You are on page 1of 18

GOVERNMENT POLYTECHINC COLLEGE, R.

K NAGAR
DIPLOMA IN ELECTRICAL AND ELECTRONICS ENGINEERING

PROJECT WORK PARTICULARS AS PROPOSED FOR THE ACADEMIC YEAR 2021-2022


GOVERNMENT POLYTECHINC COLLEGE, R.K NAGAR
DIPLOMA IN ELECTRICAL AND ELECTRONICS ENGINEERING
PROJECT TITLE 2021-2022

1. Reduction of Electricity Theft through IOT

2. Four Quadrant DC Motor Controls without Microcontroller

3. Underground Cable Fault Distance Locator

4. Lamp Life Extender by ZVS (Zero Voltage Switching)

5. Industrial Power Control by Integral Cycle Switching Without Generating Harmonics


6. Facts (Flexible Ac Transmission) By TSR ( Thyristor Switched Reactor)
7. Design and Control of Single-Phase Switch Mode Boost Rectifier

8. UPFC Related Display of Lag and Lead Power Factor

Total Number of Batches : 08


Total Number of Students : 48
GOVERNMENT POLYTECHINC COLLEGE, R.K NAGAR

DIPLOMA IN ELECTRICAL AND ELECTRONICS ENGINEERING

Project Work Particulars As Proposed for the Academic Year ( 2021-2022) for Approval

College Address: 140, GOVERNMENT POLYTECHNIC COLLEGE, R.K.NAGAR, CHENNAI-81

Dept / Year / Sem: EEE / III / VI Phone No. 04425912391

Cost Rs: 6000-7000

Dissertation/ Name of the Staff Remarks for


Register
Batch No. Name of the Student Title of the project Fabrication Guide with approval
Number
(or) Both designation
1.ULAGANATHAN J 19301538
2.ABDUL RAHMAN S 20301431 Mr.G.SARAVANAN
3.ABINESH M REDUCTION OF FULL TIME
I 20301432
4.ABISHEK R 20301433 ELECTRICITY THEFT Both TEMPERUARY
LECTURER
5.ARUN KUMAR V 20301436 THROUGH IOT
6.CHANDRU E 20301437

Abstract of the Project Work is enclosed

GUIDE HOD /EEE OFFICE SEAL PRINCIPAL


1. REDUCTION OF ELECTRICITY THEFT THROUGH IOT

Abstract

Nowadays, energy theft is a major problem because it is expensive with fewer resources. The main objective of this

project is to identify electricity stealing, and also checks the usage of energy & informs the customer. In this system, an

IOT network can be developed through WIFI connectivity based Raspberry Pi. If any differences will occur while

utilizing electricity, then the information can be transmitted through the internet to the remote server.
GOVERNMENT POLYTECHINC COLLEGE, R.K NAGAR

DIPLOMA IN ELECTRICAL AND ELECTRONICS ENGINEERING

Project Work Particulars As Proposed for the Academic Year ( 2021-2022) for Approval

College Address: 140, GOVERNMENT POLYTECHNIC COLLEGE, R.K.NAGAR, CHENNAI-81

Dept / Year / Sem: EEE / III / VI Phone No. 04425912391

Cost Rs: 6000-7000

Dissertation/ Remarks
Batch Register Name of the Staff
Name of the Student Title of the project Fabrication for
No. Number Guide with designation
(or) Both approval
1.DHARANl SHANKAR R 20301440
2.DINESH KUMAR R 20301441 Four Quadrant DC Mrs. R.UMA
3.DINESH R S 20301442
II Motor Controls Both FULL TIME TEMPERUARY
4.ESWARAN M 20301444
5.KALAIKANNAN M 20301446 Without LECTURER

6.KARTHIKEYAN A R 20301448 Microcontroller


Abstract of the Project Work is enclosed

GUIDE HOD /EEE OFFICE SEAL PRINCIPAL


2. Four Quadrant DC Motor Controls without Microcontroller

Abstract

The four-quadrant DC motor operation is provided the ultimate solution to industries. In the industries, many

processes are going on wherein the motors are used as per the requirement of the application or load. In which, the

motors they can rotate in clockwise, anticlockwise, and also use and apply brakes immediately in both the

directions. This project is used to control the speed of the DC motor in all four quadrants with the help of a four-

quadrant unit to control clockwise, anti-clockwise, forward brake, and reverse brake modes of a DC motor. This is

an electrical project, but can also do electronic engineering students.


GOVERNMENT POLYTECHINC COLLEGE, R.K NAGAR

DIPLOMA IN ELECTRICAL AND ELECTRONICS ENGINEERING

Project Work Particulars As Proposed for the Academic Year ( 2021-2022) for Approval

College Address: 140, GOVERNMENT POLYTECHNIC COLLEGE, R.K.NAGAR, CHENNAI-81

Dept / Year / Sem: EEE / III / VI Phone No. 04425912391

Cost Rs: 6000-7000

Dissertation/ Name of the Staff


Batch Register Remarks for
Name of the Student Title of the project Fabrication Guide with
No. Number approval
(or) Both designation
1.KARTHIKEYAN M 20301449 UNDERGROUND
2.LAWRANCE M 20301450 Mrs. M.A.JAYALAKSHMI
3.LOKESH S 20301451
CABLE FAULT FULL TIME
III DISTANCE Both TEMPERUARY
4.MANIGANDAN M 20301453
5.MANI MARAN B 20301454 LOCATOR LECTURER
6.MOHAMMED RIYAZ M 20301456

Abstract of the Project Work is enclosed

GUIDE HOD /EEE OFFICE SEAL PRINCIPAL


3. UNDERGROUND CABLE FAULT DISTANCE LOCATOR

Abstract

In the urban areas, the electrical cables run underground in place of running overhead. Whenever any fault occurs

in the underground cable, it becomes very difficult to detect the exact location of the fault for the process of

repairing that particular cable. This project is used to detect the exact point of location of the fault. The system is

intended to detect the location of a fault in underground cable lines from the base station in kilometres. It is one of

the best projects for ECE and EEE engineering students.


GOVERNMENT POLYTECHINC COLLEGE, R.K NAGAR

DIPLOMA IN ELECTRICAL AND ELECTRONICS ENGINEERING

Project Work Particulars As Proposed for the Academic Year ( 2021-2022for Approval

College Address: 140, GOVERNMENT POLYTECHNIC COLLEGE, R.K.NAGAR, CHENNAI-81

Dept / Year / Sem: EEE / III / VI Phone No. 04425912391

Cost Rs: 6000-7000

Dissertation/ Remarks
Register Name of the Staff Guide with
Batch No. Name of the Student Title of the project Fabrication for
Number designation
(or) Both approval
1.MOHAN V 20301458 LAMP LIFE
2.NAVEEN KUMAR U 20301459 EXTENDER BY
3.PRAVEEN RAJ S 20301461
ZVS (ZERO Mr. M.SAKTHIVEL
4.PREMKUMAR J 20301462
IV
5.RAGUL D 20301463 VOLTAGE Both FULL TIME TEMPERUARY
LECTURER
6.RAVI VARMAN S 20301464 SWITCHING)

Abstract of the Project Work is enclosed

GUIDE HOD /EEE OFFICE SEAL PRINCIPAL


4. LAMP LIFE EXTENDER BY ZVS (ZERO VOLTAGE SWITCHING)

Abstract

The lamp life extender is essential to design and develop a device to increase the life of incandescent lamps. Since

the incandescent lamps exhibit low resistance characteristics, therefore, it may lead to damage if it switched at high

currents.

The proposed system provides a solution for the failure of random switching of the lamps by engaging a TRIAC in

such a way that the lamp remains to switch ‘ON’ as the precise time is controlled after detecting the  Zero-crossing

point with respect to the supply-voltage waveforms.


GOVERNMENT POLYTECHINC COLLEGE, R.K NAGAR
DIPLOMA IN ELECTRICAL AND ELECTRONICS ENGINEERING
Project Work Particulars As Proposed for the Academic Year ( 2021-2022) for Approval

College Address: 140, GOVERNMENT POLYTECHNIC COLLEGE, R.K.NAGAR, CHENNAI-81

Dept / Year / Sem: EEE / III / VI Phone No. 04425912391

Cost Rs: 6000-7000

Dissertation/ Name of the Staff


Batch Register Remarks for
Name of the Student Title of the project Fabrication Guide with
No. Number approval
(or) Both designation
Industrial Power
1.RISHI PRAKASH S 20301467 Control by Integral
2.SACHIT S 20301469 Cycle Switching Mr.G.SARAVANAN
without Generating FULL TIME
3.SANDHIRA KUMAR R 20301470
V Both TEMPERUARY
4.SANJEEV VISWAS B 20301471 Harmonics LECTURER
5.SIVAKATHIR VELAN .D 20301474
6.SRIDHAR S 20301475

Abstract of the Project Work is enclosed

GUIDE HOD /EEE OFFICE SEAL PRINCIPAL


5. Industrial Power Control by Integral Cycle Switching without Generating Harmonics

Abstract

The AC power to loads is given through power electronic devices like thyristors. By controlling the switching of
these power electronic devices, the AC power delivered to the load can be controlled. One of the ways is to delay
the firing angle of the thyristor. However, this system generates harmonics. Another way is using integral cycle
switching where one whole cycle or number of cycles of the AC signal given to the load is eliminated completely.
This project designs a system to achieve the control of AC power to loads using the latter method.

Here a zero-crossing detector is used which delivers pulses at every zero crossings of the AC signal. These pulses
are fed to the microcontroller. Based on the input from the pushbuttons, the microcontroller is programmed to
eliminate the application of a certain number of pulses to the opto isolator which accordingly gives triggering
pulses to the Thyristor to make it conduct so as to apply AC power to the load. For example, by eliminating the
application of one pulse, one cycle of the AC signal is completely eliminated.
GOVERNMENT POLYTECHINC COLLEGE, R.K NAGAR

DIPLOMA IN ELECTRICAL AND ELECTRONICS ENGINEERING

Project Work Particulars As Proposed for the Academic Year ( 2021-2022) for Approval

College Address: 140, GOVERNMENT POLYTECHNIC COLLEGE, R.K.NAGAR, CHENNAI-81

Dept / Year / Sem: EEE / III / VI Phone No. 04425912391

Cost Rs: 6000-7000

Dissertation/ Name of the Staff


Remarks for
Batch No. Name of the Student Register Number Title of the project Fabrication Guide with
approval
(or) Both designation
1.SRIRAM P 20301476 FACTS (Flexible AC
2.TAMILSELVAN M 20301479 transmission) by TSR Mrs. R.UMA
3.THANUSH S 20301481 FULL TIME
VI (Thyristor Switched TEMPERUARY
4.VARAPRASAD K 20301482 Both
5.VEDAGIRISHWAR 20301483 Reactor) LECTURER

AR 6.VIGNESH V 20301484

Abstract of the Project Work is enclosed

GUIDE HOD / EEE OFFICE SEAL PRINCIPAL


6. FACTS (Flexible AC transmission) by TSR ( Thyristor Switched Reactor)

Abstract

Flexible AC transmission is essential to achieve the delivery of a maximum amount of source power to the load.
This is achieved by ensuring the power factor to be at unity. However, the presence of shunt capacitors or shunt
inductors across the transmission line causes a change in the power factor. For instance, the presence of shunt
capacitors amplifies the voltage and as a result, the voltage at the load is more than the source voltage.

To compensate for this inductive loads are to be used which are switched using thyristors connected back to back.
This project defines a way to achieve the same by using a Thyristor switched reactor to compensate for the
capacitive load. Two zero crossing detectors are used to produce pulses for every zero crossings of the current
signal and voltage signal respectively.

The time difference between the applications of these pulses to the microcontroller is detected and the power factor
proportional to this time difference is displayed on the LCD display. Based on this timing difference, the
microcontroller accordingly delivers pulses to the OPTO- isolators to drive the back to back connected SCRs to
bring the reactive load or the inductor in series with the load.
GOVERNMENT POLYTECHINC COLLEGE, R.K NAGAR

DIPLOMA IN ELECTRICAL AND ELECTRONICS ENGINEERING

Project Work Particulars As Proposed for the Academic Year ( 2021-2022Approval

College Address: 140, GOVERNMENT POLYTECHNIC COLLEGE, R.K.NAGAR, CHENNAI-81

Dept / Year / Sem: EEE / III / VII Phone No. 04425912391

Cost Rs: 6000-7000

Dissertation/ Remarks
Batch Register Name of the Staff
Name of the Student Title of the project Fabrication for
No. Number Guide with designation
(or) Both approval

1.VTJAYAKUMAR G 20301485 DESIGN AND


2.VISHVA J 20301486 CONTROL OF Mrs. M.A.JAYALAKSHMI
3.YUVARAJ R 20301488
VII
4.YUVARAJ S 20301489
SINGLE-PHASE Both FULL TIME TEMPERUARY
LECTURER
5.AAKASH R 20390293 SWITCH MODE
6.ASLAM BASHA M 20390294 BOOST RECTIFIER

Abstract of the Project Work is enclosed

GUIDE HOD /EEE OFFICE SEAL PRINCIPAL


7. DESIGN AND CONTROL OF SINGLE-PHASE SWITCH MODE BOOST RECTIFIER

Abstract

The project is designed to improve the control technique for raising the efficiency and performance
of the single-phase switch-mode rectifiers. In this proposed system, the switch-mode rectifier
operates at unity power factor and exhibits negligible harmonics in input current and produces
acceptable ripples in the DC bus voltage.

The single phase-switch-mode rectifier comprises a boost converter and auxiliary boost converter.
The boost converter is switched at higher frequencies to produce the shape of the input current
closure of the sinusoidal voltage for eliminating electromagnetic interference. The auxiliary boost
converter operates at a low switching frequency and works as a current course and current deviator
for a DC capacitor of the rectifier. The switch-mode rectifier is the best analog control system
for boost converters.
GOVERNMENT POLYTECHINC COLLEGE, R.K NAGAR

DIPLOMA IN ELECTRICAL AND ELECTRONICS ENGINEERING

Project Work Particulars As Proposed for the Academic Year ( 2021-2022Approval

College Address: 140, GOVERNMENT POLYTECHNIC COLLEGE, R.K.NAGAR, CHENNAI-81

Dept / Year / Sem: EEE / III / VIII Phone No. 04425912391

Cost Rs: 6000-7000

Dissertation/ Remarks
Batch Register Name of the Staff
Name of the Student Title of the project Fabrication for
No. Number Guide with designation
(or) Both approval
1.AVINASH D 20390295
UPFC Related
2.DINESHKUMAR M 20390296
3.HARIHARAN R I 20390297 Display of LAG and Mr. M.SAKTHIVEL
VIII LEAD Power Factor Both FULL TIME TEMPERUARY
4.MUTHURAJ E 20390298 LECTURER
5.VIGNESH R 20390299
6.VIJAYA KANNAN K 20390300
Abstract of the Project Work is enclosed

GUIDE HOD /EEE OFFICE SEAL PRINCIPAL


8. UPFC Related Display of LAG and LEAD Power Factor

Abstract

Generally, for any electrical load like a lamp, a choke is used in series. However, this introduces a lag in the
current compared to the voltage and this leads to more consumption of electrical units. This can be compensated by
improving the power factor.

This is achieved by using a capacitive load in parallel with the inductive load to compensate for the lagging current
and thus the power factor can be improved to achieve a value of unity. This project defines a way to calculate the
power factor of the AC signal applied to the load and accordingly thyristors connected in back-to-back connection
are used to bring capacitors across the inductive load.

Two zero crossing detectors are used- one to get zero-crossing pulses for the voltage signal and the other to get
zero-crossing pulses for the current signal. These pulses are fed to the microcontroller and the time between the
pulses is calculated. This time is proportional to the power factor. Thus the power factor value is displayed on the
LCD display.

As the current lags behind the voltage, the microcontroller gives appropriate signals to the OPTO isolators to drive
the respective SCRs connected in back to back connection. A pair of back to back connected SCRs is used to bring
each capacitor across the inductive load.

You might also like