painting the for first floor addition
 Task 6 – Plant and Equipment Requirements
 Task 7 – Waste Management
 Task 8 – Apply overheads and margin

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_Sk_4of4_20190714 Page 3 of 36


Resource ID: IEC_18_005_U05
Assessment details Instructions

2. Role Play – Conduct a Meeting

3. Additional Questions

4. Assessment Feedback.

Your assessment submissions should be via the OLS (Online Learning


System). Refer to online instructions in the student portal for uploading
for files.

Submission instructions Feedback will be provided to you from your Teacher upon completion
of your assessment tasks. It is important that you keep a copy of all
electronic and hardcopy assessments submitted to TAFE and complete
the assessment declaration when submitting the assessment.

What do I need to do to To successfully complete this assessment, you must complete all
achieve a satisfactory sections of this assessment as outlined in the assessment instructions
result? and be marked satisfactory for each task and sub-task, role play and
confirmation phone call, by your assessor as indicated in checklists.

All oral questions must be answered correctly to be deemed


satisfactory in this assessment task; however, assessors may ask
questions to clarify understanding.

What do I need to Computer and online access, calculator, pens and measuring
provide? equipment.

What the assessor will The following documents are available on the OLS.
provide?
Mr and Mrs Brown’s Alterations and Additions – V4004-619.pdf
(CPCCBC4004A_AE_Sk_2of4_SR2)

Online learning materials.

Adobe connect sessions.

http://ols.oten.tafensw.edu.au/ols/core/studenthome

TAFENSW Library Services

https://wsi.tafensw.libguides.com/home

National Construction Code

https://ncc.abcb.gov.au/

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_Sk_4of4_20190714 Page 4 of 36


Resource ID: IEC_18_005_U05
Assessment details Instructions

Australian Standards

https://www.standards.org.au/standards-catalogue/sa-snz/building

RB Holdings, simulated Website with industry documentation,


E.g. Plans, specification and company profile

https://share.tafensw.edu.au/share/file/72ecc80c-01c4-4dfb-aca3-
2acc2f4c5a85/1/RB%20Holdings.zip/RB%20Holdings/index.html

Cordell Estimator Platinum Edu


http://platinumedu.cordell.com.au

Specific information including:

o Plans
o Other Construction Documents
o What is estimating
o Preliminary estimates
o Detailed estimates
o Background to measurement
o Australian standard method of measurement of building works
(ASMMBW)
o The quantity surveyor
o The building estimator
o Composition of building costs
o Labour hours
o The measurement processes
o Describing measured work
o Basic measurement techniques
o Finalising the measurements
o Measurement working example
o Computer estimating software
o Contract types associated with the tendering process
o The tendering processes
o Work Cover, Environmental Protection Agency (EPA)
requirements, waste management and other statutory
o Anticipated profit
o Project costs are calculated for tender or bill.
o Final Check.

Due date and time Due to blended delivery mode, you will work to an agreed Individual

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_Sk_4of4_20190714 Page 5 of 36


Resource ID: IEC_18_005_U05
Assessment details Instructions

Learning Plan (ILP) that is provided to you at enrolment. Your teachers


will discuss the assessment requirements and due dates and you will
review and confirm acceptance of your ILP. Teacher support is available
to students Monday to Friday by phone or email.

allowed Due dates are structured based on your enrolment commencement


date, with an automatic prompt for submission date generated
throughout your enrolment period via the OLS as outlined in your ILP.

You should expect to take no longer than 5 days to complete all tasks
outlined in this assessment.

Assessment feedback, Appeals are addressed in accordance with Assessment Guidelines for
review or appeals TAFE NSW.

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_Sk_4of4_20190714 Page 6 of 36


Resource ID: IEC_18_005_U05
Specific task instructions
To complete this task, you are required to submit a price for the contractual obligations of Mr and Mrs
Brown's construction project.

You will be required to make calculations based on the tasks listed below.

You will refer to the documents downloaded from the OLS:

Mr and Mrs Brown’s Alterations and Additions – V4004-619.pdf


(CPCCBC4004A_AE_Sk_2of4_SR2)

Part 1: Practical Tasks


Background
To support the role of the builder in being able to produce construction industry documentation, students
have access to a professional intranet that provides a simulated building company, RB Holdings. RB
Holdings functions as a simulated workplace environment where project-based assessments can be
undertaken using industry standard documentation, plans, activities, responsibilities and procedures. The
RB Holdings business structure allows simulation of work environments such as, but not limited to, design
offices, site offices and construction sites.  RB Holdings provides students with relevant documentation that
is to industry standard that allows students to experience a professional simulation of a construction office
environment. RB Holdings is a simulated organisation that has been created purely for educational
purposes. RB Holdings materials are accessed via a secure website that is copyright of © TAFE NSW.

RB Holdings has an organisational policy that requires you, as one of its staff members, to produce material
and labour estimates no later than 5 working days from receiving the request from your manager. The
information calculated must be to the quality standards required by RB Holdings, that is, accurate quantity
take-off and calculations in accordance with “Standard Method of Measurements”. Calculations, costings
and communications must be created in accordance with standard RB Holdings policies and procedures.

You will need to calculate the following costs based on the information provided in this assessment event.

You are to demonstrate your competence at task management skills by developing your own spreadsheet
from a costing software program of your choice to calculate the materials and labour requirements
To establish your task management skills, YOU MAY NOT use any pre-prepared spreadsheets previously
provided.

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_Sk_4of4_20190714 Page 7 of 36


Resource ID: IEC_18_005_U05
The costing software program method you choose to use will need to allow you to clearly provide the
following items:
 Areas to clearly show calculation workings for each trade
 Description of the items being calculated
 Logical ordering of trade costs with sub totals and total
 A final price tally that enables the inclusion of overheads, margins and GST.
Some costs have been provided due to the nature of the question being asked.

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_Sk_4of4_20190714 Page 8 of 36


Resource ID: IEC_18_005_U05
Scenario:
Mr and Mrs Brown have recently met with a Building Design consultant to initiate the design and costing
stage for an alteration and addition to their existing house at 1 Lake Road Toronto NSW.

You are employed by RB Holdings who have been engaged by their clients, Mr and Mrs Brown, to provide
preliminary estimations of products identified by the designer, as a lead up to finalising their project
budget.
Development approval is pending from Lake Macquarie City Council, and a set of working plans and
specifications, has been drafted for the client. These will need further amendments dependant on the
development approval requirements, and the outcomes of your work in this assessment.

You will be analysing Mr and Mrs Brown’s Alterations and Additions – V4004-619.pdf
(CPCCBC4004A_AE_Sk_2of4_SR2) to identify the items defined in the assessment tasks for the following
trade areas:

 Joists for first floor addition

 External Wall cladding for first floor addition

 Floor Covering for the first-floor addition

 Internal Lining for the first-floor addition

 Painting the first-floor addition.

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_Sk_4of4_20190714 Page 9 of 36


Resource ID: IEC_18_005_U05
Task 1: Joists for first floor addition
Task 1.1 – Calculate quantities of floor joists for first floor additions

Considering the Mr and Mrs Brown’s Alterations and Additions – V4004-619.pdf


(CPCCBC4004A_AE_Sk_2of4_SR2), you are required to calculate the quantities required for the floor joists
for the first-floor additions. The quantities are to be expressed in an accepted industry format.

Sl. Quantit Rat


Particulars Unit Cost
No. y e

Metal fixings, built in joist hanger Exampet SPH20050 joist 50 x


1 70 8 560
hanger heavy duty 50 x 235 235

Metal fixings, timber floor joist straps Simpson H11B15 5*


2 100 9 900
restraint strap bent (at 150 mm) 5 x 1100 mm 1100

Noggings between roof joist 47 x 50 mm sawn carcassing 47 *


4 50 6 300
treated FSC 50

Roof wall plate 75x 100 mm regularised joist kiln dried 75 *


5 500 5 2500
treated C16 graded FSC 100

Hip corner tie to roof 47 x 100 regularised joist kiln dried 47 *


6 100 4 400
treated C16 graded FSC 100

Lean to roof apex wall plate 47 x 150 mm regularised joist 47 x


7 250 6 1500
kiln dried treated C16 graded FSC 150

Loft hatch horizontal trimmer 47 x150 mm regularised joist 47


8 500 3 1500
kiln dried treated C16 graded FSC x150

47 x 150 mm regularised joist kiln dried treated C16 47 x


9 300 7 2100
graded FSC 150

47 x
Timber floor joist 47 x 200 m regularised joist
10 200 400 6 2400
kiln dried C16 graded FSC
m

47 x
Roof rafters 47 x 150 mm regularised joist kiln
11 150 250 5.5 1400
dried and treated C16 graded FSC
mm

12 Roof hip ridge rafter 47 x200 mm regularised joist kiln 47 350 6 2100

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_Sk_4of4_20190714 Page 10 of 36


Resource ID: IEC_18_005_U05
x20
dried C16 graded FSC 0
mm

Task 1.2
Using the following price guide calculate the total cost of the timber:
 HJ300 ‘HyJoist’ at $25.00 per metre.
5.5 M Length will be 21 kg
Cost of 21 for 5.5 m at 30 dollar is 165 $
Task 1.3
You are required to conduct research and access the ‘Fair Work Building and Construction General on Site
Award’ and calculate the cost of two Level 3 Carpenters on site for 8 hrs.

Hourly is 26 per hour so for 2 carpenters for one 8 hours shift will be

8 x 26 x 2 = 416 $

Task 1 – Student Checklist

Check you have….

1. Presented detailed calculations showing the working out in a clear and ordered format.
2. Described the items being costed.
3. Correctly calculated the quantities required for the floor joists for the first-floor additions.
4. Expressed the quantities in an accepted industry format.
5. Correctly calculated the total cost of the timber floor joists using the price guide of HJ300
‘HyJoist’ at $25.00 per metre.
6. Conducted research and accessed the ‘Fair Work Building and Construction General on Site
Award’ and calculated the cost of two Level 3 Carpenters on site for 8 hrs.

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_Sk_4of4_20190714 Page 11 of 36


Resource ID: IEC_18_005_U05
Task 2: External Wall cladding for first floor addition

Task 2.1 – Calculate quantities of external wall cladding

Using the Mr and Mrs Brown’s Alterations and Additions – V4004-619.pdf


(CPCCBC4004A_AE_Sk_2of4_SR2), you are required to calculate the quantities required for the specified
external weatherboards the first-floor addition. The quantities are to be expressed in an accepted industry
format.

Items/particulars Unit Length Breath Height Quantity

LW = 9.1 m
3 9.10 0.30 2.90 23.75 m3
(8.8 + 0.3)

SW1 = 3 m
3 3.00 0.30 2.90 07.83 m3
(3.3 - 0.3)

SW2 = 4 m
4 4.00 0.30 2.90 13.92 m3
(4.3 – 0.3)

Items/particulars Unit Length Breath Height Quantity

Walls (External):

L = 7.9 m
2 7.9 0.30 0.80 3.79 m3
(0.3 + 0.3 + 3 + 0.3 + 4)

B = 8.5
2 8.5 0.30 0.80 4.08 m3
4 + 0.3 + 4.2

53.37 m3
Total
(4.08 + 3.79 + 23.75 + 7.83 + 13.92)

Task 2.2

You are required to research and source a suitable ’Scyon’ cladding product size and price from a reputable
building supplier. You are required to calculate and apply the price to find the correct number of boards.

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_Sk_4of4_20190714 Page 12 of 36


Resource ID: IEC_18_005_U05
The sizes are calculated below:

According to the website the usual size of these weather boards is 4200 * 150 * 16 mm 3 which is equal to
4.2 * 0.15 * 0.016 m3 = 0.01008 m3

Now the size calculated above is 53.37 m3.

Number of boards required = 53.37/0.01008

= 5294.642

= 5295 Pieces

Price = 5295 * $39.72 = $ 2,10,317.4

The websites which have been used are:

 https://adxdepot.com.au/16mm-scyon-linea-weatherboard-4200-x-150mm ( for price)


 https://bellplastersupplies.com.au/Pruduct/linea-weatherboard/ (for material)

Task 2 - Student Checklist

Check you have….

1. Presented detailed calculations showing the working out in a clear and ordered format.
2. Described the items being calculated.
3. Used the Mr and Mrs Brown’s proposed alteration and addition Architectural Plans &
Specifications, to calculate the quantities required for the external weatherboards.
4. Expressed the quantities in an accepted industry format.
5. Sourced the ’Scyon’ cladding product size and price from a reputable building supplier.
6. Applied the sourced price and calculated quantities.

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_Sk_4of4_20190714 Page 13 of 36


Resource ID: IEC_18_005_U05
Task 3: Floor covering for the first-floor addition

Task 3.1 – Calculate floor covering quantities

Using the Mr and Mrs Brown’s Alterations and Additions – V4004-619.pdf


(CPCCBC4004A_AE_Sk_2of4_SR2), you are required to calculate the quantities required for the carpet floor
coverings for the first-floor addition, and the games room with the following specifications:

 First Floor carpet - allow 5% waste


 Games Room flooring - allow 2.5% waste.

Sl. No. Particulars Unit Area

1 Robe m2 2.75

2 Hall m2 5.61

3 Bathrooms m2 20.07

4 Lounge m2 24.62

5 Family m2 23.40

6 Bedroom 3 m2 14.04

7 Bedroom 2 m2 0.00

8 Bedroom 1 m2 32.22

9 Kitchen m2 14.82

10 Garage m2 55.69

11 allow 5% waste m2 202.83

Games room quantity = 84.36 m2 + 10.00 m2 + 13.20 m2 + 8.06 m2 + 14.00 m2 = 129.62

With allowed 2.5% waste = 132.86 m2 = 133 m2

Task 3.2 – Calculate floor covering costs

Using the following price guide, you are required to calculate the total cost of floor coverings:
 High Quality nylon/wool blend @ $115.00 per m 2
 Laminate floating floor @ $58.00 per m2.
Cost:

At 115.00 per m2 = 115.00 * 202.83 = $ 23325.45

At $58.00 per m2 = 58.00 * 202.83 = $ 11764.14

Task 3.3

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_Sk_4of4_20190714 Page 14 of 36


Resource ID: IEC_18_005_U05
You are required to calculate the labour time on site for the carpet and timber floor layers based on the
advice from the suppliers.

 2 x carpet layers able to lay 3m2 per hour. This includes time to transport, placement and clean-up
 3 x timber floor layers (may be the carpet layers doing this job) able to lay 4.5m 2 per hour. This
includes time to transport, placement and clean-up.

Speed of 2 carpet layers doing their job = 3 m 2/hr

Now is the required speed being 1 m 2/hr = 0.66 carpet layers

For 202.83 m2 it will be 135 carpet layers including everything.

Now 4.5 m2/hr for 3 timber floor layers

Now is the required speed being 1 m 2/hr = 0.66 timber floor layers

Hence both are the same since both values come the same.

Task 3 - Student Checklist

Check you have….

1. Presented detailed calculations showing the working out in a clear and ordered format.
2. Described the items being calculated.
3. Used the Mr and Mrs Brown’s proposed alteration and addition Architectural Plans & Specifications,
to calculate the quantities required for the floor coverings.
4. Correctly calculated area of the first-floor carpet quantity.
5. Correctly calculated the 5 % waste allowance and added it to the first-floor carpet quantity.
6. Correctly calculated area of the games room flooring quantity.
7. Correctly calculated the 2.5 % waste allowance and added it to the games room flooring quantity.
8. Gathered information (quantity) that relates to material supply.
9. Presented detailed calculations showing the working out in a clear and ordered format.
10. Described the items being costed.
11. Calculated the total cost of carpet floor coverings using the $115.00 per m 2 cost guide.
12. Calculated the total cost of timber flooring for the games room using the $58.00 per m 2 cost guide.
13. Calculated the labour costs and time on site for the carpet layers based on 2 layers able to lay 3m 2
per hour.

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_Sk_4of4_20190714 Page 15 of 36


Resource ID: IEC_18_005_U05
Task 4: Internal Lining for the first-floor addition

Task 4.1 – Calculate quantities for internal wall and ceiling linings

Using the Mr and Mrs Brown’s Alterations and Additions – V4004-619.pdf


(CPCCBC4004A_AE_Sk_2of4_SR2), you are required to calculate the quantities required for the internal wall
and ceiling linings for the first-floor addition, with the following specifications:

 Wall linings 10mm standard Plasterboard

 Ceiling linings 10mm Ceiling specific plaster board

Use the surrounding standard room wall height at the stair void, and do not calculate the stair void below
the floor level.

Labour 300 1000 1300 m3 31.112

Plinth m3

RR Masonry in Cement Mortar m3 12.813

Total Rubble m3 43.924

OR

Brick Masonry m3

Wall standard m3 44.096

Ceiling m3 34.252

Total m3 78.349

Brick Work

Cement/Sand Ratio Cement (Kg)

6 1:5 72

58 1:6 58

1:8 43

Brick Work 1: 6 78.349

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_Sk_4of4_20190714 Page 16 of 36


Resource ID: IEC_18_005_U05
0.03851 90.884

Cement required 58 Kg/m3 2 m3 4

0.23107 18.104

sand 2 m3 2

Task 4.2

You are to source a suitable product type and price from a reputable supplier and apply square metre price
to the calculated quantities for each product.

Task 4.3

You have made enquiries and have been advised by the plastering contractors that they require the
following consumables:

 16Kg of Base Coat product per 100m 2 of plaster lining

 10Kg of Topcoat per 100m2 of plaster lining.

 5 Rolls of paper tape for the job.

You are required to calculate the quantities and source prices from a reputable supplier for the consumable
items listed above, for a total consumable price.

You are required to provide details of your supplier sources.

G.F.   L B H Area Perimeter Tile


Garage 55.692 7.8 7.14   55.692 29.88 55.692
Kitchen 14.82 3.8 3.9   14.82 15.4 14.82
Bedroom 1 32.22 3.6 5.7   20.52 18.6  
Bedroom 2   3 3.9   11.7 13.8  
Bedroom 3 14.04 3.6 3.9   14.04 15 bath
Family 23.4 6 3.9   23.4 19.8 28.13
Longue 24.624 3.6 6.84   24.624 20.88  
Bath 20.07 2.7 2.7 1 7.29 10.8 Stair
LDRY   2.4 2.7 1 6.48 10.2 9.6
ENS   2.1 3 1 6.3 10.2 139.844
Hall 5.61 5.1 1.1   5.61 12.4  
ROBE 2.75 2.5 1.1   2.75 7.2  
Total 193.226 184.16 248.086
Doors 5
Wall Height 3
  0.1

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_Sk_4of4_20190714 Page 17 of 36


Resource ID: IEC_18_005_U05
GF Outside 181.073
FF Outside 104.64
Parapet 29.3632

FF   L B H Area Perimeter Tile


Bedroom 14 4 3.5   14 15  
Bath 1 8.06 2.6 1.6 1 4.16 8.4  
Bath 2   2.6 1.5 1 3.9 8.2  
Additional
Room 10 5 2   10 14  
Bedroom 13.2 4 3.3   13.2 14.6  
  238.486       45.26 60.2  

Ceiling Area 238.486  


Total
Add Steps 248.086 Perimeter   244.36

Plaster loft Outside


GF 210.436
FF 104.64

Plastering ratio(cement/sand) 01:04


Plinth refilling 69.5614

Lean Mortar for tile

GF Outside 249.9023 sqmt

FF Outside 136.581 sqmt

GF Inside 748.316 sqmt

FF inside 219.905 sqmt

Plastering     1383.8    

01:04 15   8    

Cement 59 kg/m3 0.03918 m3/m2 163.3

Sand     0.1567 m3/m2 21.686

  Outside Inside Sunshade Loft Deduct   Base Coat Topcoat

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_Sk_4of4_20190714 Page 18 of 36


Resource ID: IEC_18_005_U05
G.F. 210.436 745.706 58.72632 21.87 19.26 1017.5 249.9023 748.32

F.F. 104.64 225.86 41.856 3.96 9.915 366.4 136.581 219.91

Total 1383.9 386.4833 968.23

Now for the price which is given below:

Base coat = 249.9023 m2

Given for 100 m2 16 kg of paint is required hence total weight = (249.9023 m 2/100 m2)/16

= 39.984368 Kg

Now for the topcoat = 748.32 m2

Given for 100 m2 10 kg of paint is required hence total weight = (748.32 m2/100 m2)/10

= 74.832Kg

Hence total paper rolls required = 10 rolls

Details of the supplier https://www.networkbuilding.com.au/

Task 4 - Student Checklist

Check you have….

1. Presented detailed calculations showing the working out in a clear and ordered format.
2. Described the items being costed.
3. Shown that they have read and interpreted the drawings and specifications.
4. Correctly calculated the quantities for the Wall linings specifying 10mm standard Plasterboard.
5. Correctly calculated the quantities for the Ceiling linings specifying 10mm ceiling specific
Plasterboard.
6. Sourced a suitable product type and price from a reputable supplier and applied the price to the
calculated quantities.
7. Correctly calculated the following consumable quantities for Base Coat product.
8. Correctly calculated the following consumable quantities for Topcoat product.
9. Correctly calculated the following consumable quantities for paper tape for the job.
10. Provided details of your supplier sources.

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_Sk_4of4_20190714 Page 19 of 36


Resource ID: IEC_18_005_U05
Task 5: Painting the first-floor addition

Task 5.1 – Calculate quantities of paint.

Using the Mr and Mrs Brown’s Alterations and Additions – V4004-619.pdf


(CPCCBC4004A_AE_Sk_2of4_SR2), you should calculate the quantities of paint required for the internal
walls and ceilings for the first-floor addition, with the following specifications:

 1 x Sealer coat in m2

 2 x Topcoats in m2

 Assume a single colour for topcoat

 Do not calculate quantities for skirtings or architraves

 Do not calculate ensuite bathroom.

You are required to research the square metre coverage of paint per litre, to convert the calculated square
metres into the required number of 10 litre cans and 4 litre cans.

Paint Quantity

249.902
GF Outside 3 sqmt
FF Outside 136.581 sqmt
GF Inside 748.316 sqmt
FF inside 219.905 sqmt

Sunshad Base Topcoa


  Outside Inside e Loft Deduct   Coat t
210.43 249.902
G.F. 6 745.706 58.72632 21.87 19.26 1017.5 3 748.32
F.F. 104.64 225.86 41.856 3.96 9.915 366.4 136.581 219.91
386.483
Total 1383.9 3 968.23

Now, 968.23 m2 of sealer coat = 9682.3 or 9683 L of 10 L cans

Now topcoats in m2 = 386.4833 *2 = 772.9666 = 773 m2 of topcoat 17850 number 4 litre cans are required

Task 5.2

You are to source a suitable paint brand and price from a reputable supplier and apply the price to the
calculated quantities.

You are required to provide details of your supplier sources

The supplier information is https://www.britishpaints.com.au/contact-us/

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_Sk_4of4_20190714 Page 20 of 36


Resource ID: IEC_18_005_U05
Task 5 - Student Checklist

Check you have….

1. Presented detailed calculations showing the working out in a clear and ordered format.
2. Described the items being costed.
3. Read and interpreted the drawings and specifications.
4. Correctly calculated the Sealer coat in m2.
5. Correctly calculated the Topcoats in m2.
6. Researched the square metre coverage of paint per litre and converted the calculated square
metres into the required number of 10 litre drums and 4 litre cans.
7. Sourced a suitable paint brand and price from a reputable supplier.
8. Correctly applied the price to the calculated quantities.
9. Provided details of your supplier sources.

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_Sk_4of4_20190714 Page 21 of 36


Resource ID: IEC_18_005_U05
Task 6: Plant and Equipment requirements

Task 6.1 – Calculate temporary fencing

You are required to research the Work Health Safety requirements to find information about how to
restrict access to a construction site in accordance with Local Authority Approval requirements and
statutory WHS Legislation.

Locate the construction site's access point(s) such that existing traffic and/or pedestrians are not
inconvenienced. Note: If the access point is not already in place or designated in a development
authorisation, you will need a separate Roads Act approval from the Council for temporary vehicular
access. The Roads Act will require approval for temporary fencing / barrier systems installed within the
road reserve. This requires submitting a formal application to Council and paying a fee. Fees are also
charged for continued use of the road reserve until the construction is finished and the temporary fencing /
barrier system is removed. The use of the route for truck and equipment parking is not included in the
approval for a temporary fence construction. A separate work zone permit from Council is required. A map
of the location. The network typically (open, solid fencing, overhead protective structure, scaffolding, or
barrier fencing, for example). z Information about the estimated duration, any staged movement, and/or
anticipated changes to the type of temporary fencing / barrier system. z A copy of the certificate of
currency demonstrating the Principal Contractor's $10 million public liability and NSW workers
compensation insurances. The Blue Mountains City Council must be named as an insured party on the
general liability coverage.

Task 6.2

Using the information derived from Task 6.1 above, you are required to identify the plant and equipment
that is required to safeguard the site.

Plain Cement Concrete


Metal 40 mm 6.76 1500
Sand 3.38 1500
Cement 25.5 250
Labour 320 3250 3570 m3 7.4

Task 6.3

You are to obtain base rate (not negotiated) prices from a reputable hire company based on a per week
hire rate for the identified plant and equipment in the previous Task 6.2 above.

You are required to provide details of your supplier sources.

https://www.fencingaustralia.com.au/ is the link of the company which is very good at their fencing
work.

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_Sk_4of4_20190714 Page 22 of 36


Resource ID: IEC_18_005_U05
Task 6 - Student Checklist

Check you have….

1. Researched the Work Health Safety requirements to restrict access to a construction site.
2. Correctly calculated the quantity of temporary fencing to the front boundary of the site.
3. Presented detailed calculations showing the working out in a clear and ordered format.
4. Described the items being costed.
5. Read and interpreted the drawings and specifications.
6. Obtained a base rate (not negotiated) price on a per week hire rate.
7. Provided details of your supplier sources.

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_Sk_4of4_20190714 Page 23 of 36


Resource ID: IEC_18_005_U05
Task 7: Waste Management

Task 7.1 – Develop a Wastage Management Plan

You are required to develop a Waste Management Plan for all the materials addressed in the tasks above. A
Waste Management Plan template is provided on below and can be adjusted and used for your submission
or you may use your own as developed or sourced template.

Materials On- Site Destination

Reuse & Recycling Disposal

Type of Estimated On-Site Off-Site Specify the


material Volume (m³) Specify how Specify the contractor and contractor and
or Area (m²) materials will be recycling outlet landfill site
or weight reused or
(tonnes) recycled on-site
Clean up and http://dandpconstruction.com/ Not required
Bricks recycle for
2m³ pavement
driveways
Timber Joists Plywood, The provider has the option of Not required
shelves, and collecting the garbage and
N/A tables may all be sending it to the domain of
made with these repurposing wood for a fee of
materials. It's $ 88.
possible to hire
more people.
Concrete
aggregates can
be made from
waste powder.
External Wall 55 m3 Filler activities in At a cost of $ 220, the provider Not Required
Cladding near zero areas can collect the debris and
can be done transfer it to tile experts or a
with the waste recycling organisation.
material.
Floor Coverings The material can Can be given to local recycling Not required
be utilised in facility at around $110
199 m3 road and paving
projects. It can
also be mixed
into tile and
other fixing
projects.
Internal Wall The remaining N/A Not required
Cladding 80 m2 debris will be
used as fencing
materials.

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_Sk_4of4_20190714 Page 24 of 36


Resource ID: IEC_18_005_U05
Paint 1000 m3 If necessary, the The rest can be returned if the Not required
waste will be pack is not opened. The rest
used to paint can be sent if the contractor
the road pavers from which it has been bought
and edges. can take them.

Task 7 - Student Checklist

Check you have….

1. Developed a Waste Management Plan for all the materials.


2. If you used your own developed template, that it contains the required details.
3. If you have used a sourced template, that it contains the required details.
4. Professionally presented your Waste Management Plan.

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_Sk_4of4_20190714 Page 25 of 36


Resource ID: IEC_18_005_U05
Task 8: Apply overheads and margin

Task 8.1 – Finalise preliminary costings.


Upon completion of the preliminary quantities and cost estimates calculation for the identified items, you
are required to complete your Preliminary Costings Summary Sheet with the following information
provided:
a) Total – Material costs
b) Total – Labour costs
c) Profit – 20%
d) Overhead - 15%
e) GST to be added where applicable
f) Total price – to be documented at the end of the summary sheet.

Note that this is not the total price for these renovations and additions to this dwelling.
The objective of this assessment is to calculate preliminary labour and material resource costs.
No. Particular Amount $
Civil Work
1 Total Material Cost $ 2,38,49,481.41
2 Total Labour Cost $ 83,89,271.13
M & E Work
3 Internal Electrical Work $ 15,00,000.00
Total Cost (Material + Labour + M&E) $ 3,37,38,752.54
Grand Total $ 3,37,38,752.54
Say $ 3,38,00,000.00

Total Cost $ 3,37,38,752.54


Profit $ 67,47,750.51
GST $ 10,12,162.58
Total (All) $ 4,14,98,665.62

Task 8- Student Checklist

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_Sk_4of4_20190714 Page 26 of 36


Resource ID: IEC_18_005_U05
Check you have….

1. Completed your Preliminary Costings Summary Sheet.


2. Correctly itemised the material costs to the Summary Sheet.
3. Correctly itemised the labour costs to the Summary Sheet.
4. Shown added the 20% profit margin.
5. Added the 15% overhead amount.
6. Correctly calculated the GST amounts as appropriate.
7. Correctly calculated the total price and expressed it as the final amount at the end of the
summary sheet.

Document title: LA024733_CPCCBC4004A-UNGRADED_Ed2_V02_Sk_4of4_20190714 Page 27 of 36


Resource ID: IEC_18_005_U05
Part 2: Role play
Conduct a consultation with a third party (played by a TAFE Teacher) who will play the role of the
client, Mr or Mrs Brown. You are to play the part of the builder who will be supervising the
construction of the new house for Mr & Mrs Brown. Allow 15-20 minutes to prepare for the
consultation. The recording should take no longer than 10 minutes.
The meeting is to take place in a simulated building company’s office, and the video is to initially
confirm the components that substantiate this as an office environment (e.g. desk and phone, job
records in files on a shelf or a filing cabinet, computer with screen, etc.)
Demonstrate effective communication skills that are clear and direct, use questioning to confirm
requirements and share information using concepts and language applicable to the audience.
Considerations for cultural differences must be observed (e.g. use of appropriate vocabulary). In
addition, attention must be given to non-verbal communication (including body language, facial
expression, eye contact and gestures).
The assessor will provide specific information to help you set up the role play and will observe and
record the role play by using Adobe Connect, Skype or other suitable technology.

Note: Your assessor will use the role play video recording as the evidence and assess your
performance.

Task 1: Conduct a meeting

You have organised an informal meeting with your client, Mr or Mrs Brown, to present the
preliminary estimates of the identified construction elements, directed by the Building Designer.

The purpose of the presentation is to present the cost estimate for the identified items. The objective
is to explain to the client that these are estimates only, based on the request from the Building
Designer to assist in formulating a project budget.

It is not normal industry practice to disclose the details of the cost estimates to a client, and as such
you will need to tactfully redirect any requests to show your detailed pricing.

You are to explain to the client that a final price will be worked out later once the Plans and
Specifications have been finalised and the council approval requirements have been identified.

When you are ready to undertake the role play, contact your assessor to book a time. A TAFE
Teacher will play the role of the client, while the assessor will observe you perform the role play.
Your assessor will provide specific information to help you set up the role play and will observe and
record the role play by using Adobe Connect, Skype or other suitable technology.
Note: Your assessor will use the role play video recording as the evidence and assess your
performance in it.

Document title: LA024733_CPCCBC4004A- Page 28 of 36


UNGRADED_Ed2_V02_Sk_4of4_20190714
Resource ID: IEC_18_005_U05
Document title: LA024733_CPCCBC4004A- Page 29 of 36
UNGRADED_Ed2_V02_Sk_4of4_20190714
Resource ID: IEC_18_005_U05
Role Play Preparation
The video should be no longer than 8-15 minutes.

The student should:

1. Prepare for the meeting by having a summary of your estimates and Mr and Mrs Brown’s
Alterations and Additions – V4004-619.pdf (CPCCBC4004A_AE_Sk_2of4_SR2), with you.

2. Introduce themselves and the company they work for.

3. Briefly explain the items you have priced including any labour component that you have been
asked to include.

4. Make sure the client understands these items.

5. Explain how some of these prices such as painting, and plastering would be quoted by the
trade contractor as a ‘supply and fix’ job price and will include their overheads etc.

6. Ensure that the client understands the implications of this contractor pricing arrangement.

7. Use the drawings, specifications and the contract to help explain the items being discussed.

8. Answer any questions the client may have in simple terms.

9. Ask the client questions and ensure that they understand their requirements.

10. Make a note about the client’s comments on the pricing.

Name of the student: Greetings, everyone! I'm (Student's name) from RB Holdings, and I'll be
providing several design and budget quotes for a modification and extension to their existing house
at 1 Lake Road Toronto NSW.

Mr. Brown: Thank you, sir. Hello and good morning. So, my name is Mr. Brown, and these repairs
must be made to my home.

Student: We are delighted to have you as a customer. It was extremely simple to determine the
various costs that will arise in the house after glancing at the drawings. These expenses should be
cushioned by 5-10% because the price can fluctuate based on the condition. The cost of the different
works in the extension for the first floor, including external wall cladding, floor covering, interior
lining, and painting, is estimated to be around $15660, with a buffer cost of $4000, for a total cost of
around $18800. If additional additions are made, these expenses will change.

Mr. Brown: Thank you, sir. Ok. So that also implies I won't have to worry about any additional
charges, right? Also, could you perhaps explain what the various labour costs are?

Student: These cost estimates are intended to ensure that the customer incurs no more charges
unless anything serious occurs during the construction process. Also, consider the labour cost, which
was calculated using conventional labour costs. In addition, the length of time required for
completing is specified in a strict on-time manner, with no buffer time. This is not only troublesome,

Document title: LA024733_CPCCBC4004A- Page 30 of 36


UNGRADED_Ed2_V02_Sk_4of4_20190714
Resource ID: IEC_18_005_U05
but it can also rise depending on the site's state. The total labour cost for the supply and repair job is
approximately $ 83,89,271.13.

Teacher: That's all right. What about the various vendor charges, as well as the profit margins they
typically take?

Student: Rest assured, when these expenses were anticipated, the vendor's charges as well
as the cost of ensuring that all of the products required are bought of excellent quality with
some buffer supplies as the task must be done on time were also factored in. Because
several sub-contractors will be utilised to finish the work, it has been determined that the
profit margin for these sub-contractors will be taken into account, causing the cost to rise
slightly, and it has been determined that the work on the house will be completed as quickly
as feasible. This is why the cost of these is so high: speedier work necessitates more people
working at once, raising the total cost of labour at work. As previously said, to guarantee
that costs do not exceed budget, cushion sums are taken into account to ensure that the
money flow is sufficient to complete the work on time.

Teacher: Could you perhaps explain how these costs are determined?

Student: Take a look. Mr. Brown, these costs are determined using the various drawings
provided, which make it clear about the various works required in the house to be
completed. It is extremely important to ensure that the work done on the house is of high
quality, and many of the items in the house must be repaired in order for the work to be
completed. This also implies that there will be a fee associated with the recycling of the
items that will be removed from the residence. These charges are compared to the base cost
to ensure that environmental protection rules are obeyed, making the different licences for
the house easier to get. Though you may think the price is enormous, these charges include
a number of buffer regions that, when not used, reduce the total cost by roughly 20%.

Teacher: While it's great that every conceivable expense has been assessed, don't you think
the cost estimate is a little high?

Student: Sir, since these are the general methods of ensuring a continuous flow of cash to
ensure that loss due to construction delays is eliminated to the greatest extent possible. It is
advisable to have all the materials required on order from the start so that they can arrive
on time. These cash flows must be accessible on time, which is why building costs are so
high.

Document title: LA024733_CPCCBC4004A- Page 31 of 36


UNGRADED_Ed2_V02_Sk_4of4_20190714
Resource ID: IEC_18_005_U05
Part 2: Observation Checklist
Your assessor will use an Observation Checklist to mark your performance in the Role play. This
Checklist identifies the assessment criteria used to determine whether you have successfully
completed this assessment event. Your demonstration will be used as part of the overall evidence
requirements of the unit. All the criteria must be met.

Read through each of the statements below, and when preparing for your role play, make sure that
you can clearly demonstrate each of these skills.

You will be required to answer questions about how you have demonstrated these skills after the
role play has been submitted.

Assessor Observations

Skills Observations. Did the student… S U/S Assessor Comments

1. Communication clear and easy to understand

2. Use and interpret non-verbal communication

3. Use language appropriate to cultural


differences

4. Use questioning to confirm understanding

5. Share information by using language and


concepts appropriate to cultural differences

Document title: LA024733_CPCCBC4004A- Page 32 of 36


UNGRADED_Ed2_V02_Sk_4of4_20190714
Resource ID: IEC_18_005_U05
6. Discuss contractual arrangement problem
solving

7. Communicate effectively

Document title: LA024733_CPCCBC4004A- Page 33 of 36


UNGRADED_Ed2_V02_Sk_4of4_20190714
Resource ID: IEC_18_005_U05
Part 3: Additional Questions
Additional Questions will be used by your assessor to reinforce your underpinning knowledge and
key areas of your role play.

The following questions will provide further supporting evidence of your submission. Your assessor
may ask you further questions if required.

Note your answers in the spaces provided below.

1. What is the name of the standard that is used to format estimates?

Answer:

2. Suggest two different methods that could be used to cost a construction activity (such as a
roof covering, or painting).

Answer:

3. What are the three components that make up the cost of a task?

Answer:

Document title: LA024733_CPCCBC4004A- Page 34 of 36


UNGRADED_Ed2_V02_Sk_4of4_20190714
Resource ID: IEC_18_005_U05
4. Once the estimates are completed, what are the next steps in the pricing phase?

Answer:

5. What are the possible consequences of unintentionally omitting an organisation overhead or


margin from your estimate?

Answer:

Additional Questions

Use the space below to write and record any addittional questions and answers that your assessor
has asked you.

Document title: LA024733_CPCCBC4004A- Page 35 of 36


UNGRADED_Ed2_V02_Sk_4of4_20190714
Resource ID: IEC_18_005_U05
Part 4: Assessment Feedback
NOTE: This section must have the assessor signature and student signature to complete the feedback.

Assessment outcome
☐ Satisfactory

☐ Unsatisfactory

Assessor Feedback
☐ Was the assessment event successfully completed?

☐ If no, was the resubmission/re-assessment successfully completed?

☐ Was reasonable adjustment in place for this assessment event?


If yes, ensure it is detailed on the assessment document.

Comments:

Assessor name, signature and date:

Student acknowledgement of assessment outcome


Would you like to make any comments about this assessment?

Student name, signature and date

NOTE: Make sure you have written your name at the bottom of each page of your
submission before attaching the cover sheet and submitting to your assessor for marking.

Document title: LA024733_CPCCBC4004A- Page 36 of 36


UNGRADED_Ed2_V02_Sk_4of4_20190714
Resource ID: IEC_18_005_U05