WORKSHOP 3 (MODULE 3)
SEMESTER II 2020 /2021
QUESTION
Based on drawings for ‘Cadangan Membina dan Menyiapkan Bangunan Tambahan Pejabat
Majlis Daerah Kota Tinggi’ you are required to do a measurement of quantities for Air
Conditioning Installations Split Unit. The quantities measurement shall include the ground floor
only.
Submission
● The duration for quantity measurement is 4 hours (2.00 pm till 5.00 pm)
● Submission should be at 5.00 pm of the workshop time.
● Please clearly write your name and matrix number on the workhop submission
● Please submut in PDF format.
Fakulti Alam Bina & Ukur
Matrix No : A18KE0312
IC No/Passport No : 201808M10174
WORKSHOP 3
AIR CONDITIONING INSTALLATIONS – SPLIT UNIT
TAKING OFF LIST
2 Primary Equipment
FAN COIL UNIT
Wall Mounted Split Unit
a) 10,000 BTUH Nr 5
b) 13,000 BTUH Nr 7
Ceiling Cassette Split
a) 25,000 BTUH Nr 10
b) 30,000 BTUH Nr 12
c) 40,000 BTUH Nr 15
CONDENSOR UNIT
a) 10,000 BTUH Nr 12
b) 13,000 BTUH Nr 14
c) 25,000 BTUH Nr 16
d) 30,000 BTUH Nr 18
e) 40,000 BTUH Nr 20
3 Hanger Nr
4 Pipe works
a) Supply Refrigerant Pipe M 30
b) Return Refrigerant Pipe M 24
c) Condensate Pipe M 21
5 Insulation To Pipe Work M 87
6 Anti Vibration Nr 20
7 Builder’s Work in Connection ITEM 35
8 Electrical Wiring No 55
9 Testing ITEM 2
(100 marks)