Suzlon Monitoring Centre Daily Work Sheet

Date: 02/06/2023
Day: Friday
Attended By: Nandit
Requirements Yes No Comments
Read Emails & notes from prev work shifts
Check all Wind Farms % Dynamic VAr Availability Status OHWF DSTAT2@50% T@90%; HHWF DVar2@50% T@80%
Check All Wind Farms (PPC) Power Plant Controler
Check all Wind Farms Met Masts Availability Status HWF & HHWF MM2 No Comms NBHWF MM1 Wind Speed Error CGWF MM2
Check Weekly Data Gaps & comments for All W/F
Check FM 119, 138 & 207 for All W/F
Check Tilt infolite 3 screen Dispatch, Status regularly
Conform status of all stopped turbines with LT at 5:00pm
SMS Sent for Intruder Alarm at 3:00 pm
SMS Sent for Breakdowns TBWF T08; SWF T36 T15
Work Needs To Be Done / Information
Kyron called to inform that it was one of the capacitor failure at NBHWF T61, and will have communications loss unless replaced.
Andrew from WLWF called to inform SMC that they are replacing some cooling fans in WTG, acknowledge the upcoming alarms.
Kyron and David Hyland are ON-CALL for NBHWF & TBWF
If there is a reply from Siebert about CGWF downtime allocation, please change and inform to ANUSHA at earliest.

CGWF T7 replace tower lights? Confirm. HHWF T03, 17. SWF T9 graham lang, blade repairs completed at SWF?
2nd Shift Attended By : Dhruv
Requirements Yes No Comments
Read Emails & notes from prev work shifts
Check all Wind Farms PME % Dynamic VAr Available Status OHWF DSTAT2@50% T@90%; HHWF DVar2@50% T@80%
Check All Wind Farms (PPC) Power Plant Controler
Check all Wind Farms Met Masts Availability Status HWF & HHWF MM2 No Comms NBHWF MM1 Wind Speed Error CGWF MM1
All Wind Farm Daily Reports Email sent
Capacitor check & Email sent
Schedule SMS for over night breakdowns NBH: T54, T61; SWF: T19, T101; HHWF: T07
Check Elec Gen Brushes wornout warn event 421 & Email
Check Mech Gearoilfilter Chokedwarn event 48 & Email
Check Palisade screen Dispatch, Status regularly
Call Personal welfare check

Work Needs To Be Done / Information


SWF windarm Tripped and MM1 no comms. And Setpoint is 5 MW.@18:03 PM. Informed to client and on call HVO.
SWF: T1 to T11 having FM 92 & T44 comm loss during PME's Trip.
Called David to check about PME's, he acknowledged that PME's are back online but CG1 is still tripped due to Line to earth fault so they are going to site to recover it.
@9:04 PM
CG1 of SWF was back to normal @9:10 PM and informed to client.
SWF: Randal called to stop T09 as he thought it’s a blade repair going on, than I told him that work was completed in afternoon so started the turbine again.
Completed Yesterday's Downtime.
Completed Less Than 97 & 95, just CGWF windfarm remaining.
Please send the mail in morning regarding downtime allocation for SWF Trip.