ID Task 

Task Name System  Duration Start Finish 017 August 2017 September 2017 October 2017 November 2017
Mode Number 06 09 12 15 18 21 24 27 30 02 05 08 11 14 17 20 23 26 29 01 04 07 10 13 16 19 22 25 28 01 04 07 10 13 16 19 22 25 28 31 03 06 09 12 15 18 21 24 2
1
2 EMERGENCY GENERATION 141A3-04 7 days Tue 11/07/17 Sun 16/07/17 Vendor To finish
3 MV POWER DISTRIBUTION 14203-01 1 day Tue 11/07/17 Tue 11/07/17 Completed ‐ Waiting of RFSU Dossier
4 LV POWER DISTRIBUTION SS1 14203-02 1 day Tue 11/07/17 Tue 11/07/17 Completed ‐ Waiting of RFSU Dossier
5 LV POWER DISTRIBUTION SS2 14203-03 1 day Tue 11/07/17 Tue 11/07/17 Completed ‐ Waiting of RFSU Dossier
6 141A-UP-301 230V AC UPS - SS1 14203-06 1 day Tue 11/07/17 Tue 11/07/17 Completed ‐ Waiting of RFSU Dossier
7 141A-UP-302 230V AC UPS - SS1 14203-07 1 day Tue 11/07/17 Tue 11/07/17 Completed ‐ Waiting of RFSU Dossier
8 141A-UP-303 110V DC UPS - SS1 14203-08 1 day Tue 11/07/17 Tue 11/07/17 Completed ‐ Waiting of RFSU Dossier
9 141A-UP-304 230V AC UPS - SS2 14203-10 1 day Tue 11/07/17 Tue 11/07/17 Completed ‐ Waiting of RFSU Dossier
10 141A-UP-306 110V DC UPS - SS2 14203-11 1 day Tue 11/07/17 Tue 11/07/17 Completed ‐ Waiting of RFSU Dossier
11 POWER MANAGEMENT SYSTEM 14203-15 1 day Tue 11/07/17 Tue 11/07/17 Completed ‐ Waiting of RFSU Dossier
12 REGGANE - DCS SYSTEM 14204-01 1 day Tue 11/07/17 Tue 11/07/17 Completed ‐ Waiting of RFSU Dossier
13 REGGANE - ESD SYSTEM 14204-02 1 day Tue 11/07/17 Tue 11/07/17 Completed ‐ Waiting of RFSU Dossier
14 REGGANE - F&G SYSTEM 14204-03 1 day Tue 11/07/17 Tue 11/07/17 Completed ‐ Waiting of RFSU Dossier
15 RG1 GATHERING STATION 13102-01 1 day Tue 11/07/17 Tue 11/07/17 Completed ‐ Waiting of RFSU Dossier
16 DIESEL STORAGE SYSTEM 141A5-01 1 day Tue 11/07/17 Tue 11/07/17 Completed ‐ Waiting of RFSU Dossier
17 REGGANE - F&G DETECTORS 14204-04 30 days Tue 11/07/17 Fri 04/08/17
18 MAIN CONTROL BUILDING 141B05-0160 days Tue 11/07/17 Wed 30/08/17
19 SUBSTATION 1 (Building) 141B06-0140 days Tue 11/07/17 Sun 13/08/17
20 SUBSTATION 2 (Building) 141B07-0150 days Tue 11/07/17 Mon 21/08/17
21 CIVIL, EARTH COMPLETION 14105-01 60 days Tue 11/07/17 Wed 30/08/17
22 INSTRUMENT & UTILITY AIR 141A7-01 74 days Mon 17/07/17Sat 16/09/17
23 Loop Checking 15 days Mon 17/07/17 Sat 29/07/17 Vendor 1st call
24 Service  Leak Test IA  Utilitie Area 4 days Tue 25/07/17 Fri 28/07/17
25 Portable IA & Drayir Connection 1 day Fri 28/07/17 Sat 29/07/17
26 IA Compressor Package ‐ Running Test 7 days Thu 24/08/17 Tue 29/08/17 Vendor 2nd call
27 IA Servise Leak Test Process Area 15 days Wed 23/08/17 Mon 04/09/17
28 UA Servise Leak Test 15 days Mon 04/09/17 Sat 16/09/17
29 FIELD EMERGENCY LIGHTING 14203-05 30 days Sat 15/07/17 Wed 09/08/17
30 FIELD NORMAL LIGHTING 14203-04 30 days Wed 09/08/17 Sun 03/09/17
31 WATER WELL P-802 141A8-02 5 days Thu 20/07/17 Sun 23/07/17
32 Loop Checking 2 days Thu 20/07/17 Fri 21/07/17
33 Functional Test ‐ Desander 3 days Fri 21/07/17 Sun 23/07/17
34 RAW WATER SYSTEM 141A8-03 16 days Thu 20/07/17 Wed 02/08/17
35 Loop Checking 2 days Thu 20/07/17 Fri 21/07/17
36 Tank box‐up 1 day Thu 20/07/17 Thu 20/07/17
37 Raw water pumps running test 2 days Sat 29/07/17 Mon 31/07/17
38 Control Narrative Functional Test 2 days Mon 31/07/17 Wed 02/08/17
39 POWER GENERATION TRAIN C 141A3-03 28.75 daysTue 11/07/17 Fri 04/08/17
40 Lube Oil Flushing 15 days Tue 11/07/17 Sun 23/07/17
41 Final Aligment 3 days Sun 23/07/17 Wed 26/07/17 Vendor
42 Loop Checking 5 days Tue 25/07/17 Fri 28/07/17
43 Control Narrative Functional Test 3 days Fri 28/07/17 Mon 31/07/17
44 Coolers and oil pumps runnig test 2 days Mon 31/07/17 Wed 02/08/17
45 Waste Heat Recovey Unit ‐ Functional Test 2 days Mon 31/07/17 Wed 02/08/17 Vendor
46 Turbine Cranking 2 days Wed 02/08/17 Fri 04/08/17
47 GTG C Ready for Start ‐ Up 0 days Fri 04/08/17 Fri 04/08/17 04/08
48 POWER GENERATION TRAIN A 141A3-01 25.75 daysMon 17/07/17Tue 08/08/17
49 Lube Oil Flushing 15 days Mon 17/07/17 Sat 29/07/17
50 Final Aligment 3 days Sun 30/07/17 Tue 01/08/17 Vendor
51 Loop Checking 5 days Fri 28/07/17 Wed 02/08/17 Vendor

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline

Project: Commissioning Schedule  Split External Tasks Inactive Summary Manual Summary Progress


Date: Sun 16/07/17 Milestone External Milestone Manual Task Start‐only
Summary Inactive Task Duration‐only Finish‐only

Page 1
ID Task  Task Name System  Duration Start Finish 017 August 2017 September 2017 October 2017 November 2017
Mode Number 06 09 12 15 18 21 24 27 30 02 05 08 11 14 17 20 23 26 29 01 04 07 10 13 16 19 22 25 28 01 04 07 10 13 16 19 22 25 28 31 03 06 09 12 15 18 21 24 2
52 Control Functional Test 3 days Wed 02/08/17 Fri 04/08/17 Vendor
53 Coolers and oil pumps runnig test 2 days Fri 04/08/17 Sun 06/08/17 Vendor
54 Waste Heat Recovey Unit ‐ Functional Test 2 days Fri 04/08/17 Sun 06/08/17 Vendor
55 Turbine Cranking 2 days Sun 06/08/17 Tue 08/08/17 Vendor
56 GTG C Ready for Start ‐ Up 0 days Tue 08/08/17 Tue 08/08/17 08/08
57 POWER GENERATION TRAIN B 141A3-02 38.75 daysTue 11/07/17 Sat 12/08/17
58 Lube Oil Flushing 15 days Mon 24/07/17 Sat 05/08/17
59 Final Aligment 3 days Sat 05/08/17 Tue 08/08/17 Vendor
60 Loop Checking 5 days Wed 02/08/17 Sun 06/08/17 Vendor
61 Control Functional Test 3 days Sun 06/08/17 Wed 09/08/17 Vendor
62 Coolers and oil pumps runnig test 2 days Wed 09/08/17 Fri 11/08/17 Vendor
63 Waste Heat Recovey Unit ‐ Functional Test 2 days Wed 09/08/17 Fri 11/08/17 Vendor
64 Turbine Cranking 2 days Fri 11/08/17 Sat 12/08/17 Vendor
65 GTG C Ready for Start ‐ Up 0 days Sat 12/08/17 Sat 12/08/17 12/08
66 HEATING MEDIUM SYSTEM 141A1-01 4 days Tue 11/07/17 Fri 14/07/17
67 HEATING MEDIUM SYSTEM 141A1-01 20 days Sat 02/09/17 Mon 18/09/17
68 Loop Checking 10 days Sat 02/09/17 Sun 10/09/17
69 Vessels Box up 1 day Sat 02/09/17 Sat 02/09/17
70 HM Circulation pumps running test 1 day Sun 10/09/17 Mon 11/09/17
71 ESD System ‐ Functional Test 3 days Sun 10/09/17 Wed 13/09/17
72 Control Narrative ‐ Functional Test 2 days Wed 13/09/17 Fri 15/09/17
73 HM heater Dry Out 5 days Fri 15/09/17 Mon 18/09/17 Sub‐contract / LPG
74 CHEMICAL & CORROSION 141A4-01 4 days Thu 20/07/17 Sat 22/07/17
75 Chloride Injection 2 days Thu 20/07/17 Fri 21/07/17 Vendor for Reparation
76 Biocide Injection 2 days Fri 21/07/17 Sat 22/07/17
77 LOCAL TECHNICAL ROOM 1 141B13-0119 days Tue 25/07/17 Thu 10/08/17
78 Power supply and Ligthing 2 days Tue 25/07/17 Wed 26/07/17
79 HVAC 10 days Thu 27/07/17 Fri 04/08/17
80 Panels & FAP 7 days Fri 04/08/17 Thu 10/08/17
81 Telecom 5 days Sun 30/07/17 Fri 04/08/17
82 SERVICE WATER SYSTEM 141A8-04 12 days Thu 10/08/17 Sat 19/08/17
83 Loop Checking 5 days Thu 10/08/17 Sun 13/08/17 Vendor
84 Tank box‐up 1 day Thu 10/08/17 Fri 11/08/17
85 Raw water pumps running test 5 days Sun 13/08/17 Fri 18/08/17
86 Control Narrative Functional Test 2 days Fri 18/08/17 Sat 19/08/17
87 DM WATER SYSTEM 141A8-05 10 days Sun 13/08/17 Tue 22/08/17
88 Loop Checking 5 days Sun 13/08/17 Fri 18/08/17 Vendor
89 Control System ‐ Functional Test 5 days Fri 18/08/17 Tue 22/08/17
90 Unit Start‐up 2 days Sat 19/08/17 Mon 21/08/17
91 FIRE WATER SYSTEM 141A9-01 14 days Sat 19/08/17 Fri 01/09/17
92 Loop Checking 2 days Sat 19/08/17 Mon 21/08/17
93 Jokey pumps running test 2 days Mon 21/08/17 Wed 23/08/17
94 Diesel pumps running test 6 days Wed 23/08/17 Mon 28/08/17
95 Process Narrative Functional Test 2 days Mon 28/08/17 Wed 30/08/17
96 Network purging and service test 2 days Wed 30/08/17 Fri 01/09/17
97 FOAM SYSTEM 141A9-02 8 days Fri 01/09/17 Thu 07/09/17
98 Loop Checking 2 days Fri 01/09/17 Sat 02/09/17
99 Foam Concentrated  pumps running test 2 days Sat 02/09/17 Sun 03/09/17
100 Process Narrative Functional Test 2 days Sun 03/09/17 Tue 05/09/17
101 Network purging and service test 2 days Tue 05/09/17 Thu 07/09/17
102 DELUGE SYSTEM 141A9-03 6 days Fri 01/09/17 Tue 05/09/17

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline

Project: Commissioning Schedule  Split External Tasks Inactive Summary Manual Summary Progress


Date: Sun 16/07/17 Milestone External Milestone Manual Task Start‐only
Summary Inactive Task Duration‐only Finish‐only

Page 2
ID Task  Task Name System  Duration Start Finish 017 August 2017 September 2017 October 2017 November 2017
Mode Number 06 09 12 15 18 21 24 27 30 02 05 08 11 14 17 20 23 26 29 01 04 07 10 13 16 19 22 25 28 01 04 07 10 13 16 19 22 25 28 31 03 06 09 12 15 18 21 24 2
103 Network purging and service test 6 days Fri 01/09/17 Tue 05/09/17
104 F&G Narrative Functional Test 6 days Fri 01/09/17 Tue 05/09/17
105 HP GAS FLARE SYSTEM 14171-01 9 days Tue 15/08/17 Tue 22/08/17
106 Loop Checking 2 days Tue 15/08/17 Wed 16/08/17
107 Vessels Box up 2 days Tue 15/08/17 Wed 16/08/17
108 Control Narrative ‐ Functional Test ‐ Pilot Light 2 days Thu 17/08/17 Fri 18/08/17 Vendor
up
109 ESD System ‐ Functional Test 2 days Fri 18/08/17 Sat 19/08/17
110 Gross Air Leak test ‐ 14171‐LTL‐7‐001 3 days Sat 19/08/17 Tue 22/08/17 PIUL ‐ 12/12 shift
111 LP FLARE SYSTEM 14171-02 10 days Thu 17/08/17 Fri 25/08/17
112 Loop Checking 2 days Thu 17/08/17 Fri 18/08/17
113 Vessels Box up 2 days Thu 17/08/17 Fri 18/08/17
114 Control Narrative ‐ Functional Test ‐ Pilot Light 2 days Fri 18/08/17 Sat 19/08/17
up
115 ESD System ‐ Functional Test 2 days Sat 19/08/17 Mon 21/08/17
116 Gross Air Leak test ‐ 14171‐LTL‐2‐001 3 days Tue 22/08/17 Fri 25/08/17 PIUL ‐ 12/12 shift
117 INLET GAS FACILITIES 14111-01 21 days Tue 15/08/17 Fri 01/09/17
118 Loop Checking 2 days Tue 15/08/17 Wed 16/08/17
119 Vessels Box up 2 days Tue 15/08/17 Wed 16/08/17
120 Control Narrative ‐ Functional Test 2 days Thu 17/08/17 Fri 18/08/17
121 ESD System ‐ Functional Test 2 days Fri 18/08/17 Sat 19/08/17
122 Leak Test of LTLs:   13100‐LTL‐7‐001 / 82‐11 4 days Tue 22/08/17 Fri 25/08/17
123 Gross Air Leak test ‐ 13100‐LTL‐7‐001 2 days Tue 22/08/17 Thu 24/08/17 PIUL/HT ‐ 12/12 shift
124 HP N2 Leak Test ‐ 13100‐LTL‐82‐011 2 days Thu 24/08/17 Fri 25/08/17 PIUL/HT ‐ 12/12 shift
125 Leak Test of LTLs: 13112‐LTL‐7‐001 / 73‐001 4 days Fri 25/08/17 Tue 29/08/17
126 Gross Air Leak test ‐ 14112‐LTL‐7‐001 2 days Fri 25/08/17 Sun 27/08/17 PIUL/HT ‐ 12/12 shift
127 HP N2 Leak Test ‐ 114112‐LTL‐73‐001 2 days Sun 27/08/17 Tue 29/08/17 PIUL/HT ‐ 12/12 shift
128 Leak Test of LTLs: 13111‐LTL‐7‐001 / 75‐001 4 days Tue 29/08/17 Fri 01/09/17
129 Gross Air Leak test ‐ 14111‐LTL‐7‐001 2 days Tue 29/08/17 Thu 31/08/17 PIUL/HT ‐ 12/12 shift
130 HP N2 Leak Test ‐ 14111‐LTL‐75‐001 2 days Thu 31/08/17 Fri 01/09/17 PIUL/HT ‐ 12/12 shift
131 CHEMICAL STORAGE BUILDING 141B08-01
132 CLOSED DRAIN SYSTEM 141A6-03 6 days Sun 20/08/17 Fri 25/08/17
133 Loop Checking 1 day Sun 20/08/17 Sun 20/08/17
134 Vessels Box up 1 day Sun 20/08/17 Sun 20/08/17
135 Gross Air Leak test ‐ 13100‐LTL‐7‐001 3 days Mon 21/08/17 Wed 23/08/17 PIUL ‐ 12/12 shift
136 Close draing pump runnisng test 1 day Thu 24/08/17 Thu 24/08/17
137 Control Narrative ‐ Functional Test 1 day Fri 25/08/17 Fri 25/08/17
138 CONDENSATE SYSTEM 14131-01 39 days Mon 21/08/17Fri 22/09/17
139 Loop Checking 3 days Mon 21/08/17 Wed 23/08/17
140 Vessels Box up 1 day Mon 21/08/17 Mon 21/08/17
141 Gross Air Leak test ‐ 14131‐LTL‐8‐001 2 days Tue 22/08/17 Wed 23/08/17 PIUL ‐ 12/12 shift
142 Gross Air Leak test ‐ 14151‐LTL‐7‐001 2 days Thu 24/08/17 Fri 25/08/17 PIUL ‐ 12/12 shift
143 Gross Air Leak test ‐ 14151‐LTL‐3.5‐001 2 days Tue 19/09/17 Thu 21/09/17 PIUL ‐ 12/12 shift
144 ESD System ‐ Functional Test 1 day Thu 24/08/17 Thu 24/08/17
145 Deasalter feed pump running test 1 day Fri 25/08/17 Fri 25/08/17
146 Control Narrative ‐ Functional Test ‐  1 day Fri 25/08/17 Fri 25/08/17
Treatment & out of spec
147 Export pump running test 1 day Thu 21/09/17 Fri 22/09/17
148 Control Narrative ‐ Functional Test ‐ Storage 1 day Fri 22/09/17 Fri 22/09/17

149 PRODUCE WATER TREATMENT 14181-01 6 days Fri 25/08/17 Thu 31/08/17

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline

Project: Commissioning Schedule  Split External Tasks Inactive Summary Manual Summary Progress


Date: Sun 16/07/17 Milestone External Milestone Manual Task Start‐only
Summary Inactive Task Duration‐only Finish‐only

Page 3
ID Task  Task Name System  Duration Start Finish 017 August 2017 September 2017 October 2017 November 2017
Mode Number 06 09 12 15 18 21 24 27 30 02 05 08 11 14 17 20 23 26 29 01 04 07 10 13 16 19 22 25 28 01 04 07 10 13 16 19 22 25 28 31 03 06 09 12 15 18 21 24 2
150 Loop Checking 1 day Fri 25/08/17 Sat 26/08/17
151 Vessels Box up 2 days Fri 25/08/17 Sun 27/08/17
152 Gross Air Leak test ‐ 14181‐LTL‐7‐001 2 days Sun 27/08/17 Tue 29/08/17 PIUL ‐ 12/12 shift
153 ESD System ‐ Functional Test 1 day Tue 29/08/17 Wed 30/08/17
154 Control Narrative ‐ Functional Test  1 day Wed 30/08/17 Thu 31/08/17
155 FUEL GAS SYSTEM 141A2-01 8.63 days Thu 31/08/17 Thu 07/09/17
156 Loop Checking 3 days Thu 31/08/17 Sat 02/09/17
157 Vessels Box up 1 day Thu 31/08/17 Fri 01/09/17
158 Gross Air Leak test ‐ 141A2‐LTL‐7‐001 2 days Fri 01/09/17 Sat 02/09/17 PIUL/HT ‐ 12/12 shift
159 HP N2 Leak Test ‐ 141A2‐LTL‐85‐001 1 day Sun 03/09/17 Sun 03/09/17 PIUL/HT ‐ 12/12 shift
160 Gross Air Leak test ‐ 141A2‐LTL‐7‐002 2 days Sun 03/09/17 Tue 05/09/17 PIUL/HT ‐ 12/12 shift
161 HP N2 Leak Test ‐ 141A2‐LTL‐85‐002 1 day Tue 05/09/17 Wed 06/09/17 PIUL/HT ‐ 12/12 shift
162 Gross Air Leak test ‐ 141A2‐LTL‐3.5‐001 2 days Tue 05/09/17 Thu 07/09/17 PIUL ‐ 12/12 shift
163 ESD System ‐ Functional Test 1 day Sat 02/09/17 Sun 03/09/17
164 Control Narrative ‐ Functional Test  1 day Sun 03/09/17 Mon 04/09/17
165 REGGANE - SAFETY SYSTEM 14205-01 15 days Fri 25/08/17 Wed 06/09/17
166 OPEN DRAIN SYSTEM 141A6-02 1 day Tue 11/07/17 Tue 11/07/17
167 OILY WATER DRAIN SYSTEM 141A6-01 1 day Tue 11/07/17 Tue 11/07/17
168 TELECOM PAGA SS1, SS2, MCB 14401-09 16 days Tue 01/08/17 Mon 14/08/17
169 TELECOM PAGA FIELD 14401-19 26 days Mon 14/08/17 Tue 05/09/17
170 TELECOM PAGA BUILDINGS 14401-16 30 days Tue 05/09/17 Fri 29/09/17
171 AMINE SWEETENING 14121-01 78.88 daysTue 11/07/17 Fri 15/09/17
172 Loop Checking 3 days Sat 02/09/17 Tue 05/09/17
173 Vessels Box up 4 days Sat 02/09/17 Wed 06/09/17
174 ESD System ‐ Functional Test 1 day Tue 05/09/17 Wed 06/09/17
175 Gross Air Leak test ‐ 14120‐LTL‐7‐001 2 days Wed 06/09/17 Fri 08/09/17 PIUL/HT ‐ 12/12 shift
176 HP N2 Leak Test ‐ 14120‐LTL‐75‐001 2 days Fri 08/09/17 Sat 09/09/17 PIUL/HT ‐ 12/12 shift
177 Gross Air Leak test ‐ 14120‐LTL‐7‐002 2 days Sat 09/09/17 Mon 11/09/17 PIUL/HT ‐ 12/12 shift
178 HP N2 Leak Test ‐ 14120‐LTL‐75‐002 2 days Mon 11/09/17 Wed 13/09/17 PIUL/HT ‐ 12/12 shift
179 Wash Water circulation pump running test 1 day Wed 13/09/17 Thu 14/09/17
180 Wash Water make‐up pump running test 1 day Thu 14/09/17 Fri 15/09/17
181 Control Narrative ‐ Functional Test  1 day Tue 11/07/17 Tue 11/07/17
182 AMINE SUMP 14124-01 3 days Tue 05/09/17 Fri 08/09/17
183 Loop Checking 1 day Tue 05/09/17 Wed 06/09/17
184 Tank box‐up 1 day Tue 05/09/17 Wed 06/09/17
185 Amine drain  pump running test 1 day Wed 06/09/17 Thu 07/09/17 DM Water
186 Control Narrative Functional Test 1 day Thu 07/09/17 Fri 08/09/17
187 AMINE STORAGE 14123‐01 3 days Wed 06/09/17Fri 08/09/17
188 Loop Checking 1 day Wed 06/09/17 Thu 07/09/17
189 Tank box‐up 1 day Wed 06/09/17 Thu 07/09/17
190 ESD System ‐ Functional Test 1 day Thu 07/09/17 Fri 08/09/17
191 Amine make‐up pump running test 1 day Thu 07/09/17 Fri 08/09/17 DM Water
192 Control Narrative Functional Test 1 day Fri 08/09/17 Fri 08/09/17
193 AMINE REGENERATION 14122-01 34 days Thu 07/09/17 Thu 05/10/17
194 Loop Checking 6 days Thu 07/09/17 Mon 11/09/17
195 Vessel, Colum & Tank Box up 3 days Thu 07/09/17 Sat 09/09/17
196 ESD System ‐ Functional Test 2 days Mon 11/09/17 Wed 13/09/17
197 Amine Booster pump running test 1 day Wed 13/09/17 Thu 14/09/17 EDG
198 Degreasing 15 days Thu 14/09/17 Wed 27/09/17 PIUL/HT ‐ 12/12 shift
199 Amine Transfer pump running test 1 day Wed 27/09/17 Thu 28/09/17
200 Gross Air Leak test ‐ 14120‐LTL‐7‐003 3 days Wed 27/09/17 Fri 29/09/17 PIUL ‐ 12/12 shift

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline

Project: Commissioning Schedule  Split External Tasks Inactive Summary Manual Summary Progress


Date: Sun 16/07/17 Milestone External Milestone Manual Task Start‐only
Summary Inactive Task Duration‐only Finish‐only

Page 4
ID Task  Task Name System  Duration Start Finish 017 August 2017 September 2017 October 2017 November 2017
Mode Number 06 09 12 15 18 21 24 27 30 02 05 08 11 14 17 20 23 26 29 01 04 07 10 13 16 19 22 25 28 01 04 07 10 13 16 19 22 25 28 31 03 06 09 12 15 18 21 24 2
201 Gross Air Leak test ‐ 14120‐LTL‐7‐004 3 days Fri 29/09/17 Sun 01/10/17 PIUL ‐ 12/12 shift
202 Lean Amine Circulation pump running test 1 day Sun 01/10/17 Mon 02/10/17 EDG
203 Control Narrative ‐ Functional Test  3 days Mon 02/10/17 Thu 05/10/17
204 GAS DEHYDRATION 14141-01 71 days Sat 05/08/17 Wed 04/10/17
205 Piping Retrojetting ‐ Compression Circuit 7 days Thu 31/08/17 Tue 05/09/17 PIUL/HT ‐ 12/12 shift
206 Loop Checking 12 days Tue 05/09/17 Fri 15/09/17
207 Vessels & Heater Box up 3 days Tue 05/09/17 Fri 08/09/17
208 Molecular sieve loading & box‐up 40 days Sat 05/08/17 Fri 08/09/17
209 ESD System ‐ Functional Test 3 days Fri 15/09/17 Mon 18/09/17
210 Compressors Lube oil flushing and Control  30 days Sat 05/08/17 Thu 31/08/17
Functional test
211 Compressors Solor run motor test 3 days Thu 31/08/17 Sat 02/09/17 EDG
212 Compressors Final Aligment 4 days Sat 02/09/17 Tue 05/09/17 Vendor
213 Gross Air Leak test ‐ 14140‐LTL‐7‐001 2 days Mon 18/09/17 Wed 20/09/17 PIUL/HT ‐ 12/12 shift
214 HP N2 Leak Test ‐ 14140‐LTL‐75‐001 2 days Wed 20/09/17 Fri 22/09/17 PIUL/HT ‐ 12/12 shift
215 Gross Air Leak test ‐ 14140‐LTL‐7‐002 2 days Fri 22/09/17 Sat 23/09/17 PIUL/HT ‐ 12/12 shift
216 HP N2 Leak Test ‐ 14140‐LTL‐75‐002 2 days Sat 23/09/17 Sun 24/09/17 PIUL/HT ‐ 12/12 shift
217 Gross Air Leak test ‐ 14140‐LTL‐7‐003 2 days Sun 24/09/17 Tue 26/09/17 PIUL/HT ‐ 12/12 shift
218 HP N2 Leak Test ‐ 14140‐LTL‐75‐003 2 days Tue 26/09/17 Thu 28/09/17 PIUL/HT ‐ 12/12 shift
219 Control Narrative ‐ Functional Test  2 days Thu 28/09/17 Fri 29/09/17
220 Heater Dry out 5 days Fri 29/09/17 Wed 04/10/17 Sub‐contract / LPG
221 GAS DEW POINT 14142-01 20.88 daysThu 31/08/17 Sun 17/09/17
222 Piping Retrojetting 3 days Tue 05/09/17 Fri 08/09/17 PIUL/HT ‐ 12/12 shift
223 Loop Checking 6 days Fri 08/09/17 Wed 13/09/17
224 Vessels  Box up 1 day Tue 12/09/17 Wed 13/09/17
225 ESD System ‐ Functional Test 1 day Wed 13/09/17 Thu 14/09/17
226 Gross Air Leak test ‐ 14140‐LTL‐7‐004 2 days Wed 13/09/17 Fri 15/09/17 PIUL/HT ‐ 12/12 shift
227 HP N2 Leak Test ‐ 14140‐LTL‐75‐004 2 days Fri 15/09/17 Sat 16/09/17 PIUL/HT ‐ 12/12 shift
228 TBX Lube Oil Flushing 10 days Thu 31/08/17 Fri 08/09/17
229 Control Narrative ‐ Functional Test  1 day Sat 16/09/17 Sun 17/09/17
230 EXPORT COMPRESSOR TRAIN A 14191-01 42.88 daysSat 02/09/17 Sun 08/10/17
231 Piping Retrojetting 5 days Fri 08/09/17 Tue 12/09/17 PIUL/HT ‐ 12/12 shift
232 Compressor Final Aligment 1 day Tue 12/09/17 Wed 13/09/17 Vendor
233 Loop Checking 15 days Tue 12/09/17 Sun 24/09/17
234 Vessels Box up 1 day Tue 12/09/17 Wed 13/09/17
235 ESD System ‐ Functional Test 2 days Sun 24/09/17 Tue 26/09/17
236 Compressor Lube Oil Flushing 21 days Sat 02/09/17 Wed 20/09/17
237 Motor Solor Run test ‐ VFD configuration 3 days Wed 20/09/17 Fri 22/09/17 EDG
238 Gross Air Leak test ‐ 14190‐LTL‐7‐001 2 days Thu 28/09/17 Fri 29/09/17 PIUL/HT ‐ 12/12 shift
239 HP N2 Leak Test ‐ 14190‐LTL‐75‐001 2 days Fri 29/09/17 Sun 01/10/17 PIUL/HT ‐ 12/12 shift
240 Gross Air Leak test ‐ 14190‐LTL‐7‐004 2 days Sun 01/10/17 Tue 03/10/17 PIUL/HT ‐ 12/12 shift
241 HP N2 Leak Test ‐ 14190‐LTL‐95‐001 2 days Tue 03/10/17 Thu 05/10/17 PIUL/HT ‐ 12/12 shift
242 Control Narrative ‐ Functional Test  2 days Thu 05/10/17 Fri 06/10/17
243 Compressor Running Test 2 days Fri 06/10/17 Sun 08/10/17
244 EXPORT COMPRESSOR TRAIN B 14191-02 39 days Tue 12/09/17 Sat 14/10/17
245 Piping Retrojetting 5 days Tue 12/09/17 Sat 16/09/17 PIUL/HT ‐ 12/12 shift
246 Compressor Final Aligment 1 day Sat 16/09/17 Sun 17/09/17 Vendor
247 Loop Checking 15 days Sat 16/09/17 Fri 29/09/17
248 Vessels Box up 1 day Sat 16/09/17 Sun 17/09/17
249 ESD System ‐ Functional Test 2 days Fri 29/09/17 Sat 30/09/17
250 Compressor Lube Oil Flushing 21 days Wed 20/09/17 Sat 07/10/17

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline

Project: Commissioning Schedule  Split External Tasks Inactive Summary Manual Summary Progress


Date: Sun 16/07/17 Milestone External Milestone Manual Task Start‐only
Summary Inactive Task Duration‐only Finish‐only

Page 5
ID Task  Task Name System  Duration Start Finish 017 August 2017 September 2017 October 2017 November 2017
Mode Number 06 09 12 15 18 21 24 27 30 02 05 08 11 14 17 20 23 26 29 01 04 07 10 13 16 19 22 25 28 01 04 07 10 13 16 19 22 25 28 31 03 06 09 12 15 18 21 24 2
251 Motor Solor Run test ‐ VFD configuration 3 days Sat 07/10/17 Tue 10/10/17 EDG
252 Gross Air Leak test ‐ 14190‐LTL‐7‐002 2 days Thu 05/10/17 Fri 06/10/17 PIUL/HT ‐ 12/12 shift
253 HP N2 Leak Test ‐ 14190‐LTL‐75‐002 2 days Fri 06/10/17 Sun 08/10/17 PIUL/HT ‐ 12/12 shift
254 Gross Air Leak test ‐ 14190‐LTL‐7‐005 2 days Sun 08/10/17 Mon 09/10/17 PIUL/HT ‐ 12/12 shift
255 HP N2 Leak Test ‐ 14190‐LTL‐95‐005 2 days Tue 10/10/17 Wed 11/10/17 PIUL/HT ‐ 12/12 shift
256 Control Narrative ‐ Functional Test  2 days Thu 12/10/17 Fri 13/10/17
257 Compressor Running Test 2 days Fri 13/10/17 Sat 14/10/17
258 HP NITROGEN SYSTEM 141AA-02 113.88 dayTue 11/07/17 Fri 13/10/17
259 Loop Checking 1 day Tue 10/10/17 Wed 11/10/17
260 ESD System ‐ Functional Test 1 day Wed 11/10/17 Wed 11/10/17
261 Gross Air Leak test ‐ 141AA‐LTL‐8‐002 2 days Thu 12/10/17 Fri 13/10/17 PIUL/HT ‐ 12/12 shift
262 HP N2 Leak Test ‐ 1141AA‐LTL‐200‐002 1 day Fri 13/10/17 Fri 13/10/17 PIUL/HT ‐ 12/12 shift
263 Control Narrative ‐ Functional Test  1 day Tue 11/07/17 Tue 11/07/17
264 FISCAL, BUY BACK METERING 14192-01 6 days Fri 13/10/17 Tue 17/10/17
265 Loop Checking 1 day Fri 13/10/17 Fri 13/10/17
266 ESD System ‐ Functional Test 1 day Fri 13/10/17 Fri 13/10/17
267 Gross Air Leak test ‐ 15100‐LTL‐7‐005 2 days Fri 13/10/17 Sun 15/10/17 PIUL/HT ‐ 12/12 shift
268 HP N2 Leak Test ‐ 15100‐LTL‐85‐005 1 day Sun 15/10/17 Mon 16/10/17 PIUL/HT ‐ 12/12 shift
269 Control Narrative ‐ Functional Test  1 day Mon 16/10/17 Tue 17/10/17
270 EXPORT PIPELINE 15101-01 18 days Sun 08/10/17 Mon 23/10/17
271 Loop Checking 5 days Sun 08/10/17 Fri 13/10/17
272 ESD System ‐ Functional Test 5 days Fri 13/10/17 Mon 16/10/17
273 N2 Purging  2 days Mon 16/10/17 Wed 18/10/17 PIUL/HT
274 Control Narrative ‐ Functional Test  2 days Wed 18/10/17 Fri 20/10/17
275 HP N2 Leak Test ‐ 15100‐LTL‐85‐001 1 day Wed 18/10/17 Thu 19/10/17 PIUL/HT
276 HP N2 Leak Test ‐ 15100‐LTL‐85‐003 1 day Thu 19/10/17 Fri 20/10/17 PIUL/HT
277 HP N2 Leak Test ‐ 15100‐LTL‐85‐004 4 days Fri 20/10/17 Mon 23/10/17 PIUL/HT
278 NITROGEN 141AA-01
279 RG1 WELLHEAD - RG-08 13101-02 31.25 daysTue 11/07/17 Sat 05/08/17
280 Power System 4 days Tue 11/07/17 Fri 14/07/17
281 Loop Checking 4 days Tue 11/07/17 Fri 14/07/17
282 WHCP Lube Oil flushing and configuration 5 days Sat 15/07/17 Wed 19/07/17 Vendor
283 ESD System ‐ Functional Test 1 day Wed 19/07/17 Thu 20/07/17
284 RTU Comunication test 1 day Thu 20/07/17 Fri 21/07/17
285 HP N2 Leak Test ‐ 13100‐LTL‐279‐002 2 days Thu 03/08/17 Fri 04/08/17 PIUL/HT
286 HP N2 Leak Test ‐ 13100‐LTL‐82‐002 1 day Fri 04/08/17 Sat 05/08/17 PIUL/HT
287 Flow line Purging 1 day Sat 05/08/17 Sat 05/08/17 PIUL/HT
288 RG1 WELLHEAD - RG-05 13101-01 35.25 daysTue 11/07/17 Wed 09/08/17
289 Power System 4 days Tue 11/07/17 Fri 14/07/17
290 Loop Checking 4 days Tue 11/07/17 Fri 14/07/17
291 WHCP Lube Oil flushing and configuration 5 days Wed 19/07/17 Sun 23/07/17 Vendor
292 ESD System ‐ Functional Test 1 day Sun 23/07/17 Mon 24/07/17
293 RTU Comunication test 1 day Mon 24/07/17 Tue 25/07/17
294 HP N2 Leak Test ‐ 13100‐LTL‐279‐001 2 days Sat 05/08/17 Mon 07/08/17 PIUL/HT
295 HP N2 Leak Test ‐ 13100‐LTL‐82‐001 1 day Mon 07/08/17 Tue 08/08/17 PIUL/HT
296 Flow line Purging 1 day Tue 08/08/17 Wed 09/08/17 PIUL/HT
297 RG1 WELLHEAD - RG-06 13101-05 38.25 daysTue 11/07/17 Fri 11/08/17
298 Power System 4 days Tue 11/07/17 Fri 14/07/17
299 Loop Checking 4 days Tue 11/07/17 Fri 14/07/17
300 WHCP Lube Oil flushing and configuration 5 days Sun 23/07/17 Fri 28/07/17 Vendor
301 ESD System ‐ Functional Test 1 day Fri 28/07/17 Fri 28/07/17

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline

Project: Commissioning Schedule  Split External Tasks Inactive Summary Manual Summary Progress


Date: Sun 16/07/17 Milestone External Milestone Manual Task Start‐only
Summary Inactive Task Duration‐only Finish‐only

Page 6
ID Task  Task Name System  Duration Start Finish 017 August 2017 September 2017 October 2017 November 2017
Mode Number 06 09 12 15 18 21 24 27 30 02 05 08 11 14 17 20 23 26 29 01 04 07 10 13 16 19 22 25 28 01 04 07 10 13 16 19 22 25 28 31 03 06 09 12 15 18 21 24 2
302 RTU Comunication test 1 day Fri 28/07/17 Sat 29/07/17
303 HP N2 Leak Test ‐ 13100‐LTL‐279‐006 2 days Tue 08/08/17 Thu 10/08/17 PIUL/HT
304 HP N2 Leak Test ‐ 13100‐LTL‐82‐006 1 day Thu 10/08/17 Fri 11/08/17 PIUL/HT
305 Flow line Purging 1 day Fri 11/08/17 Fri 11/08/17 PIUL/HT
306 RG1 WELLHEAD - RG-13 13101-07 31.88 daysThu 20/07/17 Tue 15/08/17
307 Power System 4 days Thu 20/07/17 Sat 22/07/17
308 Loop Checking 4 days Thu 20/07/17 Sat 22/07/17
309 WHCP Lube Oil flushing and configuration 5 days Fri 28/07/17 Tue 01/08/17 Vendor
310 ESD System ‐ Functional Test 1 day Tue 01/08/17 Wed 02/08/17
311 RTU Comunication test 1 day Wed 02/08/17 Thu 03/08/17
312 HP N2 Leak Test ‐ 13100‐LTL‐279‐008 2 days Fri 11/08/17 Sun 13/08/17 PIUL/HT
313 HP N2 Leak Test ‐ 13100‐LTL‐82‐008 1 day Sun 13/08/17 Mon 14/08/17 PIUL/HT
314 Flow line Purging 1 day Mon 14/08/17 Tue 15/08/17 PIUL/HT
315 RG1 WELLHEAD - RG-16 13101-08 29.5 days Tue 25/07/17 Fri 18/08/17
316 Power System 4 days Tue 25/07/17 Fri 28/07/17
317 Loop Checking 4 days Tue 25/07/17 Fri 28/07/17
318 WHCP Lube Oil flushing and configuration 5 days Tue 01/08/17 Sat 05/08/17 Vendor
319 ESD System ‐ Functional Test 1 day Sat 05/08/17 Sat 05/08/17
320 RTU Comunication test 1 day Sat 05/08/17 Sun 06/08/17
321 HP N2 Leak Test ‐ 13100‐LTL‐279‐009 2 days Tue 15/08/17 Thu 17/08/17 PIUL/HT
322 HP N2 Leak Test ‐ 13100‐LTL‐82‐009 1 day Thu 17/08/17 Fri 18/08/17 PIUL/HT
323 Flow line Purging 1 day Fri 18/08/17 Fri 18/08/17 PIUL/HT
324 RG1 GATHERING STATION 13102-01 49.25 daysTue 11/07/17 Sun 20/08/17
325  Power System 4 days Tue 11/07/17 Fri 14/07/17
326  Loop Checking 2 days Fri 14/07/17 Sat 15/07/17
327  RTU Comunication test 1 day Sun 06/08/17 Mon 07/08/17
328  HP N2 Leak Test ‐ 13100‐LTL‐82‐005 2 days Fri 18/08/17 Sun 20/08/17 PIUL/HT
329 Trunkline RG1 to GTP 1 day Sun 20/08/17 Sun 20/08/17 PIUL/HT
330 RG2 GATHERING STATION 13102-02 35.5 days Tue 25/07/17 Wed 23/08/17
331  Power System 1 day Tue 25/07/17 Tue 25/07/17
332  Loop Checking 1 day Wed 26/07/17 Wed 26/07/17
333  RTU Comunication test 1 day Sun 06/08/17 Mon 07/08/17
334  HP N2 Leak Test ‐ 13100‐LTL‐82‐010 2 days Mon 21/08/17 Tue 22/08/17 PIUL/HT
335 Trunkline RG1 to GTP 1 day Wed 23/08/17 Wed 23/08/17 PIUL/HT
336 KL2 WELLHEAD - KL-25 33101-07 128.88 dayTue 11/07/17 Fri 27/10/17
337 Power System 4 days Tue 11/07/17 Fri 14/07/17
338 Loop Checking 4 days Tue 11/07/17 Fri 14/07/17
339 WHCP Lube Oil flushing and configuration 5 days Wed 19/07/17 Sun 23/07/17 Vendor
340 ESD System ‐ Functional Test 1 day Sun 23/07/17 Mon 24/07/17
341 RTU Comunication test 1 day Mon 24/07/17 Tue 25/07/17
342 HP N2 Leak Test ‐ 33100‐LTL‐290‐006 2 days Mon 23/10/17 Wed 25/10/17 PIUL/HT
343 HP N2 Leak Test ‐ 33100‐LTL‐112‐006 1 day Wed 25/10/17 Thu 26/10/17 PIUL/HT
344 Flow line Purging 1 day Thu 26/10/17 Fri 27/10/17 PIUL/HT
345 KL2 WELLHEAD - KL-26 33101-08 131.88 dayTue 11/07/17 Sat 28/10/17
346 Power System 4 days Tue 11/07/17 Fri 14/07/17
347 Loop Checking 4 days Tue 11/07/17 Fri 14/07/17
348 WHCP Lube Oil flushing and configuration 5 days Sun 23/07/17 Fri 28/07/17 Vendor
349 ESD System ‐ Functional Test 1 day Fri 28/07/17 Fri 28/07/17
350 RTU Comunication test 1 day Fri 28/07/17 Sat 29/07/17
351 HP N2 Leak Test ‐ 33100‐LTL‐290‐007 2 days Thu 26/10/17 Fri 27/10/17 PIUL/HT
352 HP N2 Leak Test ‐ 33100‐LTL‐112‐007 1 day Fri 27/10/17 Sat 28/10/17 PIUL/HT

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline

Project: Commissioning Schedule  Split External Tasks Inactive Summary Manual Summary Progress


Date: Sun 16/07/17 Milestone External Milestone Manual Task Start‐only
Summary Inactive Task Duration‐only Finish‐only

Page 7
ID Task  Task Name System  Duration Start Finish 017 August 2017 September 2017 October 2017 November 2017
Mode Number 06 09 12 15 18 21 24 27 30 02 05 08 11 14 17 20 23 26 29 01 04 07 10 13 16 19 22 25 28 01 04 07 10 13 16 19 22 25 28 31 03 06 09 12 15 18 21 24 2
353 Flow line Purging 1 day Sat 28/10/17 Sat 28/10/17 PIUL/HT
354 KL2 WELLHEAD - KL-02 33101-01 125.5 daysThu 20/07/17 Wed 01/11/17
355 Power System 4 days Thu 20/07/17 Sat 22/07/17
356 Loop Checking 4 days Thu 20/07/17 Sat 22/07/17
357 WHCP Lube Oil flushing and configuration 5 days Fri 28/07/17 Tue 01/08/17 Vendor
358 ESD System ‐ Functional Test 1 day Tue 01/08/17 Wed 02/08/17
359 RTU Comunication test 1 day Wed 02/08/17 Thu 03/08/17
360 HP N2 Leak Test ‐ 33100‐LTL‐290‐001 2 days Sun 29/10/17 Mon 30/10/17 PIUL/HT
361 HP N2 Leak Test ‐ 33100‐LTL‐112‐001 1 day Mon 30/10/17 Tue 31/10/17 PIUL/HT
362 Flow line Purging 1 day Tue 31/10/17 Wed 01/11/17 PIUL/HT
363 KL2 WELLHEAD - KL-39 33101-12 123.13 dayTue 25/07/17 Sat 04/11/17
364 Power System 4 days Tue 25/07/17 Fri 28/07/17
365 Loop Checking 4 days Tue 25/07/17 Fri 28/07/17
366 WHCP Lube Oil flushing and configuration 5 days Tue 01/08/17 Sat 05/08/17 Vendor
367 ESD System ‐ Functional Test 1 day Sat 05/08/17 Sat 05/08/17
368 RTU Comunication test 1 day Sat 05/08/17 Sun 06/08/17
369 HP N2 Leak Test ‐ 33100‐LTL‐290‐008 2 days Wed 01/11/17 Fri 03/11/17 PIUL/HT
370 HP N2 Leak Test ‐ 33100‐LTL‐112‐008 1 day Fri 03/11/17 Fri 03/11/17 PIUL/HT
371 Flow line Purging 1 day Fri 03/11/17 Sat 04/11/17 PIUL/HT
372 KL-2 GATHERING STATION 33102-02 144.88 dayTue 11/07/17 Thu 09/11/17
373  Power System 4 days Tue 11/07/17 Fri 14/07/17
374  Loop Checking 2 days Fri 14/07/17 Sat 15/07/17
375  RTU Comunication test 1 day Sun 06/08/17 Mon 07/08/17
376  HP N2 Leak Test ‐ 33100‐LTL‐112‐009 2 days Sat 04/11/17 Mon 06/11/17 PIUL/HT
377 Trunkline RG1 to GTP 3 days Mon 06/11/17 Thu 09/11/17 PIUL/HT
378 AZSE WELLHEAD - AZSE-3 23101-01 50.38 daysSun 01/10/17 Sun 12/11/17
379 Power System 4 days Sun 01/10/17 Wed 04/10/17
380 Loop Checking 4 days Sun 01/10/17 Wed 04/10/17
381 WHCP Lube Oil flushing and configuration 5 days Thu 05/10/17 Sun 08/10/17 Vendor
382 ESD System ‐ Functional Test 1 day Sun 08/10/17 Mon 09/10/17
383 RTU Comunication test 1 day Mon 09/10/17 Tue 10/10/17
384 HP N2 Leak Test ‐ 23100‐LTL‐338‐001 2 days Thu 09/11/17 Fri 10/11/17 PIUL/HT
385 HP N2 Leak Test ‐ 23100‐LTL‐89‐001 1 day Fri 10/11/17 Sat 11/11/17 PIUL/HT
386 Flow line Purging 1 day Sat 11/11/17 Sun 12/11/17 PIUL/HT
387 AZSE GATHERING STATION 23102-01 49.38 daysThu 05/10/17 Wed 15/11/17
388  Power System 4 days Thu 05/10/17 Sat 07/10/17
389  Loop Checking 2 days Sat 07/10/17 Mon 09/10/17
390  RTU Comunication test 1 day Tue 10/10/17 Wed 11/10/17
391  HP N2 Leak Test ‐ 23100‐LTL‐89‐005 2 days Sun 12/11/17 Tue 14/11/17 PIUL/HT
392 Trunkline RG1 to GTP 1 day Tue 14/11/17 Wed 15/11/17 PIUL/HT

Task Project Summary Inactive Milestone Manual Summary Rollup Deadline

Project: Commissioning Schedule  Split External Tasks Inactive Summary Manual Summary Progress


Date: Sun 16/07/17 Milestone External Milestone Manual Task Start‐only
Summary Inactive Task Duration‐only Finish‐only

Page 8