You are on page 1of 1

Shift Report for Control Room Operations Team

Said Khalid Shah


Night Shift HAWA Energy (Pvt.) Limited 20-March-2021
Shift Change Status:
Load = 1 MW WTG Status BOP and GE Scada Time Synchronized?  Yes ☐ No
Wind Speed = 3.9 m/s Tripped= 0 Stopped= 0
Any WTG/BOP work that will continue in next shift? Details of WTG/BOP work that will continue in next shift
☐ Yes ☒ No
Any Customer Work that will continue in next shift? Details of Customer work that will continue in next shift
☐ Yes ☒ No
SVC 1 ☐ ON ☒ OFF
 Normal
Grid SVC 2 ☐ ON ☒ OFF Weather Status:
☐ Planned Shutdown
Status : Curtailment ☐ Yes ☒ No Low wind was observed with clear weather whole night.
☐ Grid Outage
EDG Fuel Level = 80 %

Shift Activities Details:


Alarms on Relay Panel’s
Panel Name Alarm Action Taken
Acknowledge and reset but alarms are still persisting.
Fire Alarm Control Kitchen, Explosion-proof
Informed to Service Team.

Grid Outage during shift Grid Restore during shift


☐ Yes ☒ No ☐ Yes ☒ No Curtailment during shift ☐ Yes ☒ No

GSU Log:
GSU No. OFF Time ON Time GSU Alarm Action Taken Status

WTG Log:

WTG No. OFF Time ON Time Type Alarm Code Details

HAWA 04 07:31 07:33 Tripped 157_Secondary rotor brake does not close Soft Reset

BOP Scada General Alarms: SERGI MT 1 SERGI MT 2

BOP Work Details (By FC Team): Other Activities (By Client, Contractor, 3rd Party):

Plant Isolation under RISSP ☐ Yes ☒ No Plant Normalization under RISSP ☐ Yes ☒ No

Checklist Issues:
• T/F-01 HAWA PT (Red & Blue Phases), NTDC PT (Red Phase), 132
kV Busbar-01 PT (Yellow Phase) oil leakage was observed. Other Instructions :
• UPS is required for 132kV Fault Recorder System for backup during
grid failure.
• WTG #22 camera communication failed

You might also like