Suzlon Monitoring Centre Daily Work Sheet

Date: 03/06/2023
Day: Saturday

Requirements Yes No Comments


Read Emails & notes from prev work shifts
Check all Wind Farms % Dynamic VAr Availability Status OHWF DSTAT2@50% T@90%; HHWF DVar2@50% T@80%
Check All Wind Farms (PPC) Power Plant Controler
Check all Wind Farms Met Masts Availability Status HWF & HHWF MM2 No Comms NBHWF MM1 Wind Speed Error CGWF MM1
Check Weekly Data Gaps & comments for All W/F
Check FM 119, 138 & 207 for All W/F
Check Tilt infolite 3 screen Dispatch, Status regularly
Conform status of all stopped turbines with LT at 5:00pm
SMS Sent for Intruder Alarm at 5:00 pm
SMS Sent for Breakdowns HHWF T07, T09; HWF T35

Work Needs To Be Done / Information

Email sent regarding SWF Trip for downtime allocation. Currently its in 197 (started at 21:00 to 21:20), manufacturer.Change allocation according to reply.
Updated Less than 97 Report.
NBWF 23 will be down tonight.
HHWF: T07 needs main bearing inspection, might be down till Monday. T07 will be down tonight, will start tom. T24 is stopped for FM 217, which auto
resets after certain while, keep an eye on it. It it doesn’t reset till 8:00 then schedule the message.
SWF: T101 online time unsure as it was in comms loss.
SWF : T39 has started and has system Ok. Don’t reset any Gen Related alarms in the night.

If disable 4 or more compensation DO's in one WTG inform Lead Tech and Venkatesh Via Email
2nd Shift Attended By : 1) Dhruv
Requirements Yes No Comments
Read Emails & notes from prev work shifts
Check all Wind Farms PME % Dynamic VAr Available Status OHWF DSTAT2@50% T@90%; HHWF DVar2@50% T@80%
Check All Wind Farms (PPC) Power Plant Controler
Check all Wind Farms Met Masts Availability Status HWF & HHWF MM2 No Comms NBHWF MM1 Wind Speed Error CGWF MM1
Power Monitoring analysis
ALL Wind Farm Daily SEA Reports Email Sent
Capacitor check & Email sent
Schedule SMS for over night breakdowns
Check Elec Gen Brushes wornout warn event 421 & Email
Check Mech Gearoilfilter Chokedwarn event 48 & Email
Check Pallisade screen Dispatch, Status regularly
Call Personal welfare check 20:00 22:00 24:00 02:00 04:00

Work Needs To Be Done / Information


Completed Remaining Downtime
OHWF: "Statcom System Warning"and "Statcom LS1 Fault" informed to Wade he said they will look in morning as there is no effect on farm.
Weekly Downtime Checked.

If disable 4 or more compensation DO's in one WTG inform Lead Tech and Venkatesh Via Email