Suzlon Monitoring Centre Daily Work Sheet

Date: 01/06/2023
Day: Thursday
Attended By: Nandit
Requirements Yes No Comments
Read Emails & notes from prev work shifts
Check all Wind Farms % Dynamic VAr Availability Status OHWF DSTAT2@50% T@90%; HHWF DVar2@50% T@80%
Check All Wind Farms (PPC) Power Plant Controler
Check all Wind Farms Met Masts Availability Status HWF & HHWF MM2 No Comms NBHWF MM1 Wind Speed Error CGWF MM2
Check Weekly Data Gaps & comments for All W/F
Check FM 119, 138 & 207 for All W/F
Check Tilt infolite 3 screen Dispatch, Status regularly
Conform status of all stopped turbines with LT at 5:00pm
SMS Sent for Intruder Alarm at 3:00 pm
SMS Sent for Breakdowns SWF T20, T35; NBHWF T20; T23
Work Needs To Be Done / Information
WLWF: Jayden called to inform that they will be shutting down D & E Circuit. Related alarms will appear on SCADA.
Reece confirmed that T39 at SWF has Gen failure. NBH T23 remains off overnight.

2nd Shift Attended By : Dhruv


Requirements Yes No Comments
Read Emails & notes from prev work shifts
Check all Wind Farms PME % Dynamic VAr Available Status OHWF DSTAT2@50% T@90%; HHWF DVar2@50% T@80%
Check All Wind Farms (PPC) Power Plant Controler
Check all Wind Farms Met Masts Availability Status HWF & HHWF MM2 No Comms NBHWF MM1 Wind Speed Error CGWF MM2
All Wind Farm Daily Reports Email sent
Capacitor check & Email sent
Schedule SMS for over night breakdowns NBH: T11
Check Elec Gen Brushes wornout warn event 421 & Email
Check Mech Gearoilfilter Chokedwarn event 48 & Email
Check Palisade screen Dispatch, Status regularly
Call Personal welfare check 24:00  02:00  04:00 
Work Needs To Be Done / Information
Downloaded Monthly Downtime and All windfarms Appedix A,B & C.
PH Transfer completed.
Breakdown Sms sent for NBH: T61 FM "197 Elec VoltageU1 LowStop"