VALUE ADDED VA/ENVA SPREADING
3
CUTTING
lead time
4
SEWING
lead time
5
SHIPMENT
lead time 50400
VA
BUYER NITRAS ARTICLE NO.
RDER QUANTITY 900 ARTICLE COLOUR
FACTORY
1.1 1.2
ODS from merchandiser ODS + CUT FILE M/C
MAN POWER 1 MAN POWER
CYCLE TIME 1 CYCLE TIME
LEAD TIME 1.5 LEAD TIME
1.5 10
VA
5s implementation
2.1 2.2
Automatic cutting
machine
10 10
VA
VA 3.5
TABLE:4
MAN POWER 2
CYCLE TIME 300
LEAD TIME 480
CUT QTY. 900 PC
STRAIGHT
M/C: KNIFE waiting time= 5 min
VA
3.2 3.6
TABLE:6
MAN POWER 2
CYCLE TIME 200
LEAD TIME 300
CUT QTY. 400 PC
STRAIGHT
M/C: KNIFE waiting time= 5 min
VA
3.3 3.7
TABLE:3
MAN POWER 2
CYCLE TIME 50
LEAD TIME 76
CUT QTY. 100 PC
STRAIGHT
M/C: KNIFE Waiting time= 5 min
VA
3.4 3.8
TABLE:1 CPNL CHQ. UP
MAN POWER 2 MAN POWER
CYCLE TIME 20 CYCLE TIME
LEAD TIME 30 LEAD TIME
CUT QTY. 40 PC
STRAIGHT
M/C: KNIFE
886 30
VA 570
4.1
510
VA
4.45
dispatch
shipment will reach customer in 35 days
7512 VSM DATE 29/07/2021-05/08/2021
GREY TEAM MEMBERS ABHINAV KRISHNA, AMISHA SAHU
BOM
TECHNICAL SERVICE
PRODUCTION PLANNING
10 5
mplementation
Conveyor System
2.2 2.3 2.4
tion of fabric in store Receiving rolls from fabric store Cut packaging of roll & put on table
3 MAN POWER 3 MAN POWER
3 CYCLE TIME 30 CYCLE TIME
10 LEAD TIME 60 LEAD TIME
2000 m BATCH SIZE 2000 m BATCH SIZE
Manpower
Allocation
60 60
3.7 3.11
CPNL CHQ. UP
MAN POWER 1
CYCLE TIME 25
LEAD TIME 30
WAITING TIME 5
3.8
CPNL CHQ. UP
1
10
15
Process Ba
60 160
4.2
480
MISHA SAHU
ESTIMATING
ORDER ENTRY
CUSTOMER
1.4 1.5
order creation Nesting on Soft.
1 MAN POWER 1
3 CYCLE TIME 10
5 LEAD TIME 12
12 20
Conveyor System
2.5
5
WAITING TIME
3.12 3.14
MAN POWER 1
CYCLE TIME 210
LEAD TIME 240
WAITING TIME 60
++
Process Balancing
240 138
4.2
4.3
s introduced with the garment by
supervisor Right skill right Person
1 MAN POWER 1
360 CYCLE TIME 45
480 LEAD TIME 60
60 3.3
1.6 1.7
Verify all sizes and parts Order releasing
MAN POWER 1 MAN POWER 1
CYCLE TIME 15 CYCLE TIME 1
LEAD TIME 20 LEAD TIME 1.5
1.5 45
2.11
Table no. 3
MAN POWER 3
CYCLE TIME 8
Conveyor System LEAD TIME 15
BATCH DIST. 300m
MACHINE MACHINE
2.1
Table no. 1
MAN POWER 3
CYCLE TIME 8
LEAD TIME 15
SPREADING BY MACHINE
BATCH DIST. 210 m
2.6 2.7
10 15
WAITING TIME WAITING TIME
50
315 3.19
3.17 3.21
SIZE Segrigation TICKETING
MAN POWER 1 MAN POWER 1
CYCLE TIME 20 CYCLE TIME 45
LEAD TIME 23 LEAD TIME 60
3.18 3.22
SIZE Segrigation TICKETING
MAN POWER 1 MAN POWER 2
CYCLE TIME 15 CYCLE TIME 20
LEAD TIME 20 LEAD TIME 30
345 105
VA
4.4 4.5
1 5.4
0.5
VA ENVA
1.8 1.9
Marker plotting in plotter Layer chart prepare
MAN POWER 1 MAN POWER 1
CYCLE TIME 30 CYCLE TIME 10
LEAD TIME 45 LEAD TIME 15
45 15
30 10
2.12
Table no. 4
MAN POWER 3
CYCLE TIME 5
LEAD TIME 10
BATCH DIST. 850
SPREADING BY MANUALLY
2.13
2.9 Table no. 6
Fabric loading + m/c setting MAN POWER 3
CYCLE TIME 26 CYCLE TIME 5
LEAD TIME 50 LEAD TIME 10
BATCH SIZE 2000m BATCH DIST. 440m
SPREADING BY MANUALLY
2.8
2.14
15
WAITING TIME
50 10
3.23 3.27
3.25
BUNDLING
MAN POWER 2
CYCLE TIME 15
LEAD TIME 20
3.26
BUNDLING
MAN POWER 2
CYCLE TIME 10
LEAD TIME 15
105 0.21
VA VA
4.6 4.7
VA VA
4.24 4.25
5 thread belt loop attach
MAN POWER 1 MAN POWER 1
CYCLE TIME 1.9 CYCLE TIME 0.93
LEAD TIME 2.7 LEAD TIME 1.23
Qty 900 Qty 900
5.4 2.57
3.9 1.77
1.10
Cross check marker
MAN POWER 1
CYCLE TIME 1
LEAD TIME 3
Lead time
3
VA
VA %
VA VA
2.15 2.16
10 5
7 3
3.28 3.29
VA VA
4.8 4.9
VA VA
4.26 4.27
waist belt attach lable attach
MAN POWER 1 MAN POWER
CYCLE TIME 0.93 CYCLE TIME
LEAD TIME 1.93 LEAD TIME
Qty 900 Qty
VA
4.44
elastic taking with waist belt
MAN POWER 1
CYCLE TIME 0.11
LEAD TIME 0.13
Qty 900
2.32 4.52
1.27 3.71
e 123 min
40 Min
33%
2.18
If not ok
MAN POWER
CYCLE TIME
LEAD TIME
VA
2.16 2.17 2.19
5 10
3.29
VA 570 Min
VA% 28%
VA VA VA
VA VA VA
4.27 4.28 4.29
lable attach waist belt end folding knee Pocket attach
1 MAN POWER 1 MAN POWER
1.5 CYCLE TIME 0.8 CYCLE TIME
2.3 LEAD TIME 1.05 LEAD TIME
900 Qty 900 Qty
3.05 3
3.71 2 2.16
automatic
spreading
machine
VA
2.18 2.20 2.24
If not ok Manual spreading Data entry on register
1 MAN POWER 3 MAN POWER 1
8 CYCLE TIME 140 CYCLE TIME 2
10 LEAD TIME 240 LEAD TIME 5
Table no. 4
t decisions taken
VA
2.19 2.21 2.25
VA
2.22 2.26
VA
2.23 2.27
Machine spreading Data entry on register
MAN POWER 2 MAN POWER 1
CYCLE TIME 25 CYCLE TIME 2
LEAD TIME 30 LEAD TIME 5
TABLE NO. 1
430 20
260
Bartack
machine
VA VA VA
VA
4.29
Pocket attach
1
1.5
2
900
5.2 0.98
2.16 4 0.66
Process
improvemen
t
2.28 2.32
cut extra egde of marker Pasting marker with gum tape
MAN POWER 2 MAN POWER 2
CYCLE TIME 5 CYCLE TIME 45
LEAD TIME 10 LEAD TIME 60
2.29 2.33
2.30 2.34
2.31 2.35
cut extra egde of marker Pasting marker with gum tape
MAN POWER 2 MAN POWER 2
CYCLE TIME 5 CYCLE TIME 45
LEAD TIME 10 LEAD TIME 60
40 240 60
VA VA
4.13 4.14
VA
4.30
back pocket attach
MAN POWER 1
CYCLE TIME 2.6
LEAD TIME 3
Qty 900
Advance level
machine
4.5 0.35
0.66 3.6
2.36
Drilling
MAN POWER 2
CYCLE TIME 10
LEAD TIME 15
2.37
Drilling
MAN POWER 2
CYCLE TIME 10
LEAD TIME 15
2.38
Drilling
MAN POWER 2
CYCLE TIME 10
LEAD TIME 15
2.39
Drilling
MAN POWER 2
CYCLE TIME 10
LEAD TIME 15
VA 270 Min
VA% 26%
lazer light
marking
Folder
Folder
VA VA
4.15 4.16
VA
4.31
rule pocket attach
MAN POW 1
CYCLE TIM 1.2
LEAD TIME 1.23
Qty 900
1.66 0.46
0.28 1.53
Folder
lazer light
marking Folder
VA VA VA
VA VA
4.32 4.33
back loop attach hammer loop attach
MAN POWER 1 MAN POWER
CYCLE TIME 1.15 CYCLE TIME
LEAD TIME 1.35 LEAD TIME
Qty 900 Qty
1.61 0.73
VA VA VA
mmer loop making thigh pocket making piping attach with thigh pocket
1 MAN POW 1 MAN POWER 1
0.25 CYCLE TIM 0.76 CYCLE TIME 0.38
0.28 LEAD TIME 0.83 LEAD TIME 0.43
900 Qty 900 Qty 900
VA VA VA
4.33 4.34 4.35
ammer loop attach belt loop attach thigh pocket attach with flap
1 MAN POW 1 MAN POWER 1
0.36 CYCLE TIM 1.23 CYCLE TIME 2.58
0.45 LEAD TIME 0.93 LEAD TIME 3.22
900 Qty 900 Qty 900
1.76 3.65
Folder
VA VA
4.22 4.23
In line self
inspection
VA VA
4.36 4.37
FOA leg heamming
MAN POW 1 MAN POW 1
CYCLE TIM 1.7 CYCLE TIM 1.16
LEAD TIME 2.06 LEAD TIME 1.41
Qty 900 Qty 900
3.64 3.71 3
3 3.16
In line self
inspection
VA
4.38 4.39 4.40
end line quality check mending bar tack button hole & attach
MAN POW 1 MAN POW 1 MAN POW 2
CYCLE TIM 2 CYCLE TIM 3 CYCLE TIM 10
LEAD TIME 3 LEAD TIME 4 LEAD TIME 15
Qty 900 Qty 900 Qty 900
4 15
10
4.42
if okay sent for packing
MAN POWER 12
CYCLE TIME 960
LEAD TIME 1200
Qty 900
VA
4.41 4.43
final checking not ok sent for altration
MAN POW 1 MAN POWER 18
CYCLE TIM 1.7 CYCLE TIME 1.5
LEAD TIME 2 LEAD TIME 2
Qty 900
2 1202
Lead time
VA
VA%
2329.41 min
48.83 Min
2%
Opportunities Identified(based on participants' insight)
Waste OPERATION NO. Opportunity
Transportation 2.2,3.29,4.1 instead of manual transportation conveyer belt should be used
4.1-4.44 u-shape production line to be introduced in the sewing line(suggestion)
Excess inventory 4.1-4.3 fabrics should be distributed first among the operators ,because it creates inv
Excess motions 2.28 checking of marker by cad dept. before hand.
4.1 fabric and trims should reach sewing dept. on same time through conveyer sy
Waiting 2.5-2.8 waiting time because of low man power , only 2 men are doing that work .
3.5-3.14 only 1 person is doing CPNL , therefore waiting.
Overproduction 4.1-4.43 Garments are off machined but yet to do QC Checking. 30% overproduction ob
Overprocessing 2.2 numbering should be done in fabric room to reduce segration time
4.38,4.41 Reduce no of quality check points by implementing self checking process by th
Defects 4.1-4.43 altration should be identified during the self inline checking this will save som
participants' insight)
Opportunity
instead of manual transportation conveyer belt should be used
u-shape production line to be introduced in the sewing line(suggestion)
fabrics should be distributed first among the operators ,because it creates inventory of 1 day if not done so.
checking of marker by cad dept. before hand.
fabric and trims should reach sewing dept. on same time through conveyer system, this will save time of workers .(suggestion)
waiting time because of low man power , only 2 men are doing that work .
only 1 person is doing CPNL , therefore waiting.
Garments are off machined but yet to do QC Checking. 30% overproduction observed.
numbering should be done in fabric room to reduce segration time
Reduce no of quality check points by implementing self checking process by the sewing machine operators(quality at needle point)
altration should be identified during the self inline checking this will save some time
BUYER
SYMBOLS ORDER QUANTITY
MATERIAL
FLOW
WAITING
INFORMATION
FLOW 1
CAD
MANNUAL
TRANSPORT
(in min)
LEAD TIME (min)
TIMELINE
in min
ELECTRONIC
FLOW
EXTERNAL
SHIPMENT
DATA BOX
KAIZEN BURST
KAIZEN BURST
2
VALUE ADDED VA/ENVA SPREADING
CONVEYOR SYSTEM
3
CUTTING
lead time
4
SEWING
lead time
5
SHIPMENT
VA
BUYER NITRAS ARTICLE NO.
RDER QUANTITY 900 ARTICLE COLOUR
FACTORY
1.1 1.2
ODS from merchandiser ODS + CUT FILE M/C
MAN POWER 1 MAN POWER
CYCLE TIME 1 CYCLE TIME
LEAD TIME 1.5 LEAD TIME
1.5 10
VA
2.1 2.2
10 5
VA
VA 3.14
TABLE:4
MAN POWER 2 MAN POWER
CYCLE TIME 295 CYCLE TIME
LEAD TIME 300 LEAD TIME
CUT QTY. 900 PC
Automatic
knife
M/C: cutting
VA
3.2 3.6
TABLE:6 CPNL CHQ. UP
MAN POWER 2 MAN POWER
CYCLE TIME 145 CYCLE TIME
LEAD TIME 150 LEAD TIME
CUT QTY. 400 PC
Automatic
knife
M/C: cutting
VA
3.3 3.7
TABLE:3 CPNL CHQ. UP
MAN POWER 2 MAN POWER
CYCLE TIME 35 CYCLE TIME
LEAD TIME 38 LEAD TIME
CUT QTY. 100 PC
Automatic
knife
M/C: cutting
VA
3.4 3.8
TABLE:1 CPNL CHQ. UP
MAN POWER 2 MAN POWER
CYCLE TIME 12 CYCLE TIME
LEAD TIME 15 LEAD TIME
CUT QTY. 40 PC
Automatic
knife
M/C: cutting
503 405
VA 487
4.1
Trims sent to sewing dept
MAN POWER 1
CYCLE TIME 13
LEAD TIME 15
15
VA
4.45
dispatch
BOM
TECHNICAL SERVICE
PRODUCTION PLANNING
10 5
2.6
Table no.3
MAN POW 2
CYCLE TIM 1
LEAD TIME 3
BATCH DIST 300m
2.5
Table no. 1
MAN POWER 2
CYCLE TIME 1
LEAD TIME 2
BATCH DIST. 210 m
2.2 2.3 2.4
Receiving fabric rolls by conveyor system and
tion of fabric in store put on table Cut packaging of fabirc roll
3 MAN POWER 3 MAN POWER
3 CYCLE TIME 17 CYCLE TIME
5 LEAD TIME 30 LEAD TIME
2000 m BATCH SIZE 2000 m BATCH SIZE
30 15
3.14
CPNL CHQ. UP
1
210
240
3.6
CPNL CHQ. UP
1
90
120
3.7
CPNL CHQ. UP
1
25
30
3.8
CPNL CHQ. UP
1
10
15
4.3
Right skill right Person
MAN POWER
CYCLE TIME
LEAD TIME
15
MISHA SAHU, DEBANGSHU SARKAR, BHASKAR BAIRAGI
ESTIMATING
ORDER ENTRY
CUSTOMER
1.4 1.5
order creation Nesting on Soft.
1 MAN POWER 1
3 CYCLE TIME 10
5 LEAD TIME 12
12 20
2.7
Table no. 4
MAN POWER 2
CYCLE TIME 2
LEAD TIME 6 2.1
BATCH DIST. 850m Table no. 1
MAN POWER 3
2.8 CYCLE TIME 0.33
Table no.6 LEAD TIME 1.66
MAN POWER 2 SPREADING BY MACHINE
CYCLE TIME 1 BATCH DIST. 210 m
LEAD TIME 4
BATCH DIST. 440m
2.9
6.64
138
4.3 4.2
operators introduced with the
Right skill right Person garment by supervisor
1
12 MAN POWER 1
15 CYCLE TIME 360
LEAD TIME 480
480 0.1
1.6 1.7
Verify all sizes and parts Order releasing
MAN POWER 1 MAN POWER
CYCLE TIME 15 CYCLE TIME
LEAD TIME 20 LEAD TIME
20 1.5
2.11
Table no. 3
MAN POWER 3
CYCLE TIME 0.33 2.12
LEAD TIME 1.66 Table no. 4
BATCH DIST. 300m MAN POWER 3
MACHINE MACHINE CYCLE TIME 0.33
LEAD TIME 1.66
BATCH DIST. 850
SPREADING BY MACHINE
2.13
Table no. 6
MAN POWER 3
CYCLE TIME 0.33
LEAD TIME 1.66
BATCH DIST. 440m
SPREADING BY MALCHINE
2.9
315 3.19
3.17 3.21
SIZE Segrigation TICKETING
MAN POWER 1 MAN POWER
CYCLE TIME 20 CYCLE TIME
LEAD TIME 23 LEAD TIME
3.18 3.22
SIZE Segrigation TICKETING
MAN POWER 1 MAN POWER
CYCLE TIME 15 CYCLE TIME
LEAD TIME 20 LEAD TIME
138 345
VA
4.4 4.5
Automatic Shape Iron
Pocket top Stitch
MAN POWER 1 MAN POWER
CYCLE TIME 0.06 CYCLE TIME
LEAD TIME 0.1 LEAD TIME
Qty 900 Qty
0.1 1
0.5
VA
1.7 1.8
Order releasing Marker plotting in plotter
1 MAN POWER 1
1 CYCLE TIME 30
1.5 LEAD TIME 45
45 15
30
10
3.19 3.23
TICKETING BUNDLING
1 MAN POWER 2
120 CYCLE TIME 25
150 LEAD TIME 40
3.20 3.24
TICKETING BUNDLING
1 MAN POWER 2
90 CYCLE TIME 20
105 LEAD TIME 30
3.21 3.25
TICKETING BUNDLING
1 MAN POWER 2
45 CYCLE TIME 15
60 LEAD TIME 20
3.22 3.26
TICKETING BUNDLING
2 MAN POWER 2
20 CYCLE TIME 10
30 LEAD TIME 15
105 0.21
VA VA
4.5 4.6
Pocket top Stitch Pocket Bag making
1 MAN POWER 1
0.5 CYCLE TIME 2
1 LEAD TIME 2.7
1 Qty 1
VA
4.24
5 thread
MAN POWER 1
CYCLE TIME 1.9
LEAD TIME 2.7
Qty 1
5.4 2.57
0.5 3.9
ENVA
1.9 1.10
Layer chart prepare Cross check marker
MAN POWER 1 MAN POWER 1
CYCLE TIME 10 CYCLE TIME 1
LEAD TIME 15 LEAD TIME 3
10
2.14 VA
5 5
3.27 3.28
VA VA
4.7 4.8
Side pocket Making Hanger Loop Making
MAN POWER 1 MAN POWER 1
CYCLE TIME 0.84 CYCLE TIME 0.23
LEAD TIME 1.34 LEAD TIME 0.26
Qty 1 Qty 1
VA VA
4.25 4.26
VA
4.44
elastic taking with waist belt
MAN POWER 1
CYCLE TIME 0.11
LEAD TIME 0.13
Qty 1
2.32 4.52
1.77 1.27
Lead time 123 min
VA 40 Min
VA %
33%
VA
2.16 2.17
Spreading of 3 lay Marker checking
MAN POWER 2 MAN POWER 1
CYCLE TIME 3 CYCLE TIME 3
LEAD TIME 5 LEAD TIME 5
SPREADING BY MACHINE
BATCH SIZE 510
5 5 10
3.29
VA 487 Min
20
VA% 31%
VA VA
4.9 4.10
Fly Zipper Knee pocket Piping Attach
MAN POWER 1 MAN POWER 1
CYCLE TIME 2.21 CYCLE TIME 1.2
LEAD TIME 2.22 LEAD TIME 2
Qty 1 Qty 1
VA VA
4.27 4.28
4.52 3.05 3
3.71 2
VA
2.18 2.20
If not ok Machine spreading
MAN POWER 1 MAN POWER 2
CYCLE TIME 8 CYCLE TIME 125
LEAD TIME 10 LEAD TIME 130
Table no. 4
Relevant decisions taken
VA
2.19 2.21
VA
2.22
Machine spreading
MAN POWER 2
CYCLE TIME 35
LEAD TIME 40
TABLE NO. 3
VA
2.23
Machine spreading
MAN POWER 2
CYCLE TIME 25
LEAD TIME 30
TABLE NO. 1
10 280 20
260
VA VA
4.11 4.12
Knee Pocket Hemming Big Velcro in bartack machine
MAN POWER 1 MAN POWER 1
CYCLE TIME 0.66 CYCLE TIME 2.8
LEAD TIME 1 LEAD TIME 3.64
Qty 1 Qty 900
VA
4.29
3 3.64 0.98
2.27 2.8
2.24
Data entry on register
MAN POWER 1
CYCLE TIME 2
LEAD TIME 5
2.25
2.26
2.27
Data entry on register
MAN POWER 1
CYCLE TIME 2
LEAD TIME 5
VA VA
4.13 4.14
hemming with patch reinforcement
MAN POWER 1 MAN POW 1
CYCLE TIME 0.66 CYCLE TIM 1
LEAD TIME 0.98 LEAD TIME 1.5
Qty 1 Qty 1
VA
4.30
back pocket attach (advance
level technology)
MAN POW 1
CYCLE TIM 0.1
LEAD TIME 0.2
Qty 1
0.98 1.7
0.66 1.1
Lead time
VA
VA%
VA VA
4.15 4.16
piping in rule pocket (folder used) rule pocket hemming (folder
used)
MAN POWER 1 MAN POWER
CYCLE TIME 0.196 CYCLE TIME
LEAD TIME 0.245 LEAD TIME
Qty 1 Qty
VA
4.31
rule pocket attach (laser
marking)
MAN POWER
CYCLE TIME
LEAD TIME
Qty
0.245 1.161
0.196 0.92
401.64 min
266 Min
66%
VA VA VA
VA VA
4.31 4.32
pocket attach (laser back loop attach
marking)
1 MAN POWER 1
0.68 CYCLE TIME 1.15
0.86 LEAD TIME 1.35
900 Qty 900
0.32 1.53
4.19 4.20
hammer loop making
(through folder) thigh pocket making
MAN POWER 1 MAN POWER 1
CYCLE TIME 0.156 CYCLE TIME 0.76
LEAD TIME 0.196 LEAD TIME 0.83
Qty 900 Qty 900
VA VA
4.33 4.34
0.516 1.99
VA VA
4.21 4.22
piping attach with thigh pocket
(folder used) flap making (folder used)
MAN POWER 1 MAN POWER 1
CYCLE TIME 0.304 CYCLE TIME 0.884
LEAD TIME 0.301 LEAD TIME 1.106
Qty 900 Qty 900
VA VA
4.35 4.36
2.884 2.584
VA
4.23
velcro (bartack machine)
MAN POWER 1
CYCLE TIME 1.28
LEAD TIME 1.61
Qty 900
VA
4.37 4.38
3.02 3 4
2.44
VA
4.39 4.40
15 2
10
4.42
if okay sent for packing
MAN POWER 12
CYCLE TIME 0.75
LEAD TIME 1
Qty 900
VA
4.41 4.43
3
Lead time 580.649
VA 43.05
VA% 7%