Professional Documents
Culture Documents
Note: Answer THREE full questions from Part A and Part B questions are compulsory.
Qn. PART A Marks CO
No.
1. a) Define Unit Hydrograph. Explain with a neat sketch, the COs: 1
derivation of Unit Hydrograph. State it’s assumptions, 6M K: 2
applications and Limitations
OR
2. a) Define runoff. Explain the factors affecting runoff 4M COs:1
b) Define i) Time of Concentration, ii) Isochrone 2M K: 2
OR
4. a) Find the ordinates of rainfall resulting from a storm with rainfalls COs: 2
of 2.50, 6.85 and 3.75 cm each during successive 3 hours. The K: 3
ordinates of 3-hr UH are given below. Assume ɸ - index = 2.5
mm/hr and base flow = 12 cumec.
Time (hr) 3 6 9 12 15 18 21 24 3 6 6M
Ordinates of
3-hr UH 0 115 370 510 395 315 252 231 127 112
(m3/s)
Time (hr) 9 12 15 18 21 24
Ordinates of 3-hr UH (m3/s) 96 64 43 25 12 0
PART B
7. Innovative question COs:3
Mr Ramesh is an Irrigation Engineer. He is required to develop a K: 4
remotely controlled device for farming which can
measure infiltration rate after every watering.
monitor soil health parameters.
warn on low soil moisture.
6M
As students of hydrology and geotechnical engineering, help Mr Ramesh
by brainstorming the device by drawing the flow diagram and briefing the
working of the same.
( Hint- soil health parameters such as pH, N, P, K, microbes, nutrients,
organic matter, root health etc)
8. Case Study Question COs: 4
In the case study titled “Urban Flood Forecast System - A Case study of K: 4
Bangalore, India”, authored by Shubha Avinash et al., comprehend the
following
a) significant reasons for urban flooding in Bangalore 2M
b) working principle of Flood forecast system. 2M
c) case study at Sub basin in Koramangala Chellaghatta Valley. 2M