Professional Documents
Culture Documents
GSU Log:
GSU No. OFF Time ON Time GSU Alarm Action Taken Status
WTG Log:
HAWA 04 07:31 07:33 Tripped 157_Secondary rotor brake does not close Soft Reset
BOP Work Details (By FC Team): Other Activities (By Client, Contractor, 3rd Party):
Plant Isolation under RISSP ☐ Yes ☒ No Plant Normalization under RISSP ☐ Yes ☒ No
Checklist Issues:
• T/F-01 HAWA PT (Red & Blue Phases), NTDC PT (Red Phase), 132
kV Busbar-01 PT (Yellow Phase) oil leakage was observed. Other Instructions :
• UPS is required for 132kV Fault Recorder System for backup during
grid failure.
• WTG #22 camera communication failed