KTR WEEKLY ACTIVITY REPORT for PAUT on 3Gi

Reported Weld
DATE DAY TEAM Planned / Exectued Activities Completed DELAYS Accept/Reject
Team 1 AM CW-R601A-R602A MUT Misalignmet Report KTR-FGP-0077 100% 01. No Site Delays today N/A
RA/Kairat PM CW-R366A-R351A-202-01 Original Report conversion to KTR 100% 02. R.Ates / Completed final 24 Inch reports in order to clear for After PWHT Inspection N/A
01-Feb Mon
Team 2 AM Scan After PWHT 047 / 00005-21 FW-07C1 TOFD 100% N/A
SB/Timur PM Scan After PWHT 047 / 00005-21 FW-07C1 PAUT 100% N/A

Team 1 AM Quarantine - Transport / Check In N/A 01. R.Ates taken to Quaranrine due to Close contact in Bus seating positive COVID Case N/A
RA PM Quarantine - Weekly meeting & Quarantine mitegation planning N/A 02. Cap removal still in progress for F22 weld Scheduled. Scanning Commenced after lunch and subsequently N/A
02-Feb Tues only 50% was completed
Team 2 AM Scan Before PWHT 047 / 00005-14 / FW-01 0% Accept
SKB PM Scan Before PWHT 047 / 00005-14 / FW-01 50% N/A

Team 1 AM Quarantine - Report and Analysis of 047 / 00005-21 FW-07C1 100% 01. No Data Issued from 02-02-2021 due to scanning delays on 02-02-2021 Accept
RA PM Quarantine - Meetings and planning for Quaranntine N/A 02. No Site Delays today N/A
03-Feb Wed
Team 2 AM Scan Before PWHT 047 / 00005-14 / FW-01 50% N/A
SKB PM Coupon LTCS 12x53 QWT-742 in Calibration Workshop 100% N/A

Team 1 AM Quarantine - Analysis & Report 00005-14-FW01 100% 01. Data Received for QWT-742 & 00005-14-FW01 in The morning Accept
RA PM Quarantine - Analysis & Report QWT-742 100% 02. No Site Delays today Reject
04-Feb Thu
Team 2 AM Scan Before PWHT Coupon QWT-733 TOFD 100% N/A
SKB PM Scan Before PWHT Coupon QWT-733 PAUT 100% N/A

AM Quarantine - Analysis & Report 00005-14-FW01 100% 01. No Site Delays today N/A
Team 1
RA
PM Quarantine - Begin SSA 18x58mm Validation Report ~50 pages 100% N/A
05-Feb Fri
Team 2
AM Scan After PWHT - 00093-12 CW-M253A-M251A-201-01 TOFD 100% N/A

SKB
PM Scan After PWHT - 00093-12 CW-M253A-M251A-201-01 PAUT 100% N/A

Team 1 AM Analyse and Report of Coupon QWT-733 TOFD 100% 01. No Site Delays today Accept
RA PM Analyse and Report of - 00093-12 CW-M253A-M251A-201-01 100% Accept
06-Feb SAT
Team 2 AM Scan Before PWHT - 00005-21 FW-04 (D1.1) TOFD 100% N/A
SKB PM Scan Before PWHT - 00005-21 FW-04 (D1.1) PAUT 100% N/A

Team 1 AM Analysis & Report - 00005-21 FW-04 (D1.1) 100% 01. Rodney: Analysis took time due to multiple Indications. Most are acceptable however 1 must be
confirmed by Manual UT in order to provide the most accurate result. Pending
RA PM Analysis & Report - 00005-21 FW-04 (D1.1) 100%
In the last 2 weeks the root / Hotpass welders are creating an error. Something has changed from previous.
07-Feb SUN AM KTR Sweep Olet report final conversions 100% N/A
02 Shaun: Complete final drafts of KTR Converted Weld-Olet & Trunion Reports to be finalised with Euvgeni
Team 2
SKB PM KTR Sweep Olet report final conversions 100% N/A

Additional Requests for 2 teams Permanent Requests


1 Extention of Calibration Workshop 1 Punch Marks as agreed at 200mm from weld center line in 4 cardinal positions

2 Regular Water Deliveries. Coffee Lady is getting Angry at the local guys for taking 2 Monitor running of heater in Calibration workshop.
water
3 3

4
Week 5 Results
Week 5 Completed Welds
Material & Before / After NDT Request Planned Scanning
Day Date Zone Iso No. Weld No. Construction ID. Analysis Result
Size PWHT No. PWHT Completed

1 Monday 01/02/2021 49A F22 16x52 047-2900-LLL-ISO-000-000-00005-21 FW-07C1 D1.2 After UT.113.Post P-021 Yes Accept

2 Tuesday 02/02/2021 49A F22 16x52 047-2900-LLL-ISO-000-000-00005-14 FW-01 C1.5 Before UT.115 No N/A

3 Wednesday 02/02/2021 49A F22 16x52 047-2900-LLL-ISO-000-000-00005-14 FW-01 C1.5 Before UT.115 Yes Accept

4 Wednesday 03/02/2021 Cal Shed LTCS 12x53 Coupon QWT-742 N/A N/A UT069 100% Reject

5 Thursday 04/02/2021 CAL Shed F22 20x51.5 Coupon QWT-733 NA N/A UT068 100% Accept

6 Friday 05/02/2021 Module F22 20x51.5 047-2900-LLL-ISO-000-000-00093-12 CW-M253A-M251A-201-01 P-021 After UT.112.Post 100% Accept

7 Saturday 06/02/2021 49A F22 16x52 047-2900-LLL-ISO-000-000-00005-21 FW-04 D1.1 Before UT.116 100% Pending MUT
Summary of Welds pending Examination
Active Production Scope Waiting For Inspection (NDT Request Issued) Febuary 2021
Module F22 16x52 047-2900-LLL-ISO-000-000-00065-03 CW-M253A-M252A-015-01 P-003 Before UT.117

Module F22 16x52 047-2900-LLL-ISO-000-000-00005-14 FW-01 C1.5 After UT.115.Post

Backlog of Validated Inspections


49A LTCS 24 x 31 058-2600-LLL-ISO--000-000-00003-17 (24") CW-R361A-R603A-273-01 After UT.22.Post

58 LTCS 24 x 31 058-2600-LLL-ISO-000-000-00004-20 (24") CW-R601A-R602A-202-01 After UT.66.Post

49A LTCS 24 x 31 058-2600-LLL-ISO-000-000-00003-02 (24") CW-R361A-R362A-202-01 After UT.82.Post

49A LTCS 24 x 31 058-2600-LLL-ISO-000-000-00003-22 (24") CW-R366A-R251A-202-01 After UT.30.Post

49A LTCS 24 x 31 058-2600-LLL-ISO-000-000-00003-07 (24") CW-R362A-R363A-202-01 After UT.006.Post

49A LTCS 24 x 31 058-2600-LLL-ISO-000-000-00003-08 (24") CW-R363A-R364A-202-01 After UT.068.Post

49A LTCS 24 x 31 058-2600-LLL-ISO-000-000-00003-13 (24") CW-R364A-R365A-202-01 After UT.023.Post


After Repair &
49A LTCS 12x53 045-2900-LLL-ISO-000-000-00013-26 (12") CW-R363A-R364A-201-01 UT.21.R1.Post
PWHT
Repair Schedule
Repair
Module F22 18x58 047-2900-LLL-ISO-000-000-00055-02 CW-M253A-M253B-003-01 P-058 UT.91
KTR-FGP-0156
Repair
49A F22 16x52 047-2900-LLL-ISO-000-000-00005-08 FW-03 UT.096.R1
KTR-FGP-0162
Repair
Module F22 20x51.5 047-2900-LLL-ISO-000-000-00093-10 CW-M255A-M256A-003-01 P-020 UT.114.R1
KTR-FGP-0203

Non Validated Backlog


Area Size& Material Line Joint Number Priority FAB Date
45 LTCS 3"x16mm 045-2900/ 00013-42 CW-R601A-R602A-201-01 1 27/09/2019
45 LTCS 3"x16mm 045-2900/ 00013-44 CW-R602A-R603A-201-01 1 05/10/2019
47A F22 18"x58mm SSA 047-2900 /00055-01 CW-M253A-M253B-003-02 2 27/11/2020
58 LTCS 12"x17.48 058-2200 / 00015-03 CW-R602A-M615A-249-01 3 27/01/2020
58 LTCS 12"x17.48 058-2200/ 00016-01 CW-R602A-M615A-260-01 3 04/02/2020
58 LTCS 8"x12.7 058-2200/ 00017-01 CW-R602A-M615A-262-01 4 18/02/2020
58 LTCS 8x12.7 058-9200 / 00250-01 CW-R602A-M615A-259-01 4 30/01/2020
58 LTCS 8"x18.26 058-2200/ 00018-01 CW-R602A-M615A-263-01 5 05/02/2020