Scientific Material Summary Form


Remote Summer Training 1441 H

Obaida mazen Student


Name
#
437036567
alsibai
Material
Type
 Specialized Course
Installing a
monolithic
Hrs
Title concrete slab Earned
2
from start to
finish

Scientific Material Summary

The video was focused on the beginning of a small construction project


urging that the slab to be cast had dimensions of 10 * 20. The clip started
with drilling work. A small drilling machine was used. The drilling level
was confirmed by using a tool that I could not recognize, but it could be
used to measure the levels instead From there, work began on forming
the formwork blocks, and the metal mesh used in the casting of ground
concrete was used. It is indicated that the beams are designed to be lower
than the slab, that is, the level of pouring the slab is the level of the beam
as well.
The casting process has been completed perfectly and a straightening
machine has been found and it has a vibrating device that has saved a lot
of time and effort in leveling the concrete surface.
Then a simple stomach consisting of a long stick at the end of which
used a wide plastic piece to settle the concrete before it hardened. Then
the concrete leveling fan (helicopter) was used. The concrete pouring
and leveling process was performed perfectly and it is indicated that the
casting and forming process took only a few hours.