You are on page 1of 129

BUYER

SYMBOLS ORDER QUANTITY

MATERIAL
FLOW

WAITING

INFORMATION
FLOW 1
  CAD

MANNUAL
TRANSPORT

(in min)
LEAD TIME (min)

TIMELINE
in min

ELECTRONIC
FLOW

EXTERNAL
SHIPMENT

DATA BOX

KAIZEN BURST
KAIZEN BURST
2
VALUE ADDED VA/ENVA SPREADING

lead time (min)

3
CUTTING
lead time

4
SEWING
lead time

5
SHIPMENT
lead time 50400
VA
BUYER NITRAS ARTICLE NO.
RDER QUANTITY 900 ARTICLE COLOUR

FACTORY

1.1 1.2
ODS from merchandiser ODS + CUT FILE M/C
MAN POWER 1 MAN POWER
CYCLE TIME 1 CYCLE TIME
LEAD TIME 1.5 LEAD TIME

1.5 10

VA

5s implementation
2.1 2.2

Requisition slip generation Segration of fabric in store


MAN POWER 1 MAN POWER
CYCLE TIME 2 CYCLE TIME
LEAD TIME 10 LEAD TIME
BATCH SIZE 2000 m BATCH SIZE

Automatic cutting
machine

10 10

VA

VA 3.5

3.1 CPNL CHQ. UP

TABLE:4
MAN POWER 2
CYCLE TIME 300
LEAD TIME 480
CUT QTY. 900 PC
STRAIGHT
M/C: KNIFE waiting time= 5 min
VA
3.2 3.6
TABLE:6
MAN POWER 2
CYCLE TIME 200
LEAD TIME 300
CUT QTY. 400 PC
STRAIGHT
M/C: KNIFE waiting time= 5 min

VA
3.3 3.7
TABLE:3
MAN POWER 2
CYCLE TIME 50
LEAD TIME 76
CUT QTY. 100 PC

STRAIGHT
M/C: KNIFE Waiting time= 5 min

VA
3.4 3.8
TABLE:1 CPNL CHQ. UP
MAN POWER 2 MAN POWER
CYCLE TIME 20 CYCLE TIME
LEAD TIME 30 LEAD TIME
CUT QTY. 40 PC
STRAIGHT
M/C: KNIFE

886 30

VA 570

4.1

Trims sent to sewing dept


MAN POWER 1
CYCLE TIME 20
LEAD TIME 30

waiting time=480 min

510

VA

4.45
dispatch
shipment will reach customer in 35 days
7512 VSM DATE 29/07/2021-05/08/2021
GREY TEAM MEMBERS ABHINAV KRISHNA, AMISHA SAHU

BOM

TECHNICAL SERVICE

PRODUCTION PLANNING

1.2 1.3 1.4


DS + CUT FILE M/C OP Break up order creation
1 MAN POWER 1 MAN POWER
8 CYCLE TIME 8 CYCLE TIME
10 LEAD TIME 10 LEAD TIME

10 5

mplementation
Conveyor System
2.2 2.3 2.4

tion of fabric in store Receiving rolls from fabric store Cut packaging of roll & put on table
3 MAN POWER 3 MAN POWER
3 CYCLE TIME 30 CYCLE TIME
10 LEAD TIME 60 LEAD TIME
2000 m BATCH SIZE 2000 m BATCH SIZE

Manpower
Allocation

60 60

3.5 3.9 3.12

CPNL CHQ. UP CPNL CHQ. UP CPNL CHQ. UP

ting time= 5 min waiting time= 15 min waiting time= 40 min


3.6 3.10 3.13
CPNL CHQ. UP
MAN POWER
CYCLE TIME
LEAD TIME
WAITING TIME

ting time= 5 min waiting time= 15 min

3.7 3.11
CPNL CHQ. UP
MAN POWER 1
CYCLE TIME 25
LEAD TIME 30
WAITING TIME 5

iting time= 5 min

3.8
CPNL CHQ. UP
1
10
15

Process Ba

60 160

4.2

operators introduced with the garmen


supervisor
MAN POWER
CYCLE TIME
LEAD TIME

480
MISHA SAHU

ESTIMATING

ORDER ENTRY
CUSTOMER

1.4 1.5
order creation Nesting on Soft.
1 MAN POWER 1
3 CYCLE TIME 10
5 LEAD TIME 12

12 20

Conveyor System
2.5

packaging of roll & put on table Table no. 1


2 MAN POWER 2
10 CYCLE TIME 1
60 LEAD TIME 5
2000 m BATCH DIST. 210 m

5
WAITING TIME

3.12 3.14

CPNL CHQ. UP CPNL CHQ. UP

MAN POWER 1
CYCLE TIME 210
LEAD TIME 240
WAITING TIME 60

waiting time= 40 min


3.13
CPNL CHQ. UP
1
90
120
20

++

Process Balancing

240 138

4.2

4.3
s introduced with the garment by
supervisor Right skill right Person
1 MAN POWER 1
360 CYCLE TIME 45
480 LEAD TIME 60

60 3.3
1.6 1.7
Verify all sizes and parts Order releasing
MAN POWER 1 MAN POWER 1
CYCLE TIME 15 CYCLE TIME 1
LEAD TIME 20 LEAD TIME 1.5

1.5 45

2.11
Table no. 3
MAN POWER 3
CYCLE TIME 8
Conveyor System LEAD TIME 15
BATCH DIST. 300m
MACHINE MACHINE

2.1
Table no. 1
MAN POWER 3
CYCLE TIME 8
LEAD TIME 15
SPREADING BY MACHINE
BATCH DIST. 210 m
2.6 2.7

Table no.3 Table no. 4


MAN POWER 2 MAN POWER 2
CYCLE TIME 2 CYCLE TIME 4
LEAD TIME 6 LEAD TIME 11
BATCH DIST. 300m BATCH DIST. 850m

10 15
WAITING TIME WAITING TIME

50

315 3.19

SIZE Segrigation TICKETING


MAN POWER 1 MAN POWER 1
CYCLE TIME 45 CYCLE TIME 120
LEAD TIME 60 LEAD TIME 150
5.16 3.20
SIZE Segrigation TICKETING
MAN POWER 2 MAN POWER 1
CYCLE TIME 25 CYCLE TIME 90
LEAD TIME 35 LEAD TIME 105

3.17 3.21
SIZE Segrigation TICKETING
MAN POWER 1 MAN POWER 1
CYCLE TIME 20 CYCLE TIME 45
LEAD TIME 23 LEAD TIME 60

3.18 3.22
SIZE Segrigation TICKETING
MAN POWER 1 MAN POWER 2
CYCLE TIME 15 CYCLE TIME 20
LEAD TIME 20 LEAD TIME 30

345 105

VA

4.4 4.5

Shape Iron Pocket top Stitch


MAN POWER 1 MAN POWER 1
CYCLE TIME 2.67 CYCLE TIME 0.5
LEAD TIME 3.3 LEAD TIME 1
Qty 900 Qty 900

1 5.4

0.5
VA ENVA
1.8 1.9
Marker plotting in plotter Layer chart prepare
MAN POWER 1 MAN POWER 1
CYCLE TIME 30 CYCLE TIME 10
LEAD TIME 45 LEAD TIME 15

45 15

30 10

2.12
Table no. 4
MAN POWER 3
CYCLE TIME 5
LEAD TIME 10
BATCH DIST. 850
SPREADING BY MANUALLY

2.13
2.9 Table no. 6
Fabric loading + m/c setting MAN POWER 3
CYCLE TIME 26 CYCLE TIME 5
LEAD TIME 50 LEAD TIME 10
BATCH SIZE 2000m BATCH DIST. 440m
SPREADING BY MANUALLY
2.8
2.14

Table no.6 Layer slip + Table setting


MAN POWER 2 MAN POWER 2
CYCLE TIME 3 CYCLE TIME 8
LEAD TIME 8 LEAD TIME 10
BATCH DIST. 440m BATCH SIZE 2000 m

15
WAITING TIME

50 10

3.23 3.27

BUNDLING BELT LOOP MAKING


MAN POWER 2 MAN POWER 2
CYCLE TIME 25 CYCLE TIME 0.3
LEAD TIME 40 LEAD TIME 0.21
3.24
BUNDLING
MAN POWER 2
CYCLE TIME 20
LEAD TIME 30

3.25
BUNDLING
MAN POWER 2
CYCLE TIME 15
LEAD TIME 20

3.26
BUNDLING
MAN POWER 2
CYCLE TIME 10
LEAD TIME 15

105 0.21

VA VA

4.6 4.7

Pocket Bag making Side pocket Making


MAN POWER 1 MAN POWER 1
CYCLE TIME 2 CYCLE TIME 0.84
LEAD TIME 2.7 LEAD TIME 1.34
Qty 900 Qty 900

VA VA
4.24 4.25
5 thread belt loop attach
MAN POWER 1 MAN POWER 1
CYCLE TIME 1.9 CYCLE TIME 0.93
LEAD TIME 2.7 LEAD TIME 1.23
Qty 900 Qty 900

5.4 2.57

3.9 1.77
1.10
Cross check marker
MAN POWER 1
CYCLE TIME 1
LEAD TIME 3

Lead time
3

VA

VA %

VA VA
2.15 2.16

Spreading of 3 Lay Spreading of 3 lay


MAN POWER 3 MAN POWER
CYCLE TIME 7 CYCLE TIME
LEAD TIME 10 LEAD TIME
SPREADING BY MANUAL SPREADING BY
BATCH SIZE 1290 BATCH SIZE

10 5

7 3

3.28 3.29

CHALLAN GENERATION BY ERP Fabric sent to sewing dept.


MAN POWER 1 MAN POWER
CYCLE TIME 10 CYCLE TIME
LEAD TIME 30 LEAD TIME
30 45

VA VA

4.8 4.9

Hanger Loop Making Fly Zipper


MAN POWER 1 MAN POWER
CYCLE TIME 0.23 CYCLE TIME
LEAD TIME 0.26 LEAD TIME
Qty 900 Qty

VA VA
4.26 4.27
waist belt attach lable attach
MAN POWER 1 MAN POWER
CYCLE TIME 0.93 CYCLE TIME
LEAD TIME 1.93 LEAD TIME
Qty 900 Qty

VA
4.44
elastic taking with waist belt
MAN POWER 1
CYCLE TIME 0.11
LEAD TIME 0.13
Qty 900

2.32 4.52

1.27 3.71
e 123 min

40 Min

33%

2.18
If not ok
MAN POWER
CYCLE TIME
LEAD TIME

Relevant decisions taken

VA
2.16 2.17 2.19

preading of 3 lay Marker checking If ok cont. spreading


2 MAN POWER 1 MAN POWER
3 CYCLE TIME 3 CYCLE TIME
5 LEAD TIME 5 LEAD TIME
MACHINE
510

5 10

3.29

c sent to sewing dept.


2
15
45
Lead time 2039.21 min

VA 570 Min

VA% 28%
VA VA VA

4.9 4.10 4.11

Fly Zipper Knee pocket Piping Attach Knee Pocket Hemming


1 MAN POWER 1 MAN POWER
2.21 CYCLE TIME 1.2 CYCLE TIME
2.22 LEAD TIME 2 LEAD TIME
900 Qty 900 Qty

VA VA VA
4.27 4.28 4.29
lable attach waist belt end folding knee Pocket attach
1 MAN POWER 1 MAN POWER
1.5 CYCLE TIME 0.8 CYCLE TIME
2.3 LEAD TIME 1.05 LEAD TIME
900 Qty 900 Qty

3.05 3

3.71 2 2.16
automatic
spreading
machine

VA
2.18 2.20 2.24
If not ok Manual spreading Data entry on register
1 MAN POWER 3 MAN POWER 1
8 CYCLE TIME 140 CYCLE TIME 2
10 LEAD TIME 240 LEAD TIME 5
Table no. 4
t decisions taken

VA
2.19 2.21 2.25

cont. spreading Manual spreading Data entry on register


10 MAN POWER 3 MAN POWER 1
260 CYCLE TIME 60 CYCLE TIME 2
430 LEAD TIME 120 LEAD TIME 5
TABLE NO. 6

VA
2.22 2.26

Machine spreading Data entry on register


MAN POWER 2 MAN POWER 1
CYCLE TIME 35 CYCLE TIME 2
LEAD TIME 40 LEAD TIME 5
TABLE NO. 3

VA
2.23 2.27
Machine spreading Data entry on register
MAN POWER 2 MAN POWER 1
CYCLE TIME 25 CYCLE TIME 2
LEAD TIME 30 LEAD TIME 5
TABLE NO. 1

430 20

260
Bartack
machine

VA VA VA

4.11 4.12 4.13

ocket Hemming Big Velcro hemming with patch


1 MAN POWER 1 MAN POWER
0.66 CYCLE TIME 4 CYCLE TIME
1 LEAD TIME 5.2 LEAD TIME
900 Qty 900 Qty

VA
4.29
Pocket attach
1
1.5
2
900

5.2 0.98

2.16 4 0.66
Process
improvemen
t

2.28 2.32
cut extra egde of marker Pasting marker with gum tape
MAN POWER 2 MAN POWER 2
CYCLE TIME 5 CYCLE TIME 45
LEAD TIME 10 LEAD TIME 60
2.29 2.33

cut extra egde of marker Pasting marker with gum tape


MAN POWER 2 MAN POWER 2
CYCLE TIME 5 CYCLE TIME 45
LEAD TIME 10 LEAD TIME 60

2.30 2.34

cut extra egde of marker Pasting marker with gum tape


MAN POWER 2 MAN POWER 2
CYCLE TIME 5 CYCLE TIME 45
LEAD TIME 10 LEAD TIME 60

2.31 2.35
cut extra egde of marker Pasting marker with gum tape
MAN POWER 2 MAN POWER 2
CYCLE TIME 5 CYCLE TIME 45
LEAD TIME 10 LEAD TIME 60

40 240 60
VA VA

4.13 4.14

emming with patch reinforcement


1 MAN POWER 1
0.66 CYCLE TIME 1
0.98 LEAD TIME 1.5
900 Qty 900

VA
4.30
back pocket attach
MAN POWER 1
CYCLE TIME 2.6
LEAD TIME 3
Qty 900

Advance level
machine

4.5 0.35

0.66 3.6
2.36
Drilling
MAN POWER 2
CYCLE TIME 10
LEAD TIME 15
2.37

Drilling
MAN POWER 2
CYCLE TIME 10
LEAD TIME 15

2.38

Drilling
MAN POWER 2
CYCLE TIME 10
LEAD TIME 15

2.39
Drilling
MAN POWER 2
CYCLE TIME 10
LEAD TIME 15

Lead time 1020 min

VA 270 Min

VA% 26%
lazer light
marking
Folder
Folder

VA VA

4.15 4.16

piping rule pocket taking rule pocket hemming


MAN POWER 1 MAN POW 1
CYCLE TIME 0.28 CYCLE TIM 0.33
LEAD TIME 0.35 LEAD TIME 0.43
Qty 900 Qty 900

VA
4.31
rule pocket attach
MAN POW 1
CYCLE TIM 1.2
LEAD TIME 1.23
Qty 900

1.66 0.46

0.28 1.53
Folder
lazer light
marking Folder

VA VA VA

4.17 4.18 4.19

n rubber logo attach back loop making hammer loop making


MAN POW 1 MAN POWER 1 MAN POWER
CYCLE TIM 0.33 CYCLE TIME 0.25 CYCLE TIME
LEAD TIME 0.46 LEAD TIME 0.26 LEAD TIME
Qty 900 Qty 900 Qty

VA VA
4.32 4.33
back loop attach hammer loop attach
MAN POWER 1 MAN POWER
CYCLE TIME 1.15 CYCLE TIME
LEAD TIME 1.35 LEAD TIME
Qty 900 Qty

1.61 0.73

0.33 1.4 0.61


Folder

VA VA VA

4.19 4.20 4.21

mmer loop making thigh pocket making piping attach with thigh pocket
1 MAN POW 1 MAN POWER 1
0.25 CYCLE TIM 0.76 CYCLE TIME 0.38
0.28 LEAD TIME 0.83 LEAD TIME 0.43
900 Qty 900 Qty 900

VA VA VA
4.33 4.34 4.35
ammer loop attach belt loop attach thigh pocket attach with flap
1 MAN POW 1 MAN POWER 1
0.36 CYCLE TIM 1.23 CYCLE TIME 2.58
0.45 LEAD TIME 0.93 LEAD TIME 3.22
900 Qty 900 Qty 900

1.76 3.65

0.61 1.99 2.96


Bartack
machine

Folder

VA VA

4.22 4.23

flap making velcro


MAN POWER MAN POW 1
CYCLE TIM 1.3 CYCLE TIM 2
LEAD TIME 1.58 LEAD TIME 2.3
Qty 900 Qty 900

In line self
inspection

VA VA
4.36 4.37
FOA leg heamming
MAN POW 1 MAN POW 1
CYCLE TIM 1.7 CYCLE TIM 1.16
LEAD TIME 2.06 LEAD TIME 1.41
Qty 900 Qty 900

3.64 3.71 3

3 3.16
In line self
inspection

VA
4.38 4.39 4.40
end line quality check mending bar tack button hole & attach
MAN POW 1 MAN POW 1 MAN POW 2
CYCLE TIM 2 CYCLE TIM 3 CYCLE TIM 10
LEAD TIME 3 LEAD TIME 4 LEAD TIME 15
Qty 900 Qty 900 Qty 900

4 15

10
4.42
if okay sent for packing
MAN POWER 12
CYCLE TIME 960
LEAD TIME 1200
Qty 900

VA
4.41 4.43
final checking not ok sent for altration
MAN POW 1 MAN POWER 18
CYCLE TIM 1.7 CYCLE TIME 1.5
LEAD TIME 2 LEAD TIME 2
Qty 900

2 1202
Lead time

VA

VA%
2329.41 min

48.83 Min

2%
Opportunities Identified(based on participants' insight)
Waste OPERATION NO. Opportunity
Transportation 2.2,3.29,4.1 instead of manual transportation conveyer belt should be used
4.1-4.44 u-shape production line to be introduced in the sewing line(suggestion)
Excess inventory 4.1-4.3 fabrics should be distributed first among the operators ,because it creates inv
Excess motions 2.28 checking of marker by cad dept. before hand.
  4.1 fabric and trims should reach sewing dept. on same time through conveyer sy
Waiting 2.5-2.8 waiting time because of low man power , only 2 men are doing that work .
  3.5-3.14 only 1 person is doing CPNL , therefore waiting.
Overproduction 4.1-4.43 Garments are off machined but yet to do QC Checking. 30% overproduction ob
Overprocessing 2.2 numbering should be done in fabric room to reduce segration time
  4.38,4.41 Reduce no of quality check points by implementing self checking process by th
Defects 4.1-4.43 altration should be identified during the self inline checking this will save som
participants' insight)
Opportunity
instead of manual transportation conveyer belt should be used
u-shape production line to be introduced in the sewing line(suggestion)

fabrics should be distributed first among the operators ,because it creates inventory of 1 day if not done so.
checking of marker by cad dept. before hand.
fabric and trims should reach sewing dept. on same time through conveyer system, this will save time of workers .(suggestion)
waiting time because of low man power , only 2 men are doing that work .
only 1 person is doing CPNL , therefore waiting.
Garments are off machined but yet to do QC Checking. 30% overproduction observed.
numbering should be done in fabric room to reduce segration time
Reduce no of quality check points by implementing self checking process by the sewing machine operators(quality at needle point)
altration should be identified during the self inline checking this will save some time
BUYER
SYMBOLS ORDER QUANTITY

MATERIAL
FLOW

WAITING

INFORMATION
FLOW 1
  CAD

MANNUAL
TRANSPORT

(in min)
LEAD TIME (min)

TIMELINE
in min

ELECTRONIC
FLOW

EXTERNAL
SHIPMENT

DATA BOX

KAIZEN BURST
KAIZEN BURST
2
VALUE ADDED VA/ENVA SPREADING
CONVEYOR SYSTEM

lead time (min)

3
CUTTING
lead time

4
SEWING

lead time
5
SHIPMENT

lead time 50400

VA
BUYER NITRAS ARTICLE NO.
RDER QUANTITY 900 ARTICLE COLOUR

FACTORY

1.1 1.2
ODS from merchandiser ODS + CUT FILE M/C
MAN POWER 1 MAN POWER
CYCLE TIME 1 CYCLE TIME
LEAD TIME 1.5 LEAD TIME

1.5 10

VA
2.1 2.2

Requisition slip generation Segration of fabric in store


MAN POWER 1 MAN POWER
CYCLE TIME 2 CYCLE TIME
LEAD TIME 10 LEAD TIME
BATCH SIZE 2000 m BATCH SIZE

10 5

VA

VA 3.14

3.1 CPNL CHQ. UP

TABLE:4
MAN POWER 2 MAN POWER
CYCLE TIME 295 CYCLE TIME
LEAD TIME 300 LEAD TIME
CUT QTY. 900 PC
Automatic
knife
M/C: cutting

VA
3.2 3.6
TABLE:6 CPNL CHQ. UP
MAN POWER 2 MAN POWER
CYCLE TIME 145 CYCLE TIME
LEAD TIME 150 LEAD TIME
CUT QTY. 400 PC

Automatic
knife
M/C: cutting

VA
3.3 3.7
TABLE:3 CPNL CHQ. UP
MAN POWER 2 MAN POWER
CYCLE TIME 35 CYCLE TIME
LEAD TIME 38 LEAD TIME
CUT QTY. 100 PC

Automatic
knife
M/C: cutting

VA
3.4 3.8
TABLE:1 CPNL CHQ. UP
MAN POWER 2 MAN POWER
CYCLE TIME 12 CYCLE TIME
LEAD TIME 15 LEAD TIME
CUT QTY. 40 PC
Automatic
knife
M/C: cutting

503 405

VA 487

4.1
Trims sent to sewing dept
MAN POWER 1
CYCLE TIME 13
LEAD TIME 15

15

VA
4.45
dispatch

shipment will reach customer in


35 days
7512 VSM DATE 29/07/2021-05/08/2021
GREY TEAM MEMBERS ABHINAV KRISHNA, AMISHA SAHU, DEBANGS

BOM

TECHNICAL SERVICE

PRODUCTION PLANNING

1.2 1.3 1.4


DS + CUT FILE M/C OP Break up order creation
1 MAN POWER 1 MAN POWER
8 CYCLE TIME 8 CYCLE TIME
10 LEAD TIME 10 LEAD TIME

10 5

2.6
Table no.3
MAN POW 2
CYCLE TIM 1
LEAD TIME 3
BATCH DIST 300m

2.5
Table no. 1
MAN POWER 2
CYCLE TIME 1
LEAD TIME 2
BATCH DIST. 210 m
2.2 2.3 2.4
Receiving fabric rolls by conveyor system and
tion of fabric in store put on table Cut packaging of fabirc roll
3 MAN POWER 3 MAN POWER
3 CYCLE TIME 17 CYCLE TIME
5 LEAD TIME 30 LEAD TIME
2000 m BATCH SIZE 2000 m BATCH SIZE

30 15

3.14

CPNL CHQ. UP

1
210
240
3.6
CPNL CHQ. UP
1
90
120

3.7
CPNL CHQ. UP
1
25
30

3.8
CPNL CHQ. UP
1
10
15

4.3
Right skill right Person
MAN POWER
CYCLE TIME
LEAD TIME

15
MISHA SAHU, DEBANGSHU SARKAR, BHASKAR BAIRAGI

ESTIMATING

ORDER ENTRY
CUSTOMER

1.4 1.5
order creation Nesting on Soft.
1 MAN POWER 1
3 CYCLE TIME 10
5 LEAD TIME 12

12 20

2.7
Table no. 4
MAN POWER 2
CYCLE TIME 2
LEAD TIME 6 2.1
BATCH DIST. 850m Table no. 1
MAN POWER 3
2.8 CYCLE TIME 0.33
Table no.6 LEAD TIME 1.66
MAN POWER 2 SPREADING BY MACHINE
CYCLE TIME 1 BATCH DIST. 210 m
LEAD TIME 4
BATCH DIST. 440m
2.9

Cut packaging of fabirc roll AUTOMATIC Fabric loading + m/c setting


2 CYCLE TIM
5 LEAD TIME
15 BATCH SIZE
2000 m

6.64
138

4.3 4.2
operators introduced with the
Right skill right Person garment by supervisor
1
12 MAN POWER 1
15 CYCLE TIME 360
LEAD TIME 480

480 0.1
1.6 1.7
Verify all sizes and parts Order releasing
MAN POWER 1 MAN POWER
CYCLE TIME 15 CYCLE TIME
LEAD TIME 20 LEAD TIME

20 1.5

2.11
Table no. 3
MAN POWER 3
CYCLE TIME 0.33 2.12
LEAD TIME 1.66 Table no. 4
BATCH DIST. 300m MAN POWER 3
MACHINE MACHINE CYCLE TIME 0.33
LEAD TIME 1.66
BATCH DIST. 850
SPREADING BY MACHINE

2.13
Table no. 6
MAN POWER 3
CYCLE TIME 0.33
LEAD TIME 1.66
BATCH DIST. 440m
SPREADING BY MALCHINE
2.9

AUTOMATIC Fabric loading + m/c setting


1
6.64
2000m

315 3.19

SIZE Segrigation TICKETING


MAN POWER 1 MAN POWER
CYCLE TIME 45 CYCLE TIME
LEAD TIME 60 LEAD TIME
5.16 3.20
SIZE Segrigation TICKETING
MAN POWER 2 MAN POWER
CYCLE TIME 25 CYCLE TIME
LEAD TIME 35 LEAD TIME

3.17 3.21
SIZE Segrigation TICKETING
MAN POWER 1 MAN POWER
CYCLE TIME 20 CYCLE TIME
LEAD TIME 23 LEAD TIME

3.18 3.22
SIZE Segrigation TICKETING
MAN POWER 1 MAN POWER
CYCLE TIME 15 CYCLE TIME
LEAD TIME 20 LEAD TIME

138 345

VA

4.4 4.5
Automatic Shape Iron
Pocket top Stitch
MAN POWER 1 MAN POWER
CYCLE TIME 0.06 CYCLE TIME
LEAD TIME 0.1 LEAD TIME
Qty 900 Qty

0.1 1

0.5
VA
1.7 1.8
Order releasing Marker plotting in plotter
1 MAN POWER 1
1 CYCLE TIME 30
1.5 LEAD TIME 45

45 15

30
10

3.19 3.23

TICKETING BUNDLING
1 MAN POWER 2
120 CYCLE TIME 25
150 LEAD TIME 40
3.20 3.24
TICKETING BUNDLING
1 MAN POWER 2
90 CYCLE TIME 20
105 LEAD TIME 30

3.21 3.25
TICKETING BUNDLING
1 MAN POWER 2
45 CYCLE TIME 15
60 LEAD TIME 20

3.22 3.26
TICKETING BUNDLING
2 MAN POWER 2
20 CYCLE TIME 10
30 LEAD TIME 15

105 0.21

VA VA

4.5 4.6
Pocket top Stitch Pocket Bag making
1 MAN POWER 1
0.5 CYCLE TIME 2
1 LEAD TIME 2.7
1 Qty 1

VA
4.24

5 thread
MAN POWER 1
CYCLE TIME 1.9
LEAD TIME 2.7
Qty 1

5.4 2.57

0.5 3.9
ENVA
1.9 1.10
Layer chart prepare Cross check marker
MAN POWER 1 MAN POWER 1
CYCLE TIME 10 CYCLE TIME 1
LEAD TIME 15 LEAD TIME 3

10
2.14 VA

Layer slip + Table setting 2.15


MAN POWER 2 Spreading of 3 Lay
CYCLE TIME 8 MAN POWER 3
LEAD TIME 10 CYCLE TIME 3
BATCH SIZE 2000 m LEAD TIME 5
SPREADING BY MACHINE
BATCH SIZE 1290

5 5

3.27 3.28

BELT LOOP MAKING CHALLAN GENERATION BY ERP


MAN POWER 2 MAN POWER 1
CYCLE TIME 0.3 CYCLE TIME 10
LEAD TIME 0.21 LEAD TIME 30
30 20

VA VA

4.7 4.8
Side pocket Making Hanger Loop Making
MAN POWER 1 MAN POWER 1
CYCLE TIME 0.84 CYCLE TIME 0.23
LEAD TIME 1.34 LEAD TIME 0.26
Qty 1 Qty 1

VA VA
4.25 4.26

belt loop attach waist belt attach


MAN POWER 1 MAN POWER 1
CYCLE TIME 0.93 CYCLE TIME 0.93
LEAD TIME 1.23 LEAD TIME 1.93
Qty 1 Qty 1

VA
4.44
elastic taking with waist belt
MAN POWER 1
CYCLE TIME 0.11
LEAD TIME 0.13
Qty 1

2.32 4.52

1.77 1.27
Lead time 123 min

VA 40 Min

VA %
33%
VA

2.16 2.17
Spreading of 3 lay Marker checking
MAN POWER 2 MAN POWER 1
CYCLE TIME 3 CYCLE TIME 3
LEAD TIME 5 LEAD TIME 5
SPREADING BY MACHINE
BATCH SIZE 510

5 5 10

3.29

Fabric sent to sewing dept.


MAN POWER 2
CYCLE TIME 15
LEAD TIME 20
Lead time 1546.21 min

VA 487 Min
20

VA% 31%
VA VA

4.9 4.10
Fly Zipper Knee pocket Piping Attach
MAN POWER 1 MAN POWER 1
CYCLE TIME 2.21 CYCLE TIME 1.2
LEAD TIME 2.22 LEAD TIME 2
Qty 1 Qty 1

VA VA
4.27 4.28

lable attach waist belt end folding


MAN POWER 1 MAN POWER 1
CYCLE TIME 1.5 CYCLE TIME 0.8
LEAD TIME 2.3 LEAD TIME 1.05
Qty 1 Qty 1

4.52 3.05 3

3.71 2
VA
2.18 2.20
If not ok Machine spreading
MAN POWER 1 MAN POWER 2
CYCLE TIME 8 CYCLE TIME 125
LEAD TIME 10 LEAD TIME 130
Table no. 4
Relevant decisions taken

VA
2.19 2.21

spreading Machine spreading


MAN POWER 10 MAN POWER 2
CYCLE TIME 260 CYCLE TIME 75
LEAD TIME 280 LEAD TIME 80
TABLE NO. 6

VA
2.22

Machine spreading
MAN POWER 2
CYCLE TIME 35
LEAD TIME 40
TABLE NO. 3

VA
2.23
Machine spreading
MAN POWER 2
CYCLE TIME 25
LEAD TIME 30
TABLE NO. 1

10 280 20

260
VA VA

4.11 4.12
Knee Pocket Hemming Big Velcro in bartack machine
MAN POWER 1 MAN POWER 1
CYCLE TIME 0.66 CYCLE TIME 2.8
LEAD TIME 1 LEAD TIME 3.64
Qty 1 Qty 900

VA
4.29

knee Pocket attach


MAN POWER 1
CYCLE TIME 1.61
LEAD TIME 2
Qty 1

3 3.64 0.98

2.27 2.8
2.24
Data entry on register
MAN POWER 1
CYCLE TIME 2
LEAD TIME 5
2.25

Data entry on register


MAN POWER 1
CYCLE TIME 2
LEAD TIME 5

2.26

Data entry on register


MAN POWER 1
CYCLE TIME 2
LEAD TIME 5

2.27
Data entry on register
MAN POWER 1
CYCLE TIME 2
LEAD TIME 5
VA VA

4.13 4.14
hemming with patch reinforcement
MAN POWER 1 MAN POW 1
CYCLE TIME 0.66 CYCLE TIM 1
LEAD TIME 0.98 LEAD TIME 1.5
Qty 1 Qty 1

VA
4.30
back pocket attach (advance
level technology)
MAN POW 1
CYCLE TIM 0.1
LEAD TIME 0.2
Qty 1

0.98 1.7

0.66 1.1
Lead time

VA

VA%
VA VA

4.15 4.16
piping in rule pocket (folder used) rule pocket hemming (folder
used)
MAN POWER 1 MAN POWER
CYCLE TIME 0.196 CYCLE TIME
LEAD TIME 0.245 LEAD TIME
Qty 1 Qty

VA
4.31
rule pocket attach (laser
marking)
MAN POWER
CYCLE TIME
LEAD TIME
Qty

0.245 1.161

0.196 0.92
401.64 min

266 Min

66%
VA VA VA

4.16 4.17 4.18


ocket hemming (folder n rubber logo attach (laser back loop making (folder
used) light marking) used)
1 MAN POWER 1 MAN POWER 1
0.24 CYCLE TIME 0.25 CYCLE TIME 0.14
0.301 LEAD TIME 0.32 LEAD TIME 0.18
900 Qty 900 Qty 900

VA VA
4.31 4.32
pocket attach (laser back loop attach
marking)
1 MAN POWER 1
0.68 CYCLE TIME 1.15
0.86 LEAD TIME 1.35
900 Qty 900

0.32 1.53

0.92 0.25 1.29


VA VA

4.19 4.20
hammer loop making
(through folder) thigh pocket making
MAN POWER 1 MAN POWER 1
CYCLE TIME 0.156 CYCLE TIME 0.76
LEAD TIME 0.196 LEAD TIME 0.83
Qty 900 Qty 900

VA VA
4.33 4.34

hammer loop attach belt loop attach

MAN POWER 1 MAN POWER 1


CYCLE TIME 0.36 CYCLE TIME 1.23
LEAD TIME 0.45 LEAD TIME 0.93
Qty 900 Qty 900

0.646 1.76 3.521

0.516 1.99
VA VA

4.21 4.22
piping attach with thigh pocket
(folder used) flap making (folder used)
MAN POWER 1 MAN POWER 1
CYCLE TIME 0.304 CYCLE TIME 0.884
LEAD TIME 0.301 LEAD TIME 1.106
Qty 900 Qty 900

VA VA
4.35 4.36

thigh pocket attach with flap FOA

MAN POWER 1 MAN POWER 1


CYCLE TIME 2.58 CYCLE TIME 1.7
LEAD TIME 3.22 LEAD TIME 2.06
Qty 900 Qty 900

3.521 3.166 3.02

2.884 2.584
VA

4.23
velcro (bartack machine)
MAN POWER 1
CYCLE TIME 1.28
LEAD TIME 1.61
Qty 900

VA
4.37 4.38

leg heamming end line quality check

MAN POWER 1 MAN POWER 1


CYCLE TIME 1.16 CYCLE TIME 2
LEAD TIME 1.41 LEAD TIME 3
Qty 900 Qty 900

3.02 3 4

2.44
VA
4.39 4.40

mending bar tack button hole & attach

MAN POWER 1 MAN POWER 2


CYCLE TIME 3 CYCLE TIME 10
LEAD TIME 4 LEAD TIME 15
Qty 900 Qty 900

15 2

10
4.42
if okay sent for packing
MAN POWER 12
CYCLE TIME 0.75
LEAD TIME 1
Qty 900

VA
4.41 4.43

final checking not ok sent for altration

MAN POWER 1 MAN POWER 18


CYCLE TIME 1.7 CYCLE TIME 1.5
LEAD TIME 2 LEAD TIME 2
Qty 900

3
Lead time 580.649

VA 43.05

VA% 7%
min

Min

7%