Tra Vinh Wind Farm May Report
Tra Vinh Wind Farm May Report
o Background
The Tra Vinh project is in the southwestern part of Vietnam, in the coastal alluvial area of Changlong Commune, a coastal town in Tra Vinh Province. It is an intertidal and offshore project. The project
is in the coastal monsoon tropical climate zone, with a tropical monsoon climate. The annual average temperature is about 26.3℃, the lowest temperature is 24.9℃, the highest temperature is
34.6℃, and the annual average humidity is about 89.46%. It is divided into two different seasons: the rainy season is from May to November, and the dry season is from December to April next year.
o Site Specification
Device name Type Device name Type
Main control system GW MCS05-CTR01 Converter system GW PCS05A-CVT01
Nacelle control system GW MCS05-NAC01 Pitch system GW PS05B-PIH02
Transformer HAINAN JINPAN SCLB11-5000/35 RMU Ormazabal CGM.3
o Report Period (Got the data from the SCADA: 00:00 01st May, 2022--- 24:00 31st May , 2022)
Amendatory Availability
Wind Farm Avg Wind Speed (m/s) Monthly Gross Production (kWh) Production Time (h) Availability (%)
(%)
o Opinion of owner
On behalf of Goldwind International Vietnam Co., Ltd On behalf of Tra Vinh V1-2 Wind Power Plant
By: By:
Signature: Signature:
Date: Date:
1. Operation Data of Report Period (Data from the SCADA: 00:00 01st May, 2022--- 24:00 31st May , 2022)
1 5.78 6.20 1,114.49 8,960,042 8,960,042 831,444 2,478.00 683.15 0.37 0.20 0.00 0.00 5,095.30 743.72 0.00 0.05 99.96 99.95
2 5.77 6.22 1,121.92 9,104,269 9,104,269 837,138 2,639.00 675.89 2.30 0.17 0.00 0.00 5,005.26 741.68 0.00 2.14 99.69 99.69
3 5.79 6.24 1,135.51 9,150,711 9,150,711 847,032 2,421.00 672.73 6.28 6.02 0.00 0.00 5,132.53 737.89 0.00 0.56 99.18 99.16
4 5.84 6.52 1,151.74 5,007,376 5,007,376 858,973 2,284.00 679.19 1.39 0.00 0.00 0.00 2,892.49 742.61 0.00 1.40 99.81 99.81
5 5.80 6.26 1,154.29 9,163,980 9,163,980 861,156 2,572.00 676.92 0.27 0.00 0.00 0.00 5,048.84 743.82 0.00 0.05 99.98 99.96
6 5.88 6.33 1,169.74 9,381,504 9,381,504 872,533 2,441.00 677.53 1.03 0.00 0.00 0.00 5,040.13 743.00 0.00 0.99 99.87 99.86
7 5.78 6.23 1,159.57 8,886,978 8,886,978 864,938 2,447.00 681.10 0.13 0.00 0.00 0.00 4,628.75 743.87 0.00 0.13 99.98 99.98
8 5.85 6.31 1,179.94 9,463,370 9,463,370 880,040 2,420.00 677.92 0.15 0.00 0.00 0.00 5,192.88 743.96 0.00 0.00 100.00 99.98
9 5.92 6.26 1,183.58 9,475,485 9,475,485 882,801 2,458.00 676.30 0.13 0.00 0.00 0.00 5,129.31 744.00 0.00 0.00 100.00 99.98
10 5.90 6.33 1,185.03 8,900,218 8,900,218 883,919 2,530.00 681.12 1.53 0.07 0.00 0.00 4,992.04 742.53 0.00 1.35 99.80 99.79
11 5.94 6.23 1,193.08 9,560,403 9,560,403 889,927 2,534.00 674.01 0.63 0.00 0.00 0.00 5,147.82 743.97 0.00 0.00 100.00 99.92
12 5.91 6.31 1,208.43 9,273,001 9,273,001 901,074 2,261.00 680.84 0.30 0.00 0.00 0.00 5,099.10 743.76 0.00 0.20 99.97 99.96
AVG /
5.85 6.29 1,163.11 106,327,337 106,327,337 10,410,975 29,485.00 8,136.70 14.51 6.46 0.00 0.00 67,319.26 8,921.68 0.00 6.87 99.85 99.84
SUM
1,000,000 99.50
800,000 99.00
600,000 98.50
400,000 98.00
200,000 97.50
0 97.00
WTG01 WTG02 WTG03 WTG04 WTG05 WTG06 WTG07 WTG08 WTG09 WTG10 WTG11 WTG12
Adjusted Availability (%) 99.95 99.69 99.16 99.81 99.96 99.86 99.98 99.98 99.98 99.79 99.92 99.96
Monthly Production (kWh) 831,444 837,138 847,032 858,973 861,156 872,533 864,938 880,040 882,801 883,919 889,927 901,074
1000000 10
800000 8
600000 6
400000 4
200000 2
0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Production (kWh) 189932 52262 339222 279077 585354 707557 1069348 808841 571831 286795 37904 105570 212893 161634 251162 261188 41225 42691 57043 125117 229188 394096 521044 292466 465958 481471 448024 482279 414537 319899 175367
Avg Wind Speed (m/s) 5.21 3.27 5.71 5.67 7.78 8.39 11.4 8.88 7.57 6.04 3.39 4.03 5.13 4.81 5.28 5.47 3.08 2.65 3.23 4.39 5.24 6.43 7.05 5.92 6.91 7.08 6.65 7.1 6.59 5.84 5.06
1 (32008)Heartbeat Signal Lost of 1#Pitch 5.38 The DP connector of the Topbox is damaged
2 (30109)Limit Exceeded of Deviation between Actual and Demand Position of 1#Pitch 0.64 The DP connector of the Topbox is damaged
3 (39030)Pitch(30)Pitch Web switch to pitch cotrol 0.20 Too many input control words due to network latency
NO. WTG Job title Date Stop time Start Time Downtime(h) Work content
1 1 Turbine Fault 12/05/2022 12/05/2022 19:21 12/05/2022 19:33 0.20 Remote reset
2 2 Turbine Fault 02/05/2022 02/05/2022 19:50 02/05/2022 20:00 0.17 Reset via Twincat
3 Turbine Fault 14/05/2022 14/05/2022 01:51 14/05/2022 02:13 0.36 Remote reset via TwinCAT
4 Turbine Fault 14/05/2022 14/05/2022 19:17 14/05/2022 19:46 0.48 Remote reset
5 3 Turbine Fault 14/05/2022 14/05/2022 19:48 14/05/2022 19:50 0.04 Remote reset
6 Turbine Fault 14/05/2022 14/05/2022 19:52 14/05/2022 20:27 0.60 Remote reset
Replace the DP connector from 1# pitch box to topbox - Local
7 Turbine Fault 14/05/2022 14/05/2022 20:53 15/05/2022 01:26 4.54
reset
8 10 Turbine Fault 02/05/2022 02/05/2022 04:52 02/05/2022 04:56 0.07 SCADA reset
No. WTG Software Update Description Responsible Part Start time End time Downtime(h)
(32008)Heartbeat Signal Lost of 1#Pitch heartbeat signal remains Replace the DP connector from 1# pitch box
11 3 15/05/2022 00:00 15/05/2022 01:26 1.43 Goldwind
1#Pitch unchanged. to topbox - Local reset
13 5 (10058)Turbine Stopped by SCADA 11/05/2022 18:00 11/05/2022 18:16 0.27 Remote stop by GW Program Updating Goldwind
16 8 (10058)Turbine Stopped by SCADA 11/05/2022 20:00 11/05/2022 20:09 0.15 Remote stop by GW Program Updating Goldwind
17 9 (10058)Turbine Stopped by SCADA 11/05/2022 20:13 11/05/2022 20:20 0.13 Remote stop by GW Program Updating Goldwind
19 10 (10058)Turbine Stopped by SCADA 11/05/2022 19:06 11/05/2022 20:33 1.46 Remote stop by GW Program Updating and Inspection Goldwind
20 11 (10058)Turbine Stopped by SCADA 11/05/2022 19:18 11/05/2022 19:56 0.63 Remote stop by GW Program Updating Goldwind
21 12 (10058)Turbine Stopped by SCADA 11/05/2022 20:48 11/05/2022 21:06 0.30 Remote stop by GW Program Updating Goldwind
6. Reports
6.1. Service Report
No. WTG Service item Description Process Service time for next time Down time(h) Laborers needed
1 WTG01 Scheduled Maintenance 500 Hours Maintenance Completed Aug-2022 38.27 253.99
2 WTG02 Scheduled Maintenance 500 Hours Maintenance Completed Aug-2022 35.01 210.06
3 WTG03 Scheduled Maintenance 500 Hours Maintenance Completed Aug-2022 33.52 252.97
4 WTG04 Scheduled Maintenance 500 Hours Maintenance Completed Aug-2022 4.23 191.16
5 WTG05 Scheduled Maintenance 500 Hours Maintenance Completed Sep-2022 46.68 347.23
6 WTG06 Scheduled Maintenance 500 Hours Maintenance Completed Sep-2022 31.95 180.69
7 WTG07 Scheduled Maintenance 500 Hours Maintenance Completed Sep-2022 27.21 175.84
8 WTG08 Scheduled Maintenance 500 Hours Maintenance Completed Sep-2022 28.77 131.27
9 WTG09 Scheduled Maintenance 500 Hours Maintenance Completed Sep-2022 32.16 181.71
10 WTG10 Scheduled Maintenance 500 Hours Maintenance Completed Aug-2022 31.85 176.15
11 WTG11 Scheduled Maintenance 500 Hours Maintenance Completed Sep-2022 33.18 186.71
12 WTG12 Scheduled Maintenance 500 Hours Maintenance Completed Sep-2022 29.13 163.02
6.2. CMS alarm reports/Pending repair reports/ RCA & Other Reports
No. WTG NO. Report Name Report Description Date of Delivery Remarks
8. HSE Summary
9. Other relevant worthy mentioned information of this month and following month
Worthy mentioned work which carried out this month
1 Feedback on the technical requirements of the owner's wind power prediction system, and solution tracking
2 Submit Trouble Measure Report
3 Go to sea Troubleshooting
4 Improve the project FEMS system work order
On behalf of Goldwind International Vietnam Co., Ltd On behalf of Tra Vinh V1-2 Wind Power Plant
By: By:
Signature: Signature:
Date: Date: