The quality control plan is very similar to the inspection and test
Home plan, but it is normally a little more detailed than the inspection and
test plan.
GENERAL The purchaser submits the inspection and test plan to the vendor.
This plan is general, and in return, the vendor would submit the
Third Party Inspection quality control plan, which is in greater detail.
Vendor Inspection Then the vendor would prepare the quality control plan in a such
way as to meet the requirements of the inspection and test plan.
Factory Acceptance Test
This plan must be prepared based on the Instruction of
Inspection and Test Plan Vendor Quality Control Manual.
Commodity Inspection There is a frequently asked question about this QC Plan: When
the purchaser submits the inspection and test plan, why it is
Industrial Inspection
necessary that the vendor prepare and submit the quality
Quality Control control plan?
Plant Inspection The answer: In most cases, the inspection and test plan is
general, because the purchaser might not be aware of the
Coating Inspection
details of the design and the characteristics of the equipment,
Pre-Shipment Inspection and it is necessary that the vendor goes through the details
and provides more information about the inspections and tests.
Vendor List
FIX EQUIPMENT
https://www.inspection-for-industry.com/quality-control-plan.html 1/4
م8:00 2022/5/12 Quality Control Plan
Pressure Vessel
Heat Exchanger
Piping System
Industrial Valve
Steam Boiler
Storage Tank
Process Heater
ROTARY
EQUIPMENT
Quality Control Plan - Example
Centrifugal Pump
Take for example a purchaser who submits an inspection and
Centrifugal Compressor test plan to the centrifugal pump vendor and mandates for the
witnessing of performance tests by a third party inspector.
Reciprocating Compressor
Gas Turbine So regarding to the design and characteristics of the pump, the
vendor wants to do the performance test with specific method
Steam Turbine or in several steps, so all of these steps and process would be
API 570 Training These are prepared as guidelines for third party
inspection, but can
be used for quality control as well.
API 653 Training
API 1169 Training There are draft inspection and test plans in each page; you can
download the draft sheet and study the quality control task for
Quality Control Training each equipment type.
CWI Endorsement Training Like Share 2.1K people like this. Be the first of your friends.
https://www.inspection-for-industry.com/quality-control-plan.html 2/4
م8:00 2022/5/12 Quality Control Plan
Water Tube Boiler, Fire Tube Boiler, Shell and Tube Heat Exchanger, Fin Tube
SERVICES Heat Exchanger,Pressure Vessel, Storage Tank, Line Pipe, Steel
Structure, Valve, Fire Alarm
Services System,Fire Extinguisher, Flange, Fitting, Pipe, Hydrant, Paint, Bolt and
Nut, Gasket, Tube, Insulation,Welding Electrode, Gasket, Strainer, Sample
cooler, Steam Trap, Pipe Support, Expansion Joint
GET IN TOUCH
Rotary Equipment Inspection and Test Plan
About Us
Centrifugal Compressor, Reciprocating Compressor, Centrifugal Pump, Gas
Contact Us
Turbine, Steam Turbine,Fan and Blower
Blog
Electrical Equipment Inspection and Test Plan
Privacy Policy
Generator, Power Cable, Induction Motor, Switchgear, Electrical Insulator, Gas
Circuit Breaker,Control Panel, Battery Charger, UPS Storage Battery, Power
Transformer, Bus Duct
We will be updating and growing
this site with more and more of
industrial inspection related Instrumental Equipment Inspection and Test Plan
articles.
Analyzer, Field Control System, Control Valve, Displacer Type Level
Please subscribe to my monthly Transmitter, Electromagnetic Flow Meter, Emergency Shutdown System, Float
newsletter so you don't miss a Type Level Switch, Gas and Flame Detector,Glass Gauge, Instrument Panel and
thing. Gauge Board, Junction Box, Mass Flow Meter,Motor Operated Valve, Orifice Plate
and Flange, Pitot Tube, Pressure Gauge, Pressure Switch,Rupture
Disc, Ultrasonic Flow Meter, Venturi Tube, Vortex Flow Meter
Email
I am at least 16 years of Contractor QC Plan, Quality Control Manuals for Contractors, Quality Control
age. Manual, Third Party Inspection, Pre-Shipment Inspection, Goods Inspection,
Factory Acceptance Test, Shop Inspection, Vendor Inspection, Commodity
I have read and accept the Inspection, Vendor Inspection Services, Goods Inspection Services, Commodity
privacy policy.
Inspection Services, Pre-Shipment Inspection Services, 3rd Party Shop
Inspection, Third Party Inspection for Material Stamp, Third Party Inspection
I understand that you will
Expediting
use my information to send
me a newsletter.
Did you find this article useful? Click on below Like and G+1
buttons!
Like 2.1K
New! Comments
https://www.inspection-for-industry.com/quality-control-plan.html 3/4
م8:00 2022/5/12 Quality Control Plan
Have your say about what you just read! Leave me a comment in
the box below.
1 Comment
Add a comment...
Facebook Twitter
inspection-for-industry.com
https://www.inspection-for-industry.com/quality-control-plan.html 4/4